Title: HCAL DCS


1
HCAL DCS
  • HCAL DCS
  • for the
  • Beam test 2003

2
To be done for BT03
  • Source debugging toolkit (IS, EV, SS?)
  • B. 186 ASAP for wedge testing
  • HF June 10
  • HB July 10
  • CCM/CCA (SH,SS,JM)
  • May 1
  • CCM/Q Inj (SH,SS,JM?)
  • May 1
  • CCM/LED (SH,SS,JM?)
  • July 15
  • RS/RS hub (SS, Gorbunov)
  • ???????

3
RA source toolkit
EV
Source toolkit
Monitoring DIM client
RS485
EV
IS
Debugging tools
RA source mechanics
RA source Control box
RA source DIM server
DIM browser
?
Source emulator?
Cash file
EV
HF DAQ DIM client
HF DAQ
DIM
SS
Tubes lengths
PVSS DIM client
PVSS DCS
Partially done
Missing
Conditions DB (Oracle via ODBC)
Low priority?
To be defined
  • To provide long term maintenance, the source
    toolkit should contain full set of the debugging
    tools

4
CCM/CA, /LED, /QInj (I)
Conditions DB (Oracle via ODBC)
Run control
Configuration DB (Oracle via ODBC)
DCS, Run control, Monitors
?
CCM Source file
TTC Clock
Serial link Initialization
TTC Clock
TTC Clock
DIM
Command to recompile
TTC Clock
Status
Comds
QIE pedestals
QIE pedestals
CCM debugger
CCM Binary file
CCM server
Frame sets for different run conditions
QIE pedestals
QIE Pedestals
CCM run mode Selection tool
QIE Gain
QIE pedestals
QIE pedestals
QIE Gain
LED initialization
Debugging and testing
Normal work
CCM
QIE Q-Injection
Missing, to be completed by May 1
5
Command sequence (I)
  • At the beginning of the run the control system
    must provide
  • Receive the run conditions
  • Assemble the source file if needed
  • Compile source to binary if needed
  • Download binary file to CCM

6
CCM/CA, /LED, /QInj (II)
Conditions DB (Oracle via ODBC)
Run control
DCS, Run control, Monitors
?
Configuration DB (Oracle via ODBC)
CCM Source file
Serial link Initialization
DIM
Command to recompile
TTC Clock
Status
Comds
CCM debugger
CCM Binary file
CCM server
CCM run mode generation tool
QIE pedestals
QIE Gain
LED initialization
Debugging and testing
Normal work
CCM
QIE Q-Injection
7
Command sequence (II)
  • At the beginning of the run the control system
    must provide
  • Receive the run conditions
  • Generate the source file if needed
  • Compile source to binary if needed
  • Download binary file to CCM

8
Command sequence (III)
  • At the beginning of the run the control system
    must provide
  • Receive the run conditions
  • Generate the binary file if needed
  • Download binary file to CCM

9
CCM configuring tool
  • Possible logical position of the CCM run mode
    control window
  • Existing Run control
  • RCMS prototype
  • PVSS layer
  • Independent tool
  • Configuring tool needs Data Base!!!

10
HCAL monitoring path
Laser, RBXs, Sources
HCAL host
Private system servers (PVSS systems)
HV,LV
HF radiation monitoring
User PCs (PVSS Uis)
Industrial PC, Linux
Industrial PC, Linux
Counting room
PCI interface
RS485
HV power supplies
RS422 fan-out
HV power supplies
RS422 fan-out
Drivers for tmp srcs
14 permanent drivers
200m
RS422
RS485
To sources
To temporary sources
Hub-18 RS/RS
Hub-18 RS/RS
RS422
Cavern
Truncated CCM
Do we test the RS/RS hub this year?
RBX
LV power supply
RBX
LV power supply
RBX
LV power supply
CCM
18 RBXs
11
Control data flow (02)
Data stream
Debugging tools
Alarming
HV monitoring
RBX monitoring
DAQrun control (JAVA)
Beam-line status display
DIM
DIM server
HV DIM server
CCM DIM server
Temperature DIM server
RA source DIM server
Beam-line status DIM server
RS485 RS422
Socket server
NI DAQ board
Beam-line status file _at_daq_PC
RS485
RBX1
Beam-line status file _at_eanorth
Moving table
HV power supply
RA source driver
Thermo-sensors
RBX2
12
Control system structure(I)
DAQ PC (Linux)
Log File
Log File
Log File
RA source control
Alarming
HF table control
Data stream
Log File
Log File
Log File
Log File
Config tool
HV monitoring
RBX monitoring
DAQ run control (JAVA)
Beam-line status display
HVrecorder
Log File
DIM
Config tool
HB table server
HV server
CCM server
Temp. server
RA source server
H2 Beam-line status server (old )
HF table server
H2 Beam-line status server (IT/CO)
Log File
Log File
Log File
Log File
Log File
Log File
Commands history log files
Windows Slow control PCs
13
Control system structure(II)
DAQ PC (Linux)
Local DCS PVSS layer
Data archiving, monitoring, alarming
Data stream
Log File
HV monitoring
RBX monitoring
DAQRCMS
Beam-line status display
HVrecorder
Config tool
Claimed that works
DIM
HB table server
HV server
CCM server
Temp. server
RA source server
H2 Beam-line status server (old)
HF table server
H2 Beam-line status server (IT/CO)
Log File
Log File
Log File
Log File
Log File
Log File
Command history log files
Windows Slow control PCs
14
Interfaces test? (BT03)
CMS run control
Central DCS
DAQ
?
HCAL
ECAL
Muons
Local R/O
HO
HF
HB
HE
Could be partitioned
HE
HE-
Wedge1
Wedge3
HPD1
HPD4
HV
BV
HCAL private control system (PVSS II)
V0
Vmon
Imon
15
Urgent questions
  • What architecture should be used during Beam-Test
    03?
  • Do we use PVSS to provide slow control?
  • Who develops CCM configuring tool?
  • Who develops DB connection?
  • PVSS development takes quite long time so the
    answer is needed ASAP.
  • Deadline March 15.
  • After 15.03 no PVSS!