Fume Hood Roof Safety Assessment Program
2
Purpose
  • Identify potential safety hazards for persons
    needing roof access.

3
Benefits
  • Identify all buildings with fume hoods
  • Document / Link Equipment
  • Identify / Assess Problems
  • PM Numbering
  • Makes scheduling shutdowns easy
  • Clear policies and procedures
  • Tagging makes fans easily identifiable
  • Educate persons on roof access procedures

4
Intended Users
  • Trades Persons
  • Architects and Engineers
  • Inspectors
  • Contractors
  • Construction Management Persons
  • Other University Units

5
Campus Buildings
Yellow Complete White Marked up drawings in
process
49 Buildings Total with 1562 Fume Hoods
  • 415 NAME
  • 125 Neuroscience
  • 204 Public Health I
  • 234 Public Health II
  • 208 Randall Lab
  • 441 Space Research
  • 195 Upjohn
  • 333 400 North Ingalls
  • 432 Art Architecture
  • 403 Cooley Bldg..
  • 742 CSSB
  • 189 Dana Natural Resources
  • 165 Dennison
  • 162 Dental School
  • 447 Dow
  • 395 FXB
  • 176 Health Services
  • 324 Kellogg Eye Center
  • 178 Newberry
  • 211 Kraus
  • 182 Kresge I
  • 171 Kresge II
  • 199 Kresge III
  • 190 Medical Science I
  • 200 Medical Science II
  • 418 NCSB
  • 202 NUB
  • 230 Pharmacy
  • 404 Phoenix Lab
  • 260 Power House
  • 193 Ruthven Annex
  • 2501 Auxiliary Services
  • 332 300 North Ingalls
  • 305 Alice Crocker Lloyd
  • 168 Animal Research
  • 799 BUHR
  • 188 C.C. Little
  • 226 CCRB
  • 158 Chemistry
  • 166 East Hall
  • 448 EECS
  • 414 EWRE
  • 407 G.G. Brown
  • 436 IST
  • 101 Kresge Hearing
  • 223 MSRB I
  • 213 MSRB II
  • 229 MSRB III

6
Hospital Buildings
7 Buildings
  • University Hospital
  • MCHC
  • Holden
  • Mott
  • Kellogg-Turner
  • Eisenhower Park West
  • Cancer Geriatrics Center

There are 92 Fume Hoods and 132 Bio-Safety
Cabinets located in the Hospital Buildings all
documented by the program.
7
Procedures
  • Develop background plans for floors roofs.
  • Obtain O.S.E.H. fume hood test and certification
    list.
  • Review existing facility drawings.

8
Procedures
  • Field verify all fume hood and exhaust sources,
    including smoke test if required, document
    changes and additions, duct routing, starter
    locations, and questionable arrangements.
  • Document all mechanical equipment on roof. (i.e.
    exhaust fans, rooftop units, condensing units,
    outdoor air intakes)
  • Measure stack diameters and heights.

9
Procedures
  • Transfer all field-gathered data to drawings.
  • Engineering assessment of systems.
  • Perform final review and check to verify accuracy.

10
Procedures
  • Install signs, tags and tapes.
  • Use UV resistant permanent marker on all tags and
    UV tape.

11
Procedures
  • Not all fans get tagged.
  • Not all buildings get tagged.
  • Place completed drawings in the master Roof
    Safety Plan book located in the Plant Engineering
    department office.
  • On completion, distribute plans to appropriate
    departments.

12
Compliance
  • Maintenance of program

All users will be expected to help maintain the
accuracy of the Roof Safety Plans.