Title: AB-LTC Technical Review
1AB-LTC Technical Review
Extraction Protection Elements, TCDS, TCDQ. Wim
Weterings Contributions from Brennan
Goddard Marta Sans Merce Benoit Riffaud Marcel Gyr
2Outline
Introduction TCDS TCDQ Concept Technical
Solutions Planning Status Conclusion
3Introduction
TCDS Fixed diluter block to protect the MSD
Septa in the event of an asynchronous firing of
the MKD kickers.
TCDQ - Mobile diluter block to protect Q4
magnets in the event of an asynchronous firing of
MKD kickers.- Protects the arc at 450GeV and the
triplet apertures at 7TeV from small impact
parameters bunches.
4(Some) Design Parameters
- TCDS - Dilute about 6.1 MJ of energy, 1.7 of
the energy contained in the LHC beam at 7 TeV. - TCDS - Max. 300C in MSD vacuum chamber and max.
100C in the MSD Yoke. - TCDS - Aperture for circulating beam (n1 6.5)
- TCDQ - Max. energy deposition in Q4 of 100 J/g.
- TCDQ movement 15 mm (10s at 7 TeV and 450 GeV)
with precision of 0.25mm (0.5 s at 7 TeV). - Nominal vacuum pressure of lt10-8 Pa.
- Assure a low transverse machine impedance.
- Limit radiation exposure of personnel.
5TCDS Concept
Functional Specification LHC-TCDS-ES-0001 (EDMS
393973)
0.5m Ti 4.5 g/cm3
1m AlN 3.31g/cm3
1.5m Graphite 1.77 g/cm3
2m Carbon Composite 1.4 g/cm3
1m Graphite 1.77 g/cm3
6TCDS Technical Solution
MSD
- Two 3 meter long vacuum tanks Ø250mm.
- Two sublimators and two 400 l/s ion pumps/tank.
- 500 mm for interconnection.
- Independent supports with 3 point alignment.
7TCDS Technical Solution
Absorber Blocks
CirculatingBeam
ExtractedBeam
8TCDS Planning
9TCDQ Concept
Functional Specification LHC-TCDQ-ES-0001 (EDMS
01/2004)
- Initial MARS simulations resulted in a 10m C 1m
Fe structure. (N. Mokov et al., Fermilab,
FN-0724) - Iterations in FLUKA are ongoing with Q4
implemented in geometry. (M. Sans Merce AB/ATB) - Preliminary results favour a TCDS-Type, but
longer, structure.
10TCDQ Technical Solution
Absorber Block
TCDQ
TCDS
Motorisationsystem
CirculatingBeam
11TCDQ Planning
12Status Conclusion
- TCDS Functional Specification approved, TCDQ
Functional Specification to be approved 01/2004. - One full time designer is working on the project,
with an additional designer starting 01/2004. - Assembly and construction options (in-house vs
outsourced) presently being studied in the light
of group reçourses and priorities. - Advancement is still according to work unit
planning, TCDQ schedule tight but still feasible
(no room for delays).
13Status Conclusion
- No problems anticipated for the CtC.
- No problems anticipated to reach the design
parameters. - EDMS / Hardware baseline documentation minor, but
present. - Integration studies in collaboration with ICL
have started. - Installation issues have not yet been looked at.