NF Design Study
  • Neutrino Factory, Superbeam and Beta-beam
    network - part of CARE bid under ESGARD, called
    BENE - proposal already being written -
    limited to organising meetings, initiating work,
    reports - 1.5M - deadline 15th
    April - coordinated by Vittorio Palladino
  • Design studies - can be used to
    investigate new infrastructure - possible to
    bid for hardware costs - 200M over three
    years, 70M/year - First closing date 15th
    October 2003 - 10-15M feasible for NF

2
FP6 Design Studies
  • EC will contribute to
  • Feasibility studies paper studies
  • Technical Preparatory Work hardware
  • On new research infrastructures with a clear
    European dimension and interest.
  • Includes future facilities of world-wide
    relevance not existing in Europe
    infrastructures constructed outside EU!

3
FP6 Design Studies
Feasibility studies
  • Aim Lay conceptual foundations for new
    infrastructure
  • Methods
  • Basic feasibility study
  • Explore new fundamental technology
  • Detailed engineering design, particularly most
    advanced

TPW
  • Includes
  • Development and testing of critical components,
    sub-systems, materials or techniques, including
    software
  • Does not include
  • preparatory work based on existing or proven
    techniques
  • reproduction of available components or materials

4
FP6 Design Studies
Funding
  • Total budget 200M 70M in first call
  • EC contribution per project ? 10M
  • 50 matching required(?)

Timing
  • Call for proposals 1st July 2003
  • Deadline 15th October 2003
  • Evaluation results mid-Feb 2004
  • Contract signatures end-2004

5
NF Design Studies
Two so far
  • FS 1 FNAL ? performance not good
    enough ? too expensive
  • FS 2 BNL ? performance good enough
    ? still too expensive
  • FS 3 ? (RAL?) - Take FS2 and reduce
    cost - Will require investigation of new
    techniques - Start 2005

6
EU Studies
  • No design study so far
  • Two layouts CERN (complete) RAL (under
    development)
  • Effort dramatically reduced by CERN budget cuts
  • ECFA task forces re-organised
  • ENG kick-off meetings tomorrow

Task Force CERN New
SPL Roland Garoby Pascal Debu (Saclay)
Proton Rings Horst Schonauer Chris Prior (RAL)
Target Helge Ravn Roger Bennett (RAL)
Collection Helge Ravn J.E. Campagne (LAL)
Frontend Alessandra Lombardi Rob Edgecock (RAL)
Acceleration and Storage Ring Andre Verdier Francois Meot (Saclay)
7
Design Study Bid
  • Need to merge all three of these
  • World-wide Design Study, EU part funded 50 by
    FP6
  • Aim CDR for a Neutrino Factory
  • Organistion Host laboratory RAL
    Project leader Ken Peach Deputy
    Rob Edgecock Proton
    Driver Debu, Garoby, Prior US, JP
    Targetry Bennett, Ravn US, JP
    Collection Campagne US, JP
    Frontend Edgecock US, JP Accel
    SR Meot, Verdier US, JP

8
Design Study Bid
Feasibility study
Now to mid-2006 investigate alternatives id
entify RD required Mid-2006 to end
2009 optimise NF design, CDR
TPWs
2003 MICE, TTA, CTA, ???? 2005 RD identified
by FS