Your Steel Bridge Specialists - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Your Steel Bridge Specialists

Description:

Patrick Allen -Design Engineer. Eric Beier -Project Manager. Amanda Stevens -Project Editor ... D = Maximum Height 18 OR 24' Design Requirements : Efficiency ... – PowerPoint PPT presentation

Number of Views:52
Avg rating:3.0/5.0
Slides: 21
Provided by: RHIT
Category:

less

Transcript and Presenter's Notes

Title: Your Steel Bridge Specialists


1
Your Steel Bridge Specialists
Proposal for Steel Bridge Design Competition Entry
Tacoma Design Inc.
2
Tacoma Design Inc.
  • Patrick Allen -Design Engineer
  • Eric Beier -Project Manager
  • Amanda Stevens -Project Editor
  • Adam Ziegler -Project Engineer

Tacoma Design Inc.
3
Your Steel Bridge Specialists
Project Description - Patrick
Design Requirements - Amanda
Project Approach - Eric
Schedule - Eric
Fee - Adam
Conclusion - Adam
Tacoma Design Inc.
4
Project Description
  • American Institute of Steel Construction (AISC)
  • American Society of Civil Engineers (ASCE)
  • Benchmark Fabricated Steel Inc.
  • Student Steel Bridge Competition
  • (Regional and National)
  • Problem Statement

Tacoma Design Inc.
5
Design Requirements
6
Design Requirements
  • Scoring Criteria
  • Stiffness
  • Lightness
  • Construction Speed
  • Efficiency
  • Economy
  • Aesthetics

Tacoma Design Inc.
7
Design Requirements Stiffness
Aggregate deflection Penalties
Tacoma Design Inc.
8
Design Requirements Lightness
  • Total Weight Penalties
  • Penalties include
  • Dimensional violations
  • Non conforming components

Tacoma Design Inc.
9
Design Requirements Construction Speed
Time Penalties
Tacoma Design Inc.
10
Design Requirements Efficiency
  • Cs W ? D
  • Cs Structural Cost
  • W Weight OR 100 lbs
  • ? Aggregate Deflection OR 1
  • D Maximum Height 18 OR 24

Tacoma Design Inc.
11
Design Requirements Economy
  • Cc Time Number of Builders 100,000

Tacoma Design Inc.
12
Design Requirements Aesthetics
  • Aesthetics is Tie-Breaker
  • Includes
  • Full name of school on bridge
  • Poster describing design and fabrication process
  • Design, elegance, and finish of bridge

Tacoma Design Inc.
13
Project Approach
  • AISC/ASCE Competition
  • Steel Bridge No. 1
  • Steel Bridge No. 2

Tacoma Design Inc.
14
Project Approach AISC/ASCE competition
  • Study Rules of Contest
  • Bridge Erection Practice
  • Aesthetic Improvements
  • Regional Bridge Competition
  • National Bridge Competition

Tacoma Design Inc.
15
Project Approach Steel Bridge No. 1
  • Preliminary Designs
  • Structural Analysis
  • Consult Bridge Erector
  • Shop Drawings
  • Cost Analysis
  • Fabrication
  • Test and Analyze
  • Redesign Considerations

Tacoma Design Inc.
16
Project Approach Steel Bridge No. 2
  • Preliminary Designs
  • Structural Analysis
  • Shop Drawings
  • Cost Analysis
  • Fabrication
  • Test and Analyze

Tacoma Design Inc.
17
Schedule
18
Project Fee
Tacoma Design Inc.
19
Conclusion
Project Description
Design Requirements
Project Approach
Schedule
Fee
Conclusion
All figures and competition information
from http//www.aisc.org/steelbridge.html
Tacoma Design Inc.
20
Conclusion
  • Design a strong, economical, attractive bridge
  • Win at Regional level (Evansville)
  • Be competitive at National level (San Diego)

Tacoma Design Inc.
Your Steel Bridge Specialists