Title: ISS:
1Introduction
- ISS
- Comment
- Layout
- Early warnings
- Funding
- RG, bid for continuation
- Issues
- Reports
- Six-month progress report
- Annual report
- Future meetings
2International scoping study
- Launched!
- Focus of meeting today
- and UKNF activity over the coming months
- First plenary meeting at CERN 22 24 Sep 05
3Possible u/gs to RAL/Harwell site
D.Findlay
4Possible u/gs to RAL/Harwell site
D.Findlay
5NF Layout D.Findlay and C.Prior, some i/p from KL
6Neutrino Factory Target Surface Decay
channel 50m, surface Phase rotation 50m,
surface Cooling 100m, surface FFAG 3-8 GeV 64m
?, surface FFAG 8-20 GeV 160m ?, 15m below
ground FFAG 20-50 GeV 400m ?, 30m below
ground Race-track storage ring Leg to Gran
Sasso 503.5m Leg to Soudan 563.7m Findlay
four-straight storage ring Leg to Gran
Sasso 100m Leg to Soudan 500m Leg to
SuperKamiokande 1000m
9001000 m below ground
To Soudan (500 m)
Return leg
To G Sasso (100 m)
To Super-K (1000 m, projection)
Return leg (vertical)
3 FFAGs 38 GeV820 GeV2050 GeV
To Soudan
3 GeV linac Cooling Phase rot. Target
To G Sasso
Super-beam to Gran Sasso Injector linac 100m,
surface Synchrotrons 50m and 100m
? Surface Extraction line 50m,
surface Target Surface Decay channel 100m Point
s to Gran Sasso
10 GeV synch. booster linac
To G Sasso
7Early warnings
- Funding
- Next RG round January 2006
- UKNF/MICE posts ring fenced to 31Mar07
- Bid for continuation
- UKNF award resource for 2004/05 2006/07
- So need new bid to provide resource for 2007/08 ?
- Timetable not yet given but can work backwards
- Award provides resource from 01Apr07
- Peer-review process complete Dec06/Jan07
- Proposal submitted end of summer 2006
- PPARC call could be earlier
- Need to prepare revised plan starting Q1 2006
8Early warnings
- Six-monthly report due end of September
- Plan in Str.Grp. meeting this pm but
- Short status/plans text by WPM
- Financial summary
- RAL annual report
- Due January 2006
- Initiate, by WPM, November 2005
9Issues for development of programme
- Have been/are building broader activity
- Physics/phenomenology
- Accelerator
- Concept
- Proton driver front end
- Target
- Muon front end and cooling (MICE)
- Design study
- Detectors
- Clear need to produce coherent plan
- Issues
- Inter-disciplinary
- Much of RD is interdisciplinary, yet
- Hard to engage engineering departments
- No engagement with EPSRC
- Development of capability
- Capability manufacturing techniques and,
eventually, capacity - How to engage with industry
- Management of risk
10Next UKNF/MICE-UK meetings
- 06Sep05 PG with MICE-UK meeting at RAL
- PG focus hydrogen system RD
- 05Oct05 PG Imperial
- PG focus instrumentation system (tracker,
beam-line scintillators, other) - 02Nov05 PG with MICE-UK meeting at RAL
- PG focus MICE software
- 07Dec05 PG Oxford
- PG Focus AFC in Oxford
- (Tue) 10Jan06 PG with MICE-UK meeting at RAL
- PG Focus Hall infrastructure
- (Wed) 11Jan05 UKNF meeting at RAL
- (Wed) 01Feb06 PG Glasgow
- PG Focus Beam-line preparations
- (Wed) 01Mar06 PG with MICE-UK meeting at RAL
- PG Focus Planning for exploitation phase
Phase II bids - (Wed) 05Apr06 PG Liverpool
- PG Focus Instrumentation
- (Wed) 02May06 PG with MICE-UK meeting at RAL
Agreed
Proposed