Title: Status of QC at various production sites
1Drift Tube QC Meeting CMS meeting Catania
18th June 2001
- Status of QC at various production sites
- Compoments Bologna/Protvino
-
Torino - Chamber Aachen,
Madrid, Padova -
- - Data Base status report
Simone, Marina - - AoB
2- New Version of the QC document
- Version 6.2
- http//www.to.infn.it/activities/experiments/
- cms/QualityControl.html
- Modifications w.r.t. to 6.1 version
- - Bar Code numbers reserved for Alignment items
- - Added tables defining NEW Specific Code
-
3QC for AL Plates production
- Status of QC for Al Plates production
- Exercise to test the QC procedure foreseen
- in the document
Assembly step QC step Status of QC
Identify Al plates box Identify Al strip and Mylar strip batch Check raw plates
Cut plates ID Al plates
Deposit strips Measure Al plate geometry (length, width, diagonals) with camera Measure position of strips
4QC for AL Plates production
Assembly step QC step Status of QC
HV test Fast Test increasing voltage up to 4 kV, 500V/sec Standard test Test on single plate 4 strips granularity increasing voltage up to 4 kV, 50V/sec Keep voltage for 30 min Measure currents (offsets) SY527 Failure recovery cases sparks moderate currents (O(microA))
Temperature, Pressure and Humidity Recorded each step of production
5Production Data Base
QC for AL Plates production
- A window panel is provided
- to the operator to follow the steps of the
production workflow. - All data are recorded automatically
- into an Excel file.
- A traveler file associated to each plate
- is also automatically generated.
- Record data into Production Data Base
-
-
-
6Production Data Base
Info in Data Base - change proposal
- Bar code classification 8 surfaces
- DataBase classification 5 plates
- The up surface is identifying the plate
- In the Data Base
- AlRaw OPERATION BATCH NUMBER SITE
DATE - Plate ID_PL LX LY BATCH NM VER
DATE - PlateComment ID_PL Batch_mu Batch_Pechiney
Batch_MyInd - Batch_AlInd
- PlateEnv ID_PL TEMP HUMID PRESS DATE
TIME COMMENT - PlateChangeStripBatch ID_PL SIDE
NUMBER Batch_mu - PlateChangeMylarBatch ID_PL SIDE NUMBER
Batch_mu - PlateDimTest ID_PL n_measurments LOCATION
DATE - PlateNomPosStrip ID_PL A C E NSTRIP
LSTRIP - PlateMeasAllStrip ID_PL TYPE NM MEAS(1)...MEAS(NM)
7Production Data Base
Quality Control Meeting summary CMS meeting
Catania 18.06.2001
- Status of QC Al-Plate production in Torino
Silvia - Status of QC Chamber production in Aachen and
Legnaro -
Hans ,
Ezio - - QC procedures and tests during production
follow - the Document
- - Check during production List of QC
tests -
QC flow diagrams -
QC tests numbers - Provide the operator of synthetic
instructions possibly written in mother language - Production Data Base
Simone, Marina - - Al-Plates component information will be
adapted to the existing DB
structure. ( Only part of information will be
stored) - - Use of real Data Cards to build SL
- - Send and Receive actions implemented in
the Java Interface