Title: EVLA%20Feed%20
1EVLA Receivers PDR
Daniel (Mert) Mertely
2Requirements
- All current bands available before, during, and
after transition. - Receiver performance not degraded.
- Need to test LO, MC, digitization/data
transmission (FO) system early, on prototype. - Compressor capacity problemGet rid of 1020 frig.
- Need space in vertex roomGet rid of A-rack.
3Transition Planning
- 1) Insure inter-operability between old FE new
FH, LOs, MC, IF systems. - 2) Early assembly of wide-band K /or Q band
receivers to test out entire system. - 3) C U bands high priority.
Mert
4T-Plan Inter-operability
- IF converter module part of EVLA sys for lt
X-band. - Minor RX mods will allow attachment to new feeds.
- MC conversion from current bus to FO already
necessary.
Mert
5T-Plan Inter-operability II
- Current L-band (1340 1730 MHz), (with only
modified phase shifter) will bolt-on to new FH
work in EVLA antenna. - Current X-band (8 8.8 GHz) will bolt on to new
feed work in EVLA antenna. - K Q will need new wide-band mixers to handle
both the current C the EVLA X band IFs
(planned). Need new LO chain (mixer, amp) for
high-side injection (planned).
6Early K Q
- EVLA transition 7 K-band receivers include wide
frequency mixersEarly prototypes. - Allows test of LO FO data transmission system
early. - May/may-not include all 4 channels.
Mert
7Early C U
- C U band receivers needed early to avoid A-rack
space complications extra compressor capacity
requirements. - C-band has a VLBA as prototype.
- U-band scaled from current VLA K-band.
- U-band might slip if schedule problems develop
(least harm).
Mert
8FE Feed Delivery SchedulePrototypes
Hayward/Szpindor
9FE Feed Delivery ScheduleProduction
Hayward/Szpindor
10EVLA Receiver Production Schedule
--------------------------------
------------------------------------------------
2002 2003 2004
2005 2006 2007 2008 2009 2010
--------------------------
---------------------------------------------
- Modify Antennas
gt--1-7---gt--8-14--gt-15-21--gt-22-28--gt
Build/Install K
gt-2-gt---7----gt---7----gt---7----gt---7----gt
Build/Install Q
gt-2-gt---7----gt---7----gt---7----gt---7----gt
Build/Install C
gt---7----gt---7----gt---7----gt---7----gt-2-gt
Build/Install U
gt---7----gt---7----gt---7----gt---7----gt-2-gt
Build/Install L
gt-1-gt---3----gt---3----gt---8----
gt----8---gt----7---gt Build/Install X
gt-1-gt---3----gt---3----gt---8----
gt----8---gt----7---gt
Build/Install S
gt---3----gt---3----gt---7----
gt----9---gt----8---gt Build/Install A
gt---3----gt---3----gt---7----
gt----9---gt----8---gt
--------------------------------------------
----------------------------
2002 2003 2004 2005 2006
2007 2008 2009 2010
------------------------------------------
------------------------------ No. of Upgraded
Rxs 4 14 14 14
14 0 0 0 No. of New Rxs
0 14 16 26 26
34 36 30
---- ---- ---- ---- ----
---- ---- ---- Total per year
6 30 32 40 40
34 34 30
Hayward
11EVLA Amplifier Production Schedule
----------------------------------------
----------------------------------------
2002 2003 2004 2005 2006
2007 2008 2009 2010
--------------------------------------------
---------------------------- Sub- Antennas
gt--1-7---gt--8-14--gt-15-21--gt-22-28-
-gt total
----- K-Amps
2 2 2 2 2 2 2 2 2 2 2 2
24 Q-Amps
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
32
C-Amps P4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
72 U-Amps P4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
72
L-Amps P4 2 2
2 2 2 2 2 2 2 2 4 4 4 4 4 4 4 4 4 4 4 4
72 X-Amps P4 2 2 2
2 2 2 2 2 2 2 4 4 4 4 4 4 4 4 4 4 4 4
72
S-Amps P4 2 2
2 2 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
72 A-Amps P4 2
2 2 2 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
72 ---------------------------------
---------------------------------------
2002 2003 2004 2005 2006
2007 2008 2009 2010
---------------------------------------------
--------------------------- Prototypes 0
8 8 8 0 0
0 0 0 Production 0 8
50 62 70 82 64 64
64 ---- ---- ----
---- ---- ---- ---- ----
---- Total/year 0 16 58 70
70 82 64 64 64
488
Hayward