Title: Leighton India


1
Leighton India
AUSTRALIA INDIAJOINT BUSINESS COUNCIL SUMMIT 2008
  • Melbourne, May 2008

2
Outline
  • Leighton Group Overview
  • Leighton India
  • Mining Overview
  • Contract Mining

3
The Leighton Group
  • Established in Australia in 1949
  • Australias largest project development and
    contracting group
  • Headquarters in Sydney, Australia
  • In 1962 listed on Australian Stock Exchange
  • Over 25,000 employees
  • Undertakes engineering infrastructure, building
    property, mining resources,
    telecommunications, operations maintenance and
    environmental services
  • International Operations across Asia, India,
    Middle East Africa

4
Leighton Group
  • Financial Highlights
  • 30 June 2007
  • US INR (Crs)
  • Revenue 10.5 b 41,500
  • PBT 509 m 2036
  • Work in hand 18.5 b 74,000
  • Total assets 4.1 b 16,400

5
Leighton Group Structure


6
Leighton in India Projects executed
Kochi Pipeline
Mumbai Airprot
Reliance Jamnagar
Flextronics
Nokia Factory
JV with EMAAR MGF
7
Leighton in India Projects executed
NH 11 Agra Bharatpur Highway
  • Engineering, Procurement and Construction
  • - 45 km long stretch
  • - embankment fill, road realignment
  • - construction of 94 structures comprising
    culverts, underpasses minor bridges
  • - other associated works

Client NHAI/ OSE Duration 20 months
Value US 46 million
NH 3 Indore Kalaghat Highway
Engineering, Procurement and Construction - 76
km long stretch - embankment fill, road
realignment - construction of 31 bridges, 13
underpasses and 154 minor structures - other
associated works
Client NHAI/ OSE Duration 26 months
Value US 115 million
8
Leighton in India Projects executed
Motorola Facility
  • Construction of manufacturing Facility
  • - 70 hectare of land development
  • - Main factory building of 144 m X 144 m
  • - Office space and two plant rooms
  • - Associated works

Client Motorola Duration 9 months
Value US 40 million
PRP - II
Recent Award of Contract from ONGC - INR 3000
Crs/ USD 750 m - Pipe Replacement Program
Client ONGC Duration 36 months
Value US 750 million
9
Leighton India
  • Operates from 3 main offices Chennai, New Delhi
    Mumbai
  • Employ over 2,000 staff
  • Budget annual turnover for 2007-8 US300 million
  • Diverse range of construction work

10
Leighton India - Buildings
  • 5 building projects underway or completed in
    Chennai Mumbai
  • Clients include Nokia, Motorola, Flextronics,
    Reliance Salcomp
  • Contract values between US10 million US150
    million
  • JV with Emmar MGF

11
Leighton India Oil Gas
  • 4 projects underway or completed in Jamnagar
    Kochi
  • Specialist on offshore marine pipelines
  • Dedicated marine equipment
  • Current contract values between 40 million and
    US720 million

12
Leighton India Infrastructure
  • Industrial and residential buildings
  • On and offshore marine pipelines for Oil Gas
    industry
  • Toll road projects for NHAI
  • Airport infrastructure works
  • Railway signaling communications

13
Management systems
  • Integrated Management System
  • Regional procedures policies provide framework
    for project management plan
  • Management structure and systems geared to
    support the primary project
  • Functions of design/engineering, project
    execution completion
  • Computerized cost management system (Cheops)
  • Computer Aided Tendering System (CATS)
  • Planning Programme
  • Use of project management software to schedule
    design, procurement and construction activities

14
Quality Assurance/Quality Control
  • Leighton in Asia has operated a formal quality
    management system in Asia for over 13 years
  • The system is third-party accredited ISO 9001 in
    a number of regions, including the Hong Kong SAR,
    the Philippines and Malaysia
  • All Leightons projects implement a formal QA and
    QC program as required by third-party
    accreditation

15
Environmental, health and safety
  • Outstanding safety record
  • Health and safety accreditation OHSAS 180011999
  • Environmental accreditation ISO 140012004
  • Focused on customer satisfaction through quality
    and safety procedures

16
Mining Overview
17
Leighton mining scope of services
  • Mine Planning
  • Mine Infrastructure Development
  • Engineering, Procurement Construction (EPC)
  • Overburden and Waste Rock Removal
  • Coal and Ore Mining
  • Total Mine Management, Operations and Maintenance
  • Process Plant Management, Operations and
    Maintenance
  • Mine Rehabilitation

18
Leighton Group Mining Background
  • Largest contract miner in the world
  • Heavily involved in development of coal iron
    ore resources in Australia and Indonesia
  • Extensive experience in all types of open cut
    mining
  • Caterpillars number one global customer
  • Experienced in mining coal, gold copper, nickel
    and iron ore

19
Current Mining Operations Australia NZ
20
Current Major Projects Australia NZ
21
Current Major Projects Australia NZ (cont)
22
Indonesia
  • Established in 1974 under John Holland
  • Acquired by Leighton Asia in 2000
  • Civil infrastructure
  • Numerous Long-term mining contracts
  • Training Indonesian employees to Australian
    standards

23
Current Mining Operations Indonesia
24
Current Major Projects Indonesia
25
Contract Mining
26
Features of Contract Mining
  • Mining/earthmoving not necessarily core business
    of mine owners
  • Contractors focus entirely on the mining process
  • Minimize Capital Risk
  • Minimize Operating Risk
  • Improved Performance and Efficiency
  • Access to large modern fleet

27
Plant and Equipment
  • One of the few contractors to own, operate and
    maintain a fleet of major plant and equipment
  • Largest fleet of mobile plant in Australia
  • Replacement value in excess of A1 billion
  • Plant fleet is professionally maintained in-house
    to optimise efficiency and performance
  • In 2004 the Leighton Group was the largest
    purchaser of Caterpillar equipment in the world

28
Types of Contracts
  • Schedule of Rates
  • Unit Rates
  • Cost plus
  • Alliance
  • BOOT/BOT
  • Combinations

29
Typical Equipment Used
  • Equipment determined by production requirements,
    mine planning constraints, dealer back up site
    conditions
  • Up to 600t hydraulic excavators
  • Up to 240t dump trucks
  • Strong purchasing power with manufacturers
  • Sophisticated equipment maintenance programs,
    achieving high availabilities

30
Personnel
  • Expatriates used for some start up and ongoing
    positions
  • Emphasis on training local workforce
  • Existing Indonesian Australian operations used
    for training local workforce, technical
    operational
  • Extensive on site training used including use of
    equipment trainers simulators

31
Thank you for your attention