EVLA System PDR - PowerPoint PPT Presentation

About This Presentation
Title:

EVLA System PDR

Description:

Commodity PCs/Linux/Windows. Sun/Solaris. Macintosh/Mac OS (low priority) Security ... 7. Requirements Overview (cont.) M&C Displays. A number of displays will ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 11
Provided by: aoc9
Learn more at: http://www.aoc.nrao.edu
Category:
Tags: evla | pdr | reviews | system | windows

less

Transcript and Presenter's Notes

Title: EVLA System PDR


1
EVLA System PDR
  • Operations Requirements

2
Operations Requirements
  • Operations Requirements Document (Initial Draft)
  • http//www.aoc.nrao.edu/evla/techdocs/computer/wor
    kdocs/index.shtml
  • Currently in the review process
  • Purpose of the document
  • Identify the top-level requirements
  • Near-term plan
  • Analyze and incorporate comments, refine and
    broaden scope of document
  • Develop an initial design concept

3
Clients
4
Requirements Overview
  • Target Platforms
  • Commodity PCs/Linux/Windows
  • Sun/Solaris
  • Macintosh/Mac OS (low priority)
  • Security
  • Must be built into the system from the start
  • Users must have and provide a unique ID
  • Each user will have a set of access properties
  • Command and system access blocking

5
Requirements Overview (cont.)
  • Remote Observing
  • In the future operators may be stationed at the
    AOC
  • Either web-based or a downloadable/installable
    client
  • Should use a single code base
  • Scheduling
  • Types Fixed, Dynamic, Goal-oriented,
    scan-level
  • MC and e2e

6
Requirements Overview (cont.)
  • Operator Log
  • Submit log entries
  • Query the logs
  • Generate reports from the log (e.g., Project log)
  • Link a log entry to a maintenance entry
  • User customization

7
Requirements Overview (cont.)
  • MC Displays
  • A number of displays will be required
  • Easily created and integrated into the system
  • Quick look display with plotting ability
  • Warning and Error Messages
  • Should be limited to relevant messages only
  • Attributes severity, origin, cause, action,
    trigger, etc.
  • The attributes should be easily modified and not
  • hard-coded

8
Whats Next?
  • Items requiring near-term resolution
  • Level of remote control of the array
  • Delineation of responsibilities between MC and
    e2e to prevent duplication of effort
  • Near-term design implementation issues
  • Testbed using VLA monitor data stream delivered
    via the CMP
  • Investigate and Select a protocol for monitor
    command data flows between operator stations and
    the real-time core

9
More Features?
  • Other features to consider
  • Display builder
  • Users could create and import their own displays
  • Simulator
  • Aide in software testing and operator training

10
Questions?
Write a Comment
User Comments (0)
About PowerShow.com