Title: City Engineering Update for the Citizens Academy


1
City Engineering Updatefor theCitizens Academy
  • September 24, 2008

CITY ENGINEERING
2
Agenda
  • City Engineering Mission
  • Organizational Structure Budget
  • Major Objectives
  • Accomplishments (2007-2008)
  • PPRTA Capital Projects
  • PPRTA Maintenance Transit
  • Stormwater Enterprise
  • ________
  • Pikes Peak Rural (Regional) Transportation
    Authority

CITY ENGINEERING
3
City Engineering Mission
  • To provide
  • Safe, efficient and completely accessible street
    systems
  • Dependable stormwater flood control facilities
  • Water quality controls and environmental
    protection
  • Professional development plan reviews and
    inspections and
  • Permitting and inspection of construction
    activities within the Citys rights-of-way.

4
City Engineering
Organization
Budget
City Engineering 70 FTEs 7 Contracted
Roadway Engineering Team
Stormwater Enterprise (SWENT)
Subdivision Engineering Review Team (SERT)
5
Major Objectives
  • Perform engineering design, surveying, project
    management, and construction inspection
  • Manage, design, and construct roadway and
    stormwater capital improvements projects
  • Update engineering design criteria/specifications
  • Enforce engineering standards by issuing permits
    and performing construction inspections
  • Review engineering plans of new developments to
    include drainage reports, geological hazards
    studies, grading/erosion control plans, and
    street and drainage construction plans

6
Major Objectives (contd)
  • Protect drainageways and comply with stormwater
    environmental regulations
  • Manage the Citys bridge assets
  • Ensure compliance with ADA regulations in the
    public right of way
  • Provide liaison with CDOT, El Paso County,
    surrounding communities and other agencies
  • Provide customer service for a variety of public
    right of way matters

7
Key Programs
  • PPRTA Pikes Peak Rural Transportation Authority
  • SWENT Stormwater Enterprise
  • SERT Subdivision Engineering Review Team

8
PPRTA Creation
  • Established by a vote of the citizens in Nov 2004
  • Stipulated funding source would be 1 cent sales
    tax in member entities
  • Revenue distribution for capital projects (55),
    maintenance (35), transit (10) administration
  • Stipulated 10-year sunset for capital portion
  • Citizens Advisory Committee to support
    implementation

9
Revenue Expenditures (2007)
  • Revenues
  • Sales Use Tax 70.4 M
  • Transit Fare Box 0.717 M
  • Interest Earnings 3.250 M
  • State Tax Col Fee ( 0.370 M)
  • Expenditures
  • Capital 36.7 M
  • Maintenance 28.6 M
  • Transit 8.0 M
  • Administration 0.454 M

10
Revenue Expenditures (2008)
  • Revenues
  • Sales Use Tax 69.5 M
  • Transit Fare Box 0.5 M
  • Interest Earnings 2.0 M
  • State Tax Col Fee ( 0.25 M)
  • Expenditures
  • Capital 39.1 M
  • Maintenance 24.8 M
  • Transit 7.7 M
  • Administration 0.51 M
  • Carry-over Unspent 52.5 M

11
Colorado SpringsVicinity Map
MANITOU SPRINGS
Projects either under construction or about to go
to construction
Completed Project PPRTA Project HES 2004
Project HES 2007 Project City General Fund

SECURITY
WIDEFIELD
12
Austin Bluffs Interchange at Union
Boulevard
Program Budget PPRTA 35,781,318 Construction
Start Date January 2007- Lawrence Construction
Co. Project Status Under Construction, expected
completion November 8, 2008
13
Program Budget (I-25 to
Powers) PPRTA 64,149,864
Federal
Grant Funds 34,382,183
City CIP
5,170,000
TOTAL 103,702,000 Construction Start Date
Early 2009. Project Status Federal
Environmental Process (FONSI) is complete final
design is completed, and ROW acquisition will be
90 complete at the end of 2008.
Woodmen Road Widening Interchange

Phase 1 (Campus Drive to Bell Drive) 51,295,000
14
Program Budget PPRTA 53,065,600 Construction
Start Date 2010 Project Status Design is
50complete, ROW acquisition continuing
Milton E. Proby Parkway Academy to Powers
15
Program Budget PPRTA 8,574,681 Construction
Start Date November 2007 - Lawrence Construction
Co. Project Status Under construction
Partial opening 5/15/08 Project complete
8/30/08
Cimarron Street Bridge
Project limits
16
Program Budget PPRTA
1,177,519 CSU/Transit/Planning
242,500 Construction Start Date Spring
2008 Project Status 30 complete Dec 08
completion date
Constitution/Circle
Trail
Trail
17
Fillmore/El Paso
Program Budget PPRTA 351,560 HES
225,000 Construction Start Date Spring 2009
Project Status Finalizing ROW Appraisals and
Acquisitions
18
Program Budget PPRTA 500,000 CDOT
400,000 Construction Start Date Summer 2009
Project Status Final Design at 80
Las Vegas/Royer Railroad Crossing Improvements
Railroad
Las Vegas Street
Royer
19
HES 2004 (2 Intersections)
Fountain Chelton Program Budget HES
700,000 Stormwater Enterprise 750,000 Constructi
on Start Date Spring 2009 Project Status Final
Design completed
Chelton
Fountain
Dublin Academy Program Budget HES
675,000 Construction Start Date Spring
2009 Project Status Final Design completed
20
HES 2007
Airport Powers Program Budget HES
250,000 Construction Start Date Ph 1 completed
Ph 2 in 2010 Project Status Final Design
completed
Powers Blvd.
Peterson Air Force Base
Airport Rd.
Stuart Rd.
21
Broadmoor Bluffs Drive Stabilization Program
Budget General Fund 250,000 Legal
Settlement 1,550,000 Construction Start Date
November 2007 - Blue Ridge Construction
Co. Project Status Caisson installation
completed in January 2008, street
improvements are completed.
Broadmoor Bluffs Drive Stabilization

22
Street Maintenance (Colo Spgs)
  • 2007 2008
  • Street Resurfacing 34 mi. 35 mi.
  • Alley Paving 3.5 mi. 0
  • Pothole Patching 57,830 TBD
  • Curb Gutter 15 mi. 13 mi.
  • Sidewalk 10 mi. 6 mi.
  • Pedestrian Ramps 545 385
  • Bridge Repairs 38 30

23
Traffic Maintenance (Colo Spgs, 2007)
  • Rebuilt Traffic Signals 16
  • Traffic and Safety Improvements 18
  • Replacement of Traffic Bulbs with Brighter
    Energy- Saving LED Bulbs 5,846
  • Replacement of Walk/Dont Walk Signs 1,000
  • School Crosswalk warning legends 1,119
  • School Crosswalks 600
  • Street Lane Striping 2,153 miles

24
Challenges for PPRTA
  • Public Outreach
  • Keep the public involved
  • Create attention for the Projects
  • Public Trust
  • Remain efficient effective
  • Keep overhead low
  • Prepare for the renewal of the Capital program
    by 2014.
  • Respond to requests for new members.

25
  • Stormwater Enterprise

A One Year Look Back, 2007 - 2008
26
Brief Background
  • History of flooding in Colorado Springs (refer to
    handouts)
  • 1977 Federal Clean Water Act
  • 1980s Stormwater Utilities / Enterprises began
    to be formed in Colorado
  • Dedicated funded necessary to address
  • Flooding
  • Water Quality
  • Early 2000s CTAB requested to study options,
    make recommendations to Council

27
Brief Background (contd)
  • Jun-Oct 2005 Task Force developed initial
    recommendations
  • Dec 2005 City Council established the
    Stormwater Enterprise by ordinance
  • Jan-Oct 2006 Public input on proposed fee
    structure
  • Nov 2006 City Council set the fee structure by
    resolution
  • Feb 2007 First bills mailed to property owners

28
Funding
  • Fee revenue will generate approximately 15M
    annually
  • Fee revenue is used for capital improvement
    projects, maintenance activities and business
    operations
  • General Fund pays 2.5 M annually
  • 2.3 M for Stormwater Programs and 0.2 M for
    City Fees
  • General Fund maintenance of effort (2.3M) funds
    permit-related activities and Drainage Basin
    Planning Studies

29
Capital Improvement Projects
  • 66.5M backlog in critical projects identified in
    2005 (24 projects)
  • 295M overall C.I.P. backlog
  • Numerous capital projects currently underway
    (design or construction) on
  • Sand Creek
  • West Fork Sand Creek
  • Cottonwood Creek
  • Fountain Creek
  • Fountain Blvd./Chelton Rd. roadway drainage

30
Sand Creek Stabilization - Before
31
Sand Creek Stabilization Nov. 2007
32
Sand Creek Platte to Constitution - Before
33
West Fork Sand Creek (Oro Blanco)-Before
34
Cottonwood Creek (Monument Creek to Academy
Blvd.) - Before
35
Cottonwood Creek (Union Blvd. to Rangewood Dr.) -
Before
36
Fountain Blvd./Chelton Rd. Intersection - Before
37
Douglas Creek - Before
38
Monument Creek Crib Wall - Before
39
Monument Creek Crib Wall After (Emergency
Repair Funding)
40
Maintenance
  • Previous efforts more than doubled
  • 3 types of maintenance Rehabilitation,
    Restoration and Routine
  • Street Division shares resources
  • Staff time spent on drainage repairs is charged
    to the enterprise
  • Staff time spent on other Street Division
    activities (street paving, snow removal, etc.) is
    charged to the general fund

41
Maintenance
  • Completed 10 planned projects in 2007, plus more
    than 30 emergency repair projects
  • 29 projects scheduled in 2008
  • Maintenance projects are in addition to regular
    and emergency duties such as debris removal,
    catch basin cleaning, mowing, and storm damage
    repair

42
Sand Creek (Oglebay Norton) - Before
43
Sand Creek (Oglebay Norton) - After
44
Channel Replacement - Before
45
Channel Replacement/Rehab Project
46
Sand Creek Island Removal - Before
47
Sand Creek Island Removal - After
48
31st St. Channel Vegetation Removal-Before
49
31st St. Channel Vegetation Removal - After
50
Detention Pond 1 Sediment Buildup
51
Detention Pond 1 2005 Cleaning
52
Emergency Repairs
  • Before the Stormwater Enterprise, little to no
    funding for small scale emergency repairs
    reported by citizens
  • Usually within neighborhoods and causes
    continuing damage to both public and private
    property
  • Stormwater Enterprise budget programs 900,000
    per year

53
August And September Events

54
Platte Avenue Bridges _at_ Sand Creek

55
Platte Avenue Bridges _at_ Sand Creek 6 Hours

56
Platte Avenue Bridges _at_ Sand Creek 24 Hours

57
Platte Avenue Bridges _at_ Sand Creek - Downstream

58
Platte Avenue Bridges _at_ Sand Creek - Downstream

59
West Fork Sand Creek (June 2005 damage)
60
West Fork Sand Creek repaired 2007
61
Safety Improvements Education
  • Over 200 sites were identified and evaluated in
    2007 for safety improvements
  • Priority given to locations near schools, parks,
    neighborhoods, etc.
  • Some hard improvements made in 2007 more
    scheduled for 2008
  • SWENT also funds Flash Flood Warning and
    Education Program

62
Safety Improvement at Meadow Ridge and Austin
Bluffs - before
63
Safety Improvement at Meadow Ridge and Austin
Bluffs - after
64
Challenges
  • Billing system issues
  • Public information, perceptions
  • Huge infrastructure problems
  • Getting projects designed and built quickly
  • Basin studies and impact fee program
  • Getting beyond crisis management

65
How Can You Help?
  • Provide advice on Job Order Contracts for
    Stormwater Bridge repair projects.
  • Are there other contracting methods or provisions
    that keep costs reasonable?
  • Get facts on legitimacy of the Stormwater
    Enterprise fees.
  • Get facts about the ballot questions for Nov 2008.

66
Thank You!