Title: Diapositiva 1
1Meeting in Nantes4-5 November 2004 REVIVAL EU
Proj. NO. NNE5-597-2001
The Meyer Hospital in Florence
2- Genral Objectives of the third phase
I- General Project
The overall objective of the Meyer project is to
demonstrate how a holistic approach to the
internal and exterior refurbishment of existing
offices can provide energy efficient working
environment with also the inclusion of some new
extension (the green house used as general hall
and the new staircases and elevator units). The
main purposes of this third report period have
been to verify using simulation tools how design
strategies and technical solutions match the
general aims of the project and also demonstrate
how they really assure comfort level and
parameters set in the preliminary design phase,
then using results to come to a final design of
components ( grids, panels, windows..) and
plants.
II- Materials and devices
III- Contract Changement
IV- Dissemination
3- Genral Objectives of the third phase
I- General Project
On-going Energy and Environmental Package
II- Materials and devices
III- Contract Changement
- HVAC System improvements
- Optimisation of the HVAC system through advanced
local control - Use of condensing boiler
- BMS enhancement to get the heat from the
greenhouse into the officies
IV- Dissemination
The HVAC design will be completed after final
checks and adjustements derived from the energy
simulations
4I- General Project
On-going Construction phase
THE PAVILLIONS
5I- General Project
On-going Construction phase
II- Materials and devices
THE GREEN HOUSE
6I- General Project
On-going Construction phase
II- Materials and devices
III- Contract Changement
IV- Dissemination
7I- General Project
On-going Construction phase
II- Materials and devices
III- Contract Changement
IV- Dissemination
8I- General Project
On-going Construction phase
II- Materials and devices
III- Contract Changement
9I- General Project
On-going Construction phase
II- Materials and devices
III- Contract Changement
10I- General Project
On-going Construction phase
The Meyer Project
II- Materials and devices
III- Contract Changement
11I- General Project
On-going Construction phase
II- Materials and devices
III- Contract Changement
IV- Dissemination
12I- General Project
II- Materials and devices
Use of high performances glasses
III- Contract Changement
IV- Dissemination
13I- General Project
Use of curtains installed inside the innerair
glass
Questa caratteristica del sistema ScreenLine
garantisce un'assoluta protezione dalla polvere,
evitando qualunque intromissione dello sporco
all'interno del vetrocamera. Il che permette alle
tende di presentarsi sempre come nuove,
eliminando tutte le difficoltà di pulizia e
manutenzione che presenta una normale tenda
esposta all'aria.
II- Materials and devices
III- Contract Changement
IV- Dissemination
The use of curtains inside a innserair glass
improves control of solar radiation, also
stopping incoming of infrared and UV radiations,
responsable for internal over heating and
cromatic deterioration of furnitures and floors.
14I- General Project
II- Materials and devices
This sistem is based on a movement transmission
usign a magnet. The magnetic force, produced by
the coupling of two magnets (located inside and
outside the glass), is used to produce lifting
and direction movements. This configuration
assures a total protection from dust, avoiding
dirt infiltration inside the glass. Curtains
remain new and clean and thei dont need
maintenance as the one facing out.
III- Contract Changement
IV- Dissemination
The magnetic force is eternal and resistant to
high temperature. The useful life of megnets is
unlimited
15I- General Project
Use of grids installed under the windows frame
Windows will be provided by special grids,
integrated in the windows frames , which can be
easily kept open in order to improve stack effect
and cross ventilation
II- Materials and devices
III- Contract Changement
Use of electric control blinds
Windows will be provided by automaitc devices to
open and close external blind
IV- Dissemination
16I- General Project
The Meyer Hospital director is now Mr. Colombo,
so we have to change the person in charge for the
REVIVAL contract as Italian Partner
II- Materials and devices
III- Contract Changement
IV- Dissemination
17- Strategy for Dissemination
I- General Project
II- Materials and devices
III- Contract Changement
IV- Dissemination
Several papers and presentations (oral or poster
session) about REVIVAL project has been done in
order to disseminates the objectives of the
project and the partial results.
18- Strategy for Dissemination
I- General Project
In particular has been published the following
papers 1. Bioclimatic strategies for the
restoration of old buildings the REVIVAL
project on proceedings of ABITA National
Meeting I percorsi della progettazione per la
sostenibilità ambientale carried out in
Florence 20-21 October 2004. 2. Dovè
architettura on architectural magazine Energia
Solare FV n3 anno 2004 3. Fotovoltaico e
progetto on architectural magazine Costruire
Dossier n255 anno settembre 2004 Moereover has
been realised the following poster to present at
the 2004 Summer Academy in Rome
II- Materials and devices
III- Contract Changement
IV- Dissemination
19- Strategy for Dissemination
I- General Project
II- Materials and devices
III- Contract Changement
IV- Dissemination
20- Strategy for Dissemination
I- General Project
Web-site of REVIVAL in Italian language
II- Materials and devices
III- Contract Changement
http//www.taed.unifi.it/abitaweb/hospital/revival
.htm Made by MSA
IV- Dissemination
Why an Italian Website - its one of the best
diffusion system - reachable from
any internet work station
21- Strategy for Dissemination
I- General Project
REVIVAL EU Proj. NO. NNE5-597-2001
The official REVIVAL web site
II- Materials and devices
III- Contract Changement
IV- Dissemination
22- Strategy for Dissemination
I- General Project
II- Materials and devices
III- Contract Changement
IV- Dissemination
23- Strategy for Dissemination
I- General Project
II- Materials and devices
III- Contract Changement
IV- Dissemination
24- What do we suggest for dissemination?
I- General Project
5 websites, one for each country, in a local
language
In each website a link to the others REVIVAL
websites
II- Materials and devices
Into the Official REVIVAL website, a link to
national websites
Write into articles the local REVIVAL website and
the official REVIVAL website
III- Contract Changement
Into each national REVIVAL website, the
possibility to download brochures as pdf files
Write into articles the local REVIVAL website
and the official REVIVAL website
IV- Dissemination