EMERGING ECOMMUNICATION TECHNOLOGIES AND THEIR USAGE IN PROJECTBASED ORGANIZATIONS - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

EMERGING ECOMMUNICATION TECHNOLOGIES AND THEIR USAGE IN PROJECTBASED ORGANIZATIONS

Description:

From e-mail to EDM (Electronic Document Management) and project planning systems ... Document management. Internal mostly, 19%. 100%. Customer relationship man. ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 9
Provided by: Eng57
Category:

less

Transcript and Presenter's Notes

Title: EMERGING ECOMMUNICATION TECHNOLOGIES AND THEIR USAGE IN PROJECTBASED ORGANIZATIONS


1
EMERGING E-COMMUNICATION TECHNOLOGIES AND THEIR
USAGE IN PROJECT-BASED ORGANIZATIONS
  • Mats Engsbo Maqsood Sandhu
  • Department of Management and Organization
  • Swedish School of Economics (HANKEN)
  • Vaasa, Finland

2
Background of paper
  • Project-based organizations (PBO) and traditional
    organizations (TO)
  • The use of key electronic communications for the
    development of business activities
  • Point of departure
  • Due to the differences in organizational forms
    (PBO TO), the communications needs differ, and,
    thus, the use of e-communication tools differ

3
Research focus
  • Literature basis/review
  • Project management literature
  • Electronic communication
  • Adoption of ICT
  • Research question
  • How are project-based organizations using
    e-communication in the form of available
    technologies, and how does this usage differ from
    traditional organizations?

4
Paper structure - overview
Traditional (Business) Organizations Production
Management ? Coordination and control all
activities in order to make a product
Project-based Organizations Project Management
? Planning and coordination of project from
inception to completion i) Uniqueness ii)
Complexity iii) Discontinuity
  • Project-based Organizations
  • Temporary Arrangement
  • Emphasis on goals
  • Dynamic
  • Flexible
  • Non-hierarchic organization
  • Decentralized decision making
  • Adhocratic
  • Traditional Organizations
  • Continuous Operations
  • Emphasis on working processes
  • Stable
  • Inflexible
  • Hierarchic organization
  • Centralized decision making
  • Bureaucratic
  • Knowledge storage and retrieval
  • The nature of projects problematic
  • Traditional Organizations
  • Intra-organizational collaboration and
    coordination
  • Project-based Organizations
  • Intra-organizational as well as
    interorganizational collaboration

From e-mail to EDM (Electronic Document
Management) and project planning
systems Communication asynchronous vs
synchronous, functional vs. collaborative
Generic, time-, firm-specific Adoption
barriers Individual, firm or network
Adoption vs use decision vs
post-implementation
5
Data collection
  • Data collected from two surveys
  • 1. industrialized construction total population
    survey among providers of prefabricated small
    houses (SWE/FINMNC-SME)
  • 2. project-based organizations focus group
    survey (FINMNC-SME)
  • Questions on e-communication ? presence and use
    of tools/system
  • design/planning (3D modeling), internal
    communication networks/tools, EDM systems,
    e-procurement and communication platforms
  • Number of firms in each survey
  • Traditional organizations 21 Finnish firms (55)
    16 Swedish firms (41) (CEO/CIO) ? customers
    individual or developers
  • Project-based organizations nine organizations
    (18) (GM or Project Manager) ? customers large
    firms

6
Findings
  • Project-based Org. General
  • project teams belong to larger organizations ?
    access to more tools
  • Traditional Organization Intranet
  • according to firm size ? larger firms implement
    more frequently
  • Extension to Extranets 24
  • Project-based Org. Intranet
  • larger organizations?
  • Traditional Organization 3D Visual
  • 3D visualization ? more common in Finland than
    Sweden Vertex
  • Project-based Org. Design
  • 3D strong, two smallest firm not using
  • Traditional Organization Scheduling
  • simple or home-made software.
  • Traditional Organization E-procurem.
  • advanced use low
  • 48 fax/phone, 38 e-mail, EDI in three firms but
    with 30 of total proc.
  • Project-based Org. Document Man.
  • essential to the project work process
  • across boundaries
  • Traditional Organization CRM
  • Further 26 of firms in process of implementing
    software/databases
  • Project-based Org. CRM
  • register complaints and analyze performance

7
Discussions
  • The difference in communication between TO and
    PBO
  • PBO more emphasis on interorganizational
    communication
  • Inter-organizational communication requirements
    (multiple stakeholders, different systems,
    security issues etc.)
  • Differences in time-frame, complexity and
    knowledge reapplicability
  • IT complexity of project teams as they have
    access to the whole organizations IT, more
    change-oriented
  • SME vs. MNCs distances inside the organizations
  • LIMITATIONS OF RESEARCH
  • Small sample barriers not developed two surveys
    with similar questions

8
Thank you!
  • Question and comments?