ABS project September 98 - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

ABS project September 98

Description:

Independence versus energy. Database : reference & centralized optics ... East Hall steering. Effort: data description in DB. Program ready. OBJECTIVES 2000 : STUDIES ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 12
Provided by: Lind245
Category:

less

Transcript and Presenter's Notes

Title: ABS project September 98


1
ABS (Past) Present Future
Marine Pace for the ABS team
2
A B S (PAST) PRESENT FUTURE
  • A bit of history
  • Present communication architecture
  • Present status
  • operational corrections
  • strong points w.r.t. to-be-improved /weak
    points
  • Short-term objectives

3
A BIT OF HISTORY
  • ABS 1st generation (1996)
  • Principle
  • 1 program specific to each correction
  • Micado Mathematica based
  • Some limitations
  • lack of flexibility versus changes - Heavy to
    maintain to upgrade
  • dependence on energy (1 energy lt-gt 1 program)
  • ABS 2nd generation (1998 )
  • Aim address above limitations
  • data driven program
  • 1 generic correction module, linkable from any
    measurement program

4
Communication architecture
5
Difficulties encountered along installation
  • Version 1999 problems
  • Lack of Human Resources
  • Unsatisfactory response time
  • Database design longer than foreseen
  • User interface too specialist (confusing)
  • Correction diverged if actual tune theo. tune
  • Version 2000 (in operation)
  • Above problems addressed
  • Being stabilized

6
PRESENT STATUSSTRONG POINTS
  • New corrections definition easy quick
  • Ex TT2 optics for TOF (lt1 hour)
  • Database program easier maintenance
  • Independence versus energy
  • Database reference centralized optics
  • PS Complex, TT2, SPS ring, (TT10)
  • Correction program same look-and-feel

7
PRESENT STATUSWEAK / IMPROVABLE POINTS
  • Design limitations theoretical matrices
  • Limitations inherent to genericity (!)
  • Database edition for specialists
  • PS 26G/c orbit algorithm to be optimised

8
PRESENT STATUS OPERATIONAL CORRECTIONS
  • PSB
  • Injection trajectory
  • Ejection trajectory
  • CPS
  • Closed orbit at low energy
  • Coherent oscillations at injection
  • Fully PPM since 2000
  • Injection bump oscillation (specialist)
  • TT2 steering for all types of beams optics
  • p AD, p TSTAD, p SFT, p LHC, e, Lead ions

9
SHORT-TERM OBJECTIVESNEW CORRECTIONS
  • TT2-TT10 steering
  • Human resources specification ready
  • Slow progress (wait for PS/CO Java environment)
    -gt 2001
  • Coherent oscillations PS (multi-turn pu)
  • Benefit tune-independent correction, ions
    protons
  • Under validation
  • AD closed orbit (?2 G/c)
  • Effort link of L.Bojtar program to ABS
    correction module validation of DB data
  • AD injection line steering
  • East Hall steering
  • Effort data description in DB. Program ready.

10
OBJECTIVES 2000 STUDIES
  • PS Qpolar oscillations correction using Q pu
  • Merging of several corrections into 1 program
  • PSB to PS steering of the 4 rings
  • PS coherent oscillations
  • Performance analysis of operational correction
    schemes
  • Matrices redundancy / lack of correctors w.r.t.
    monitors
  • ABS studies for CLIC
  • Statistics collection from ABS corrections
  • Build measured matrix from ABS outputs. Compare
    with theoretical matrix.
  • gt Andreas talk

11
CONCLUSION
  • Human Resource limited activity
  • All people involved part-time (?50)
  • gt NO immediate answer to request
  • Most of studies performed by A.Jansson
  • (PhD student, leaves end 2000)
  • gt full time HR requested
Write a Comment
User Comments (0)
About PowerShow.com