Hybrid Module Testing Status
  • Week of 6/6-6/10

2
UCSB Hybrid Testing Status
3
UCSB Hybrid Testing Failures
  • This Week
  • 1 shorts in PA
  • Repairable
  • 4 modules repaired
  • Cumulative
  • 1 with Shorts in PA
  • Repairable
  • 1 Major Scratch in PA
  • Repairable
  • 2 noisy on edge channels
  • Should be ok
  • 1 Smashed APV-PA Bonds
  • Repairable
  • 6 Failed Inspection
  • Never should have sent
  • 1 Broken Ceramic
  • 1 Bad Bond Feet
  • 1 Weak Wirebonds
  • 1 Too Many Opens
  • 4 with unknown failure
  • Effects entire chip(s)

4
FNAL Hybrid Testing Status
5
FNAL Hybrid Testing Failures
  • This Week
  • Cumulative
  • 7 with Shorts in PA
  • Repairable
  • 1 Major Scratch in PA
  • Repairable
  • 1 Damaged during repair
  • 5 Too Many Opens Noisy
  • 14 with unknown failure
  • Effects entire chip(s)

6
US Hybrid Testing Status
7
UCSB ARCS Testing Status
8
UCSB ARCS Testing Failures
  • This Week
  • None
  • Cumulative
  • 2 with too much current
  • 1 with gt2 bad channels
  • 1 with bad DCU
  • Repairable
  • 1 with CF frame shorted to HV
  • Repairable
  • 1 with bad Dec. Mode chip

9
UCSB ARCS Testing Results
  • 945 Total Tested
  • 936 Grade A
  • 3 Grade B
  • 6 Grade F
  • This week
  • 10 of 44032 channels bad (0.023)
  • Total Production
  • 304.5 of 643328 channels bad (0.047)

10
FNAL ARCS Testing Status
11
FNAL ARCS Testing Failures
  • This Week (8387-8446, 60 modules).
  • 1 mod, real pinholes (8417, chs 1,4,6,7 PASi
    pulled), OK.
  • 1 mod 30 mkA at 15V (8421, ch 289 PASi pulled),
    OK.
  • no PHL-
  • 3 SHT (8411, 8430, 8434).
  • Cumulative (7835-8446)
  • 2 grade B (mishandling missing bonds on p/a)
  • 7970 - breakdown current behavior _at_430V
  • Total of 14 pinholes
  • Grade F problem with chip 2 (every 8th channel
    is identified as PHL-)
  • Grade F-High current 8289
  • Cumulative (7702-8446, 745 modules, ARCSed 744)
  • 2 grade B (mishandling missing bonds on p/a)
  • 2 grade F mishandling
  • 1 grade F under study
  • 7970 - breakdown current behavior _at_430V

12
FNAL ARCS Testing Results
  • 747 Total Tested
  • 737 Grade A
  • 2 Grade B
  • 5 Grade F
  • This week
  • Total Production

13
US ARCS Testing Status
14
UCSB LT Testing Status
Failed module has too much current
15
FNAL LT Testing Status
  • Modules 30200020008325 8345, 8425-8434,
    8413-8422
  • were tested during June 9 June 13.
  • We did 4 runs.
  • K-Mux errors were happening two times only in
    the beginning of new run, program had to be
    restarted
  • Quick connect between hose and coldbox was
    damaged and leaking. Replaced quick connect and
    renewed the liquid delay in one run.
  • Module 8348 had high leakage current
    (2.8uA_at_450V) and steeper then usual.
  • Modules 8331, 8336-8345, 8431 had high noise in
    the cold record (3.5ADC) -gt all channels
    marked NOISY -gt xml -1
  • Possible reason no HV bias during cold cycle.
    Need more quiet time to investigate.
  • Backlog 54 modules

16
FNAL LT Testing Status
17
US LT Testing Status