K. Long, * Introduction. ISS: Comment. Layout. Early warnings. Funding: RG, bid ... P&G focus instrumentation system (tracker, beam-line scintillators, other) ... – PowerPoint PPT presentation

Number of Views:206
Avg rating:3.0/5.0
Slides: 11
Provided by: Long56
Category:
Tags: iss | iss | tracking

less

Transcript and Presenter's Notes

Title: ISS:


1
Introduction
  • ISS
  • Comment
  • Layout
  • Early warnings
  • Funding
  • RG, bid for continuation
  • Issues
  • Reports
  • Six-month progress report
  • Annual report
  • Future meetings

2
International scoping study
  • Launched!
  • Focus of meeting today
  • and UKNF activity over the coming months
  • First plenary meeting at CERN 22 24 Sep 05

3
Possible u/gs to RAL/Harwell site
D.Findlay
4
Possible u/gs to RAL/Harwell site
D.Findlay
5
NF Layout D.Findlay and C.Prior, some i/p from KL
6
Neutrino Factory Target Surface Decay
channel 50m, surface Phase rotation 50m,
surface Cooling 100m, surface FFAG 3-8 GeV 64m
?, surface FFAG 8-20 GeV 160m ?, 15m below
ground FFAG 20-50 GeV 400m ?, 30m below
ground Race-track storage ring Leg to Gran
Sasso 503.5m Leg to Soudan 563.7m Findlay
four-straight storage ring Leg to Gran
Sasso 100m Leg to Soudan 500m Leg to
SuperKamiokande 1000m
9001000 m below ground
To Soudan (500 m)
Return leg
To G Sasso (100 m)
To Super-K (1000 m, projection)
Return leg (vertical)
3 FFAGs 38 GeV820 GeV2050 GeV
To Soudan
3 GeV linac Cooling Phase rot. Target
To G Sasso
Super-beam to Gran Sasso Injector linac 100m,
surface Synchrotrons 50m and 100m
? Surface Extraction line 50m,
surface Target Surface Decay channel 100m Point
s to Gran Sasso
10 GeV synch. booster linac
To G Sasso
7
Early warnings
  • Funding
  • Next RG round January 2006
  • UKNF/MICE posts ring fenced to 31Mar07
  • Bid for continuation
  • UKNF award resource for 2004/05 2006/07
  • So need new bid to provide resource for 2007/08 ?
  • Timetable not yet given but can work backwards
  • Award provides resource from 01Apr07
  • Peer-review process complete Dec06/Jan07
  • Proposal submitted end of summer 2006
  • PPARC call could be earlier
  • Need to prepare revised plan starting Q1 2006

8
Early warnings
  • Six-monthly report due end of September
  • Plan in Str.Grp. meeting this pm but
  • Short status/plans text by WPM
  • Financial summary
  • RAL annual report
  • Due January 2006
  • Initiate, by WPM, November 2005

9
Issues for development of programme
  • Have been/are building broader activity
  • Physics/phenomenology
  • Accelerator
  • Concept
  • Proton driver front end
  • Target
  • Muon front end and cooling (MICE)
  • Design study
  • Detectors
  • Clear need to produce coherent plan
  • Issues
  • Inter-disciplinary
  • Much of RD is interdisciplinary, yet
  • Hard to engage engineering departments
  • No engagement with EPSRC
  • Development of capability
  • Capability manufacturing techniques and,
    eventually, capacity
  • How to engage with industry
  • Management of risk

10
Next UKNF/MICE-UK meetings
  • 06Sep05 PG with MICE-UK meeting at RAL
  • PG focus hydrogen system RD
  • 05Oct05 PG Imperial
  • PG focus instrumentation system (tracker,
    beam-line scintillators, other)
  • 02Nov05 PG with MICE-UK meeting at RAL
  • PG focus MICE software
  • 07Dec05 PG Oxford
  • PG Focus AFC in Oxford
  • (Tue) 10Jan06 PG with MICE-UK meeting at RAL
  • PG Focus Hall infrastructure
  • (Wed) 11Jan05 UKNF meeting at RAL
  • (Wed) 01Feb06 PG Glasgow
  • PG Focus Beam-line preparations
  • (Wed) 01Mar06 PG with MICE-UK meeting at RAL
  • PG Focus Planning for exploitation phase
    Phase II bids
  • (Wed) 05Apr06 PG Liverpool
  • PG Focus Instrumentation
  • (Wed) 02May06 PG with MICE-UK meeting at RAL

Agreed
Proposed