Support Solutions Envelope - PowerPoint PPT Presentation

1 / 55
About This Presentation
Title:

Support Solutions Envelope

Description:

KSA 3 Supply Chain Management. Owner ... Owner Hd Log NEC Programme. Owner's representative Log NEC Progs-SO1 Reqts and Process. ... SI-11 Supply Chain ... – PowerPoint PPT presentation

Number of Views:256
Avg rating:3.0/5.0
Slides: 56
Provided by: chr9151
Category:

less

Transcript and Presenter's Notes

Title: Support Solutions Envelope


1
  • Support Solutions Envelope
  • and the
  • SSE Compliance Process
  • Tailored, evidence based, risk focused

2
Presentation Objectives
  • To enable a user to
  • Understand that an assessment of SSE Compliance
    is a CDM requirement, and how this will support D
    JSC Assurance
  • Understand the Support Solutions Envelope (SSE)
  • Understand the SSE Compliance Process (how to use
    the SSE)
  • Understand that the SSE Compliance Process will
    assist with Support Solution Development
  • Identify the Through Life Support (TLS) Support
    Improvement Team (SIT)

3
SSE Team Organisation
SSE Manager (KSA 2 4) Mr Dennis Martin ABW 32428
SSE Manager (KSA 1 3) Lt Cdr Heather Fraser ABW
32545
Website Compliance Tool (Mr Dennis Martin)
4
Importance of SSE
  • SSE ensures that support proposals
  • Are effective in meeting user requirement
  • Are coherent with other support solutions across
    Defence
  • Provide value for money
  • Do not create unacceptable operational risk.
  • Assessment of SSE Compliance is required by
  • DES Standing Instructions (SI) 9, 10, 11 and 21
  • SI provide PT Leaders with policy and instruction
    on the appropriate discharge of their delegations
    and responsibilities from Chief of Defence
    Materiel (CDM).
  • Acquisition Operating Framework (AOF)
  • The Operational layer of the AOF confirms that
    the use of the SSE by PT is required by CDM.
  • Smart Approvals Guidance Version 10.0

5
  • Understanding the SSE

6
SSE Purpose
  • The SSE identifies the support policies that are
    deemed so critical to Defence that a Project Team
    (PT) must consider them when developing a support
    solution for an equipment or capability
  • The SSE is a business tool
  • Which project teams use to record evidence of
    compliance with applicable support policies.
  • That provides the primary mechanism by which the
    Through Life Support, Support Improvement Team
    (TLS SIT) delivers its advice and guidance
    outputs.
  • That will assist DES governance of projects in
    identifying risk to the delivery of the support
    solution via the assurance process particularly
    at Initial Gate (IG) and Main Gate (MG), and will
    assist customer acceptance of In-Service
    capability.

7
Snapshot of SSE in the AOF
8
Functions of SSE
  • Signposts critical support policy
  • Allows a PT to provide assessment of compliance
    against only the tailored GPs
  • Identifies support SME / POC
  • Provides a framework for a PT to develop
    support proposals / solutions
  • Provides a process to gain progressive
    confidence in support solutions as they develop,
    and are ultimately delivered
  • Supports DES Governance of Project approvals
    and Business Case submissions
  • Is applicable to all equipment and Information
    System (IS) (Service Management) projects

9
SSE Content
  • Governing Policies (GP)
  • Set of GP for each of the 4 Key Support Areas.
  • Compliance Tools
  • Separate tools for each of the 4 stages of the
    Acquisition process.
  • One for Urgent Operational Requirement use.

10
Anatomy of a Governing Policy
  • Scope
  • The requirement for the policy, including the
    benefits it brings to the MOD and PT
  • Applicability
  • A single paragraph outlining to which types of
    project the GP will apply
  • Underpinning Policy
  • The title of the documents that underpin the
    compliance tests within the GP
  • Compliance Tool - Evidence Requirements
  • Evidence requirements (that must stem directly
    from the underlying policy document) are
    contained within the SSE Compliance Tool and must
    be measurable, consistent objective
  • Supporting Information
  • Hyperlinks to relevant references and supporting
    information that will assist projects in
    achieving compliance
  • Sponsoring Authority
  • Title and contact details of the sponsor of the
    GP
  • Subject Matter Experts (SME)
  • A list of those nominated personnel who are
    qualified, responsible and resourced for
    providing authoritative advice and guidance for
    Ensurance and Assurance activity to the PT, KSA
    Owners and SIT.

11
Ensurance / Assurance GPs
  • GPs are categorised as either Assurance or
    Ensurance
  • ASSURANCE
  • The independent analysis of the Evidence
    Requirement Matrix to either confirm that the
    support solution is compliant with extant policy,
    or quantify the risk of non-compliance in terms
    of the impact on operational effectiveness and /
    or whole life cost.
  • ENSURANCE
  • The Project Leader or his delegated officer
    confirm that the support solution is compliant
    with applicable extant SSE GPs.

12
Key Support Areas
  • GPs are grouped into 4 Key Support Areas (KSA)
  • KSA 1 Logistic Support and Sustainability
  • Owner Head Through Life Support
  • Owners representative Log Ops-PolPol Support
    SO1.
  • KSA 2 Supportability Engineering
  • Owner Head Through Life Support
  • Owners representative DES JSC TLS-Pol-PC.
  • KSA 3 Supply Chain Management
  • Owner Head Supply Chain Management
  • Owners representative DES SCM-PolComp-PolDevSO1
  • KSA 4 Logistic Information
  • Owner Hd Log NEC Programme
  • Owners representative Log NEC Progs-SO1 Reqts
    and Process .

13
KSA 1 Logistics Support Sustainability
  • GP 1.1 Logistics Support and Sustainability
    Requirements
  • GP 1.2 Contractors on Deployed Operations (CONDO)
  • GP 1.3 Support Continuity

14
KSA 2 Supportability Engineering
  • GP 2.1 ILS Process and Support Solution
    Development
  • GP 2.2 Reliability Encompassing ARM and RCM
  • GP 2.3 Obsolescence Management
  • GP 2.4 Automatic Test Systems and Test and
    Measurement Equipment
  • GP 2.5 Configuration Management of Defence
    Material
  • GP 2.6 Technical Information and Data
  • GP 2.7 Disposal
  • GP 2.8 Training and Training Equipment
  • GP 2.9 Manpower and Human Factors Integration

15
KSA 3 Supply Chain Management
  • GP 3.1 Supply Chain Management
  • GP 3.2 Codification and Item Ownership
  • GP 3.3 Inventory Planning
  • GP 3.4 Packaging and Labelling
  • GP 3.5 Material and Financial Accounting
  • GP 3.6 Fuels, Lubricants and Industrial Gases
  • GP 3.7 Equipment Air Portability

16
KSA 4 Logistic Information
  • GP 4.1 Logistics Information Requirements
    Planning
  • GP 4.2 Information Systems and Services
    Requirements Planning

17
  • SSE VIEWS

18
Compliance Tool Summary Page
19
Compliance Tool Example
20
SSE Summary
KSA 1
3 GPs
KSA 2
9 GPs
KSA 3
7 GPs
KSA 4
2 GPs
21
  • SSE Compliance Process

22
SSE COMPLIANCE PROCESS
NOTE EACH BOX IS HYPERLINKED TO OTHER SLIDES
REVEALING MORE DETAIL
Click on Boxes for more detail
Requirement for SSE Compliance identified
Assurance is a through life activity
PT present Assurance Statement to DESIB
START
Assurance Plan Update
Assurance Plan Agreed
SSO Assigned
Support Solution Statement
Initial briefing
SSE Tailoring
Support Assurance Review (SAR)
Compliance Assessment
SSO Review
Update SSE Compliance Tool
Baseline SSE Compliance Tool
Final SSE Compliance Tool
Support Solution Report
Establish the Compliance Requirement
Policy
Project Team (PT) Develops Support Solution
(producing agreed SSE evidence)
Assurance
SME Advice Guidance
Assurance Plan
23
  • Support to Assurance Activities.

24
Support Solution Report Process
Assurance Plan
PT Deliverable
Pre-MG
DESIB 6/8 Months
SAR
MG
MG Ver 1.0
  • - SSE Tailored
  • Baseline Evidence requirements agreed
  • SAR Target date set

25
Support Solutions Report
SUPPORT SOLUTION STATEMENT REFERENCE COMPLIANCE
TOOL EXECUTIVE SUMMARY RISKS AND MITIGATION
REQUIRED
SUPPORT SOLUTION REPORT TASK RISKS AND
MITIGATION REQUIRED SUPPORT SOLUTION
DEVELOPMENT INTERDEPENDENCIES OPPORTUNITIES CO
NCLUSION
Risk and Mitigation
26
SAR Outputs
  • Support Solution Statement
  • Risks identified and agreed between IPT
    Functional Assuror
  • Mitigation agreed and work required for next
    phase
  • Assurance Plan updated
  • Aim to assist IPT gain Functional Assurors sign
    off

27
  • Support Improvement Team
  • (SIT).

28
Support Improvement Team Organisation
29
Support Improvement Team
  • The primary purpose of the Support Improvement
    Team (SIT) is to provide authoritative, timely,
    high-quality and appropriate policy, advice and
    guidance to Operating Centres on the development
    and improvement of their coherent and effective
    support solutions.
  • The SIT is part of Joint Support Chain (JSC),
    Through Life Support (TLS) and consists of
  • Operating Centre facing teams that provide advise
    and guidance,
  • An OF4 lead Support Process Development (SPD)
    team that will provide a focal point for SIT ways
    of working and process development including the
    SSE.
  • SIT Leads (OF4 / B2s) head Operating Centre
    facing sub-teams and provide a point of contact
    and focus for Operating Centres on support
    solution issues.
  • The sub-teams are staffed by Support Solutions
    Officers (SSO) who are allocated to specific
    projects as their principal TLS focus and provide
    a single point of contact (POC) for through-life
    support advice and guidance throughout the
    Acquisition Lifecycle.

30
  • SSE Relationships

31
How Does SSE Relate to ILS?
  • The SSE provides PT with framework showing all
    the critical elements of a support solution that
    an PT should consider when drafting its ILS Plan
  • GP2.1 captures the need for a PT to effectively
    manage the development of support solutions
    through a tailored ILS programme
  • The SSE contains the contact details for ILS
    Subject Matter Experts
  • The SIT provide advice and guidance to PT on the
    tailored application of ILS
  • For CIS projects this will include the
    application of ILS in a Service Management
    environment (support ITIL approach)
  • The SIT will help to co-ordinate SSE Compliance
    activities.

32
  • QUESTIONS?
  • Contact the SSE Team

33
Assurance
Note SSE Compliance supports Assurance activity
MGBC
IGBC
LSD / ISD
In-Service
Acceptance Into Service
In Service Review
Assurance Plan
Assurance Plan Update
Business Case
Business Case
Assurance Plan Update
Assurance Plan Update
JSC Assurance
JSC Assurance
JSC Assurance
JSC Assurance
Assurance
Support Solution Statement
Support Solution Statement
Support Solution Statement
Support Solution Statement
Project Team Update SSE Compliance Matrix
SSE Compliance
SSE Compliance
Project Team Develop, deliver, manage the
Support Solution
Return
SIT and SMEs Engage with PT to deliver advice
and guidance
34
Policy
  • DES Standing Instructions (SIs)
  • SIs provide project team leaders with policy and
    instruction on the appropriate discharge of their
    delegations and responsibilities from Chief of
    Defence Materiel (CDM).
  • Policy on project team leader responsibilities
    applies to all Basic Level Budget Holders (BLBH)
    unless they hold a specific exemption in their
    personal Letter of Delegation from CDM.
  • SIs act to clarify Letters of Delegation and the
    AOF.
  • SI-10 Support Solutions Management
  • Mandates the project team to assess compliance of
    Support Solutions through life with policies
    articulated through the SSE framework.
  • SI-11 Supply Chain
  • Mandates the use of SSE compliance to assess
    Support Solutions against KSA3 Policies.
  • SI-9 Logistic Information Management
  • Mandates the use of SSE compliance to assess
    Support Solutions against KSA4 Policies.
  • SI-21 Through Life Investment Assurance Framework
  • Clarifies the role of Assurance in Support of
    DES Investment proposals
  • SE Assurance Policy mandates tailored SSE
    Compliance as an activity that will support SE
    Assurance for all programmes, and as such must be
    captured in project team Assurance Plans.
  • Acquisition Operating Framework (AOF)
  • The Operational layer of the AOF confirms that
    the use of the SSE by project teams is mandated
    by CDM.
  • AOF location AOF/AOF Operational
    Layer/Logistics/Key Policies and Processes.

Return
35
Through Life Investment Assurance Plan
Project Assurance
Fin
Com
SE
ISS
JSC Assurance
HR
Support Solution Statement
SSE compliance tool
SSE Compliance
KSA1
KSA2
KSA3
KSA4
Return
Support Solution Statement (based on SSE
Compliance Assessment, using SSE Compliance tool)
is a mandated component of the JSC element of
Project Assurance Plans, and subsequent JSC
Assurance Statement.
36
Requirement for SSE Compliance identified
  • DES Standing Instruction 10 (SI-10) mandates that
    project teams must undertake SSE Compliance
    assessment through Life.
  • SSE Compliance assessment is a through life
    process, providing most benefit to project teams
    when applied early with the involvement of SMEs
    who can assist development of a projects support
    solution.
  • The Support Improvement Team (SIT) act as a focal
    point for projects assisting them through the
    process
  • Initial Point of Contact for projects.
  • Facilitating the involvement of SMEs.
  • Conducting Support Assurance Reviews (SARs) to
    assist projects.
  • Supporting the provision of JSC Assurance.
  • Throughout, the aim will be to assure that the
    resultant support solution is effective (meets
    user requirements), and is coherent with MoD
    corporate policy (other support solutions).
  • The projects Through Life Investment Assurance
    Plan (TLIAP) must be used to identify that SSE
    Compliance will underpin JSC Assurance.
  • The nominated SIT Support Solutions Officer (SSO)
    acts as JSC Point of contact for this activity.

Return
37
SSO Assigned
  • SSE Compliance relies on project contact with a
    wide range of SMEs.
  • The Support Improvement Team (SIT) act the
    projects primary point of contact to facilitate
    SME contact.
  • Projects should initiate contact with SIT through
    their SIT Operating Centre Lead (OC Ld).
  • Alternatively a projects existing relationships
    with SIT staff may be used.
  • SSE Compliance must be identified in the
    projects Assurance Plan as the single component
    of JSC Assurance.
  • For new projects, SIT will agree priority and
    ownership by a nominated Support Solutions
    Officer (SSO) based on the demand plan, business
    need, and available resources to act as the
    projects main contact.
  • The SSO will identify themself to the Project
    team.

Return
38
Initial briefing
  • A standardised letter to introduce SSE Compliance
    can be issued by the SSO prior to an initial
    meeting.
  • Particularly for project teams new to SSE
    compliance, the SSO will conduct an initial
    briefing to introduce the project teams to the
    process.
  • The briefing should be aimed at the specific
    needs of the project team, and can cover the
    following types of concern
  • A general overview of SSE Compliance.
  • Benefits of SSE compliance.
  • Who is involved.
  • Tailoring overview.
  • How to engage with SMEs.
  • The link between SSE compliance and Assurance.
  • Project teams familiar with SSE compliance may
    not require a detailed briefing, however it is
    important that all parties understand the
    process.

Return
39
Establish the Compliance Requirement
  • A benefits review is undertaken to agree GP
    tailoring, agree the evidence requirement, and
    set some priorities.
  • The project team should assemble relevant support
    documentation that will provide an overview of
    the current support picture.
  • A meeting will usually be held where the SSO and
    project team will discuss the SSE compliance
    requirement
  • The Projects current SSE compliance assessment
    may be reviewed.
  • The SSO will advise on the resourcing of the
    Projects ILS activities, and where necessary
    will assist the project team to obtain suitably
    qualified resources
  • Internal MoD Licensed ILS Staff.
  • External assistance through the FATS Contract.
  • The SSO will provide initial guidance on which GP
    are not applicable and therefore can be tailored
    out (SSO Tailoring).
  • The SSO will engage with Policy leads to confirm
    relevant GPs, and then provide the project team
    with guidance on priorities for engaging with
    SMEs.
  • The project team will engage with SMEs to confirm
    the GP evidence requirement and the SME role in
    supporting the Projects development of their
    support solution.

Return
40
SSE Tailoring
  • The SSO will facilitate the SSE Tailoring process
    through the following steps (click on each box
    for further detail)
  • The objective of SSE Tailoring is to reach formal
    agreement between the project team and SSO on
    relevant GPs.
  • The SSOs view of relevant GPs and priorities
    will be communicated to project teams through a
    Compliance Requirement Letter issued by the SSO.

SSO Tailoring
KSA Owner Tailoring
Return
41
SSO Tailoring
  • SSO and project team use the SSE Tailoring Tool
    to identify which GPs may be tailored out.
  • SSO in conjunction with project team populates
    the Compliance Tool with conclusions from SSO
    tailoring
  • Tailored out GPs identified (Compliance Tool
    colour coding adjusted accordingly to white) and
    comments added to show why GPs have been tailored
    out.
  • At this stage there is no requirement to comment
    on the remaining (relevant) GPs within the
    Compliance Tool.

Return
42
KSA Owner Tailoring
  • SSO engages with KSA owners to confirm relevant
    GPs.
  • SSO sends a copy of the Compliance Tool to KSA
    owners asking for concurrence (or otherwise) of
    decisions made at the SSO Tailoring stage.
  • KSA owners will confirm which GPs are not
    required, updating the Compliance Tool with
    applicable comments and return it to the SSO.
  • KSA owners are required to ensure that up to date
    SME points of contact for GPs are maintained
    through the SSE Framework.
  • For KSA 1 and 4 (where there is often a single
    SME for each GP) the SSE Framework will identify
    relevant GP Points of contact.
  • For KSA 2 and KSA 3 (where there are often a
    large number of SMEs for each GP) relevant SME
    contact details will be confirmed by the KSA
    Owner, and SMEs will be informed that the project
    team will soon seek to engage with them.

Return
43
Baseline - SSE Compliance Tool
  • The Evidence requirement for the relevant GPs
    will be agreed.
  • SSO sends updated Compliance Tool to the project
    team along with a Compliance Requirement Letter
    to articulate priorities and guidance on how to
    engage with SMEs.
  • Project team engages with SMEs to agree evidence
    requirement for GPs that have been tailored in.
  • The project team should baseline the SSE
    compliance tool and confirm that that SMEs are
    content.
  • Project team updates Compliance Tool to show what
    evidence the ILS programme will produce for
    agreed GPs.
  • Project team issues baseline Compliance Tool to
    all SMEs.
  • Where SSE compliance is to underpin Investment
    Assurance, the Project must ensure that the
    baseline version number of the SSE compliance
    tool is identified within their Assurance Plan.

Return
44
Assurance Plan Agreed
  • Where SSE compliance has been identified as an
    Assurance activity, the project teams lead for
    support (usually ILSM) must ensure that
  • Project Investment Assurance Plan reflects that
    SSE compliance will underpin JSC Assurance.
  • Project Assurance Plan reflects that criteria for
    SSE compliance has been agreed through a
    Baselined SSE Compliance tool.

Return
45
Project Develops Support Solution
  • Project team develops support solution with
    assistance from SMEs.
  • Project team will benefit from regular contact
    with the nominated SSO who can assist support
    solution development through the use of Support
    Assurance Reviews
  • Use of the SSE compliance tool is encouraged as
    it will assist project teams in reviewing
    progress and prioritising work.
  • Effective support solution development activity
    will start to produce the agreed SSE evidence
    requirement.
  • When the evidence matures and is complete it
    should be reviewed.
  • Assurance GPs Review of evidence and endorsement
    of compliance by identified SME
  • Ensurance GPs Review of evidence and self
    endorsement of compliance by the project team
    subject lead (with advice from SME where
    applicable).

Return
46
SME Advice Guidance
  • SMEs will assist the project team to develop the
    support solution, providing advice and guidance
    to assist with support development activity.
  • Whilst project teams are encouraged to liaise
    directly with SMEs for specialist advice, the SSO
    will act as the primary point of contact for
    general issues.

Return
47
SSO Review
  • As work progresses the project team should engage
    regularly with their nominated SSO who will
    provide advice and guidance to maintain the SSE
    Compliance programme.
  • Ongoing engagement with the SSO may identify the
    need for a Support Assurance Review to examine
    the support solution .
  • e.g. Where stakeholders external to the SSE
    compliance process need to be briefed on
    compliance risks (OC Directors, Team Leaders,
    Programme Support Leads, Assurors etc).

Return
48
Update SSE Compliance Tool
  • As work progresses the project team should engage
    regularly with their nominated SSO updating the
    SSE Compliance tool with
  • Agreed changes to the range of compliance GPs as
    a result of support solution development
  • Additional GP that are now relevant.
  • Removal of GP that are found to be not relevant.
  • Changes to the Evidence requirement.
  • Production of agreed support solution evidence.
  • Endorsement of Assurance GPs by SMEs.
  • Self Endorsement of Ensurance GPs.
  • Ongoing engagement with the SSO may identify the
    need for a Support Assurance Review to examine
    the support solution .
  • e.g. Where stakeholders external to the SSE
    compliance process need to be briefed on
    compliance risks (OC Directors, Team Leaders,
    Programme Support Leads, Assurors etc).

Return
49
Support Solution Report
  • Support Assurance Reviews (SARs) will enable
    project teams to scope SSE compliance risks and
    update planned support solution development
    activity.  
  • Where a formal output from review activity is
    identified, the SSO can produce a Support
    Solution Report to provide the project team with
    an assessment of SSE Compliance activity
  • Support risks and issues.
  • Compliance.
  • Recommendations for further work required
    (Priorities).
  • Opportunities.
  • The Support Solution Report will tend to focus on
    recommendations on how the project team should
    address compliance risks.
  • The Support Solution Report may identify the need
    for an update of the Compliance Tool.

Return
50
Support Assurance Review (SAR)
  • Regular review of the compliance programme should
    be undertaken between the project team and SSO,
    and where necessary this can involve a range of
    Support Stakeholders and SMEs.
  • Formal support evaluation reviews, in the form of
    SARs, can be requested by project teams. Their
    scope will be tailored to the needs of the
    project, however as a minimum it is recommended
    that project teams consider requesting SARs at
    the following times
  • The first before the pre IG Early Engagement
    DESIB and the second before the pre-MG Early
    Engagement DESIB.  These SARs will provide the
    project team with an assessment of confidence in
    the support element of the investment proposal by
    clarifying remaining evidence requirements before
    Business Case submission.
  • The third prior to Logistic Support Date (design
    freeze or the Critical Design Review) will
    provide stakeholders with an assessment of
    confidence that an effective support solution
    will be delivered, and clarify remaining evidence
    requirements that will underpin acceptance into
    service.
  • The last when the capability is in service and it
    is appropriate to review the support solution in
    order to gain operational and efficiency
    improvements.
  • SAR outputs can be produced by the SSO in the
    form of a Support Solution Report

Return
51
Assurance Plan Updated
  • Following on from a Support Assurance Review
    (SAR), the project team lead for support (usually
    ILSM) must ensure that
  • Project Investment Assurance Plan is updated to
    reflect the SAR outputs.
  • Project Investment Assurance Plan is updated to
    reflect that criteria for SSE compliance has been
    reviewed and where it has changed, is recorded
    through a revised version of the SSE Compliance
    tool.

Return
52
Compliance Assessment
  • The SSO will run a compliance assessment, to
    formalise the support picture at the end of the
    project phase.
  • The SSO will produce a Support Solution Statement
    to report on their findings.
  • SSO will use the final version as a basis for
    producing a Support Solution Statement.

Return
53
Finalise SSE Compliance Tool
  • The project team will produce a final version of
    the SSE Compliance tool at the end of each
    Project phase.
  • The tool must indicate
  • SME endorsement of support evidence
  • SME endorsement of Assurance GPs
  • Self endorsement of Ensurance GPs
  • SSO will use the final version as a basis for
    producing a Support Solution Statement.
  • To allow time for staffing, the final version of
    the SSE Compliance tool should be submitted to
    the SSO within agreed timescales.

Return
54
Support Solution Statement
  • The SSO will draft a Support Solution Statement
    (SSS) indicating Full, Limited or Non Assurance,
    the SSS will address risks to the support
    solution derived from SSE compliance.
  • The SSS will draw on key areas of Non-compliance,
    and will be approved and issued to the project
    team by the JSC Assuror.
  • The SSS will also be made available to D JSC (or
    nominated representative) to attend DESIB events.

Return
55
Assurance Statement to DESIB
  • The project team will use the SSS, alongside
    statements from other functional assurance
    pillars, to prepare its DESIB submission
    addressing the risks identified.
  • The risks identified in the SSS must be addressed
    as part of the projects DESIB approval.

Return
Write a Comment
User Comments (0)
About PowerShow.com