Title: Term Project: Challenges in supplying Energy to Central Region


1
Term ProjectChallenges in supplying Energy to
Central Region
  • By
  • Mohammed Shaflout Ali
  • August 20, 2005

2
OUTLINE
  • Introduction
  • Objective
  • VE Job Plan
  • - Information Phase
  • - Creative Phase
  • - Evaluation Phase
  • - Development Phase
  • - Presentation Phase
  • - Implementation Phase
  • - Audit Phase
  • Q A

3
INTRODUCTION
  • Demand on electricity in Central Region of Saudi
    Arabia has increased dramatically in the last 3
    years ago ( Due to 9/11 Incident)???
  • SEC wants to determine the optimum power will be
    transmitted to Central Region at the most optimum
    cost.
  • The original proposal was to import 1800MW to
    Central From West via 1200KM High Voltage A/C
    Transmission Line.

4
Existing Network
Planned Network
5
OBJECTIVE
  • To study and compare the original proposal with
    other alternatives and choose the most suitable
    system using V.E. techniques.

6
INFORMATION PHASE
  • Provide save and reliable electricity
  • Satisfy customer needs
  • The material to be in-kingdom
  • Low operational and maintenance cost

7
INFORMATION PHASE
  • Cost Data
  • Idea
    Cost
  • HVAC
    700M
  • HVDC
    550M
  • Building Gen. Plant 1200M

8
FUNCTION PHASE
  • Function Worksheet

9
FUNCTION PHASE
  • Identify Present Function
  • What does it do?
  • Verb Noun
  • Supply Energy
  • What must it do?
  • Verb Noun
  • Meet Increase in
    demand
  • Ensure Reliability
  • Enhance Stability

10
CREATIVE PHASE
  • Generate Ideas
  • Install 1200KM/380KV HVAC Transmission Line.
  • Build new Generation Plant.
  • Install 1200KM/500KV HVDC Transmission Line.
  • Co-generation agreements
  • Buy energy from private generation companies.

11
EVALUATION PHASE
  • Feasibility Ranking

12
  • Idea Comparison

13
EVALUATION PHASE
  • Weights For Evaluation
  • A Initial Cost
  • B Operation
  • C Maintenance
  • D Reliability
  • E Constructability

14
Evaluation Matrix
15
DEVELOPMENT PHASE
16
DEVELOPMENT PHASE
  • Savings
  • Proposal
    Initial Cost (M)
  • 1)- HVAC
    700
  • 2)- HVDC
    550

  • Saving 150

  • Reduction 21
  • Life Cycle Cost
  • In Modern HVDC systems Normal Routine
    Maintenance can be done one week/2years.
    Moreover, HVDC systems require a few skilled
    staff to do the job. In terms of thermal rating
    HVDC systems can live long time. In contrast,
    HVAC needs lots of maintenance work and staffs
    i.e. lines and insulators wash, insulation test
    and patrolling. losses, tripping and short
    circuits can harm the HVAC aging . So, the
    maintenance cost for HVDC is less and the Return
    On Investment is guaranteed.


17
VALUE STUDY SUMMARY
  • The HVDC has the following advantages
  • Ensure very low environmental impact reduce
    construction time.
  • Economically transmits large amount of power over
    long distances.
  • Ensure minimum losses.
  • Maintenance requirements are low.
  • Flexibility of operation and control.
  • Return on Investment is very high.

18
PRESENTATION PHASE
  • V.E. study to be presented to the executive
    management to show the recommended alternative.

19
IMPLEMENTATION PHASE
  • How should it be implemented?
  • The proposed method will be award to GES
    contractor to prepare the drawings and the
    estimate.
  • What should be changed and in what sequence?
  • HVDC components to be installed in the
    transmitter and receiver end while construction
    the line.
  • Who should do it?
  • Qualified contractor who did similar projects
    before.

20
AUDIT PHASE
  • Management should assign team to assure the
    desired results have been attained, properly
    documented and reported.

21
  • Thank you