Time Series. Techniques and an Example from Roger Simon's The City Building Process ... What is a Time Series? Numerical data ordered by intervals of time in ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 18
Provided by: margoan9
Category:
Tags: series | time

less

Transcript and Presenter's Notes

Title: Time Series


1
Time Series
  • Techniques and an Example from Roger Simons The
    City Building Process

2
What is a Time Series?
  • Numerical data ordered by intervals of time in
    chronological order
  • The analysis of a time series involves
    decomposing the series into its components, e.g.,
  • Trends
  • Cyclical and Seasonal Fluctuations
  • Irregular Fluctuations

3
Example of a Time Series
1888 2
1889 29
1890 33
1891 40
1892 56
1893 43
1894 39
1895 21
1896 38
Etc 31
4
To Analyze a Time Series
  • Identify the possible processes affecting the
    series
  • Inflation or Deflation (for series of prices or
    expenditures)
  • Long term trend
  • Cyclical fluctuations
  • Seasonal fluctuations
  • Irregular fluctuations

5
Steps to Analyze Changing Construction Costs
  • Identify a measure
  • Construction Cost? Or.
  • Construction Cost Per Square Foot
  • Convert to Constant Dollars
  • Measure the Trend
  • Identify cyclical or seasonal factors
  • Identify irregular fluctuations

6
Raw Construction Cost over Time
7
Properties Built over Time
8
Size of Buildings Built over Time
9
Adjusting for Inflation
  • if yrbuilt gt887 and yrbuilt lt 912 then let
    concost2concost20
  • if yrbuilt gt911 and yrbuilt lt 916 then let
    concost2concost/.06
  • if yrbuilt 916 then let concost2concost/.065
  • if yrbuilt 917 then let concost2concost/.077
  • if yrbuilt 918 then let concost2concost/.090
  • if yrbuilt 919 then let concost2concost/.104
  • if yrbuilt 920 then let concost2concost/.120
  • if yrbuilt 921 then let concost2concost/.107
  • if yrbuilt 922 then let concost2concost/.103
  • if yrbuilt 923 then let concost2concost/.102
  • if yrbuilt 924 then let concost2concost/.102
  • if yrbuilt 925 then let concost2concost/.105
  • if yrbuilt 926 then let concost2concost/.106
  • if yrbuilt 927 then let concost2concost/.104
  • if yrbuilt 928 then let concost2concost/.102
  • if yrbuilt 929 then let concost2concost/.102
  • if yrbuilt. then let concost2 concost 20
  • if concost. Then let concost2 .

10
Construction Cost Adjusted for Inflation
11
Comparing Raw and Inflation Adjusted Construction
Costs
12
Construction Cost per Square Foot (Inflation
Adjusted)
13
Construction Cost per Square Foot (Inflation
Adjusted)
14
The Model Cost per square foot constant(a)
b1year b2(last years cost per square foot)
15
The Model Cost per square foot constant(a)
b1year b2last years cost per square foot
  • Cost per square foot 7.33 .59 (last years
    cost) .29 (year)
  • Number of cases 39 (1889-1928). 18891
  • Adjusted R Square 77.2

16
Trend and Residuals
17
The Data1.Year 2. Cost Per Square
Foot3. Last Years Cost Per Square Foot4.
Predicted Cost5. Residual