GECOS%20Global%20Engineering%20Coordination%20Support - PowerPoint PPT Presentation

About This Presentation
Title:

GECOS%20Global%20Engineering%20Coordination%20Support

Description:

Kari Alho. Jussi Kanerva. Reijo Sulonen. Helsinki University of ... Kari Alho; Project manager. Pekka Isto, Arno Karatmaa, Yanbo Han, N.N.; Researchers ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 17
Provided by: karialhoju
Category:

less

Transcript and Presenter's Notes

Title: GECOS%20Global%20Engineering%20Coordination%20Support


1
GECOS Global Engineering Coordination Support
  • Kari Alho
  • Jussi Kanerva
  • Reijo SulonenHelsinki University of Technology
  • TAI Research Centre
  • Software Engineering Group
  • http//wwwseg.cs.hut.fi/gecos/

2
Contents
  • Project background
  • Benefits for companies
  • Research challenge
  • Global engineering project characteristics
  • Requirements for a solution
  • Research proposal project structure

5.3.1998
3
Project background
  • Originally proposed by two companies
  • Industry need for efficient integrated product
    design in a distributed environment
  • TAI Research Centres experience in problem
    areas
  • Distributed workflow, BPR, CAD, Rapid
    Prototyping, PDM, Internet,
  • Industry and research collaboration

5.3.1998
4
Benefits for companies
  • Faster engineering cycle through
  • Availability of physically separated resources
  • Best possible project staff and competence
  • Improved concurrency
  • Reduced training by utilizing experts everywhere
  • Additional savings possible in
  • Reduced management overheads and travelling
  • Reduced investments in systems infrastructure

5.3.1998
5
GECOS application environment
Number of partners
Expert network
Megaproject
Size of project
Project
Enterprise project
5.3.1998
6
Research challenge
  • Flexible, distributed project management system
  • Agent technologies, network communication and
    web-type software tools
  • Virtual designs and simulations in network
  • Co-location
  • Integration of existing solutions

5.3.1998
7
Global engineering project characteristics
  • Several independent partners and concurrent
    activities
  • Virtual engineering over netwroks
  • Design information exchange through data
    communications
  • May be separated by distance, time, culture
  • May be short-lived
  • Little guarantees of common infrastructure

5.3.1998
8
Requirements for a solution
  • Easy project set-up and management
  • Short lead time
  • Affordable, common technological infrastructure
  • WEB-based
  • Engineering business processes
  • Definition support
  • Human issues
  • Teamwork
  • Effective management
  • Reward mechanisms

5.3.1998
9
Technological infrastructure
  • Basic networking
  • Security services
  • Directory services
  • Design tools with data interchange common
    formats
  • Standards
  • Internet-based
  • Project management and reporting
  • Product data management
  • Collaboration software
  • Email
  • Conferencing

How to choose right components and integrate them?
5.3.1998
10
Research proposal structure
Electrolux-RD project
IBM
GECOS RESEARCH PROJECT
Elomatic Oy project
HP
Yritysverkot Oy project
COMPANY PROJECT
PILOTPROJECT
Company project N
Core group collaboration
Support group
5.3.1998
11
GECOS research project
  • Develop generic methods and tools to support
    global engineering projects
  • Duration 2 years, 3/98 - 12/99
  • 4-5 researchers
  • Coordinated by TAI Research Centre
  • Funded by TEKES and industry
  • Pilot projects support the company projects

5.3.1998
12
Work packages
  • Distributed project management
  • Product modeling and visualization
  • Global engineering processes
  • Product data management in virtual enterprises
  • Communication and collaboration methods

5.3.1998
13
Company projects
  • Electrolux Rapid Development
  • Elomatic Oy
  • Yritysverkot Oy
  • Technology providers IBM, HP
  • GECOS research project
  • Funded by TEKES and the pilot companies
  • Company-specific work for application of the
    results of the research project
  • Up to 3 person-months of effort reserved for each
    pilot company

5.3.1998
14
GECOS project resources
  • Steering group
  • Representatives of pilot companies, TEKES, TAI
  • Technology providers
  • HP, IBM
  • TAI personnel
  • Professor Reijo Sulonen Leader
  • M.Sc. Kari Alho Project manager
  • Pekka Isto, Arno Karatmaa, Yanbo Han, N.N.
    Researchers

5.3.1998
15
Cost estimate and funding
5.3.1998
16
How to join - more information
  • TAI Research Centre
  • GECOS Project Manager
  • Kari Alho
  • Tel (09) 451 3390
  • E-mail Kari.Alho_at_hut.fi
  • MET
  • RAPID Coordinator
  • Pekka Malinen
  • Tel (09) 1923 315
  • E-mail
  • Pekka.Malinen_at_met.fi

5.3.1998
Write a Comment
User Comments (0)
About PowerShow.com