LANSCE Timing Requirements LA-UR-03-3376 - PowerPoint PPT Presentation

About This Presentation
Title:

LANSCE Timing Requirements LA-UR-03-3376

Description:

Neutron Chopper and AC Line Coupling. Maximum Slew Rate = 0.3 Hz/second ... Chopper Tracking Sigma = 330 nanoseconds. Current Architecture. Star configuration ... – PowerPoint PPT presentation

Number of Views:13
Avg rating:3.0/5.0
Slides: 7
Provided by: IM161
Learn more at: https://epics.anl.gov
Category:

less

Transcript and Presenter's Notes

Title: LANSCE Timing Requirements LA-UR-03-3376


1
LANSCE Timing RequirementsLA-UR-03-3376
  • Eric Bjorklund

2
Basic Characteristics
  • Gate rather than Event driven system.
  • 96 independent timing gates ? 82 gates in use.
  • 8.3 millisecond machine cycle (120 Hz).
  • 1 second super-cycle.
  • Clock synchronized with ring RF.
  • 2.7951389 MHz.

3
Resolution, Accuracy, Stability
  • Resolution 1 microsecond
  • Accuracy ? 180 nanoseconds
  • Stability (jitter) 30 nanoseconds

4
Neutron Chopper and AC Line Coupling
  • Maximum Slew Rate 0.3 Hz/second
  • Maximum Drift ? 100 microseconds
  • Accelerator Tracking Sigma 25 microseconds
  • Chopper Tracking Sigma 330 nanoseconds

5
Current Architecture
Timing Gates
  • Star configuration
  • 4 redundant gate generator sets in 2 CAMAC
    crates.
  • Gate generators are loaded by Master Timer
    computer, then run independently.
  • Master Timer computer checks the output of the
    gate generators and automatically switches to
    another set when a discrepancy is seen.

Timing Distribution
Master Timer
Timing Gate Generators
MUX
6
Additional Requirements For Upgraded(Distributed)
System
  • Front-end IOCs need some way to know which cycle
    they are currently in and when a cycle starts
  • Front-end IOCs need some way to know the Flavor
    of the current cycle.