Andy Sokol AE - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Andy Sokol AE

Description:

Andy Sokol (AE) Kyra Boback (AE) Madeline Clark (AE/SS) Patti Ferraro (Met) Corey Calvert (Met) Emanuel Brown (AE) Joseph Pearce (CompE/EE) Christopher Han (EE) ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 13
Provided by: ebr76
Category:
Tags: andy | calvert | sokol

less

Transcript and Presenter's Notes

Title: Andy Sokol AE


1
  • Andy Sokol (AE)
  • Kyra Boback (AE)
  • Madeline Clark (AE/SS)
  • Patti Ferraro (Met)
  • Corey Calvert (Met)
  • Emanuel Brown (AE)
  • Joseph Pearce (CompE/EE)
  • Christopher Han (EE)

2
Mission
  • Rocket design, assembly, launch
  • Payload development, construction, and
    integration
  • Data transmission and analysis
  • Recovery of some or all components
  • Union of academic departments

Phobos EAV Courtesy of MARS
3
Rocket
  • 100,000 ft. Boosted Dart
  • Dart to reach hypersonic speeds
  • O-Class engine
  • 40000 N-sec
  • G-loading varies with burn time
  • NEFAR Assistance
  • Collaboration with experienced individuals
    improves probability for success

4
Flight Plan
5
Launch Site Options
  • Primary FSA Pad 47
  • Cleared range required, FAA approval
  • Secondary Palm Bay
  • OK to 50,000 feet, more pending string-pulling
  • Tertiary South Florida
  • Road trip! OK to 200,000 feet

6
Payload
  • Construction underway
  • Instruments sensors
  • Temperature
  • Pressure
  • Relative Humidity
  • Wind speed direction
  • Ozone
  • Altitude
  • GPS

Past student project (9/8 diameter) Michigan Tech
Beta Prototype (test-ready) deadline
Thanksgiving Break
7
Payload
Payload
  • Fortification epoxy, polyurethane, etc.
  • Testing Temperature extremes, drops from
    altitude, airplane drops, impact hammer, etc.
  • Specialized parachute and altimeter

Beta Prototype (test-ready) deadline
Thanksgiving Break
8
Alpha Prototype
9
Data Transmission
Ant
Ant
L-P
Amp
Wireless Transmission

On-board Storage Goal
independence
Amp
L-P
IRU
ITU
Dmod
Mod
Comp
Equip
10
Budget
  • Overall 19,000
  • Phase I 8,000 by 11/04/02
  • Phase II 5,000 by 12/02/02
  • Phase III 6,000 by 02/03/03
  • Companies Solicited
  • Command Technologies
  • SAIC
  • Fab-Tech Industries
  • Sensidyne
  • Stottler Stagg Associates
  • Titan Systems
  • Coral Bay
  • Ron Jon Surf Shop
  • FSA
  • FSRI
  • ACTA
  • AIAA
  • AJT Associates
  • Command Control Technologies
  • bd Systems
  • CADD Group
  • Reynolds, Smith Hills
  • Engineering Technologies, Inc.
  • QTSI
  • Gold Coast Wire Assemblies
  • Interface Control Systems
  • ImageLinks
  • Logistics Services International

etc
11
Sponsorship
12
Want More?
http//jamstar.web1000.com
Write a Comment
User Comments (0)
About PowerShow.com