Pesticide Application Contract Workshop - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Pesticide Application Contract Workshop

Description:

Roadside Vegetation Management is the top priority of the ... Reconfiguring complement due to absences. Maintain in ... Reconfiguring complement due to ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 20
Provided by: jonjo
Category:

less

Transcript and Presenter's Notes

Title: Pesticide Application Contract Workshop


1
Pesticide Application Contract Workshop
  • 2005 Roadside Vegetation Management Training
    Seminar

2
Objective
  • Discuss approaches to optimize contract
    effectiveness
  • Elements of contract being reviewed include
  • Equipment Specifications
  • Complement
  • Training
  • Quality Assurance
  • Enforcement
  • Productivity
  • Flexibility

3
Premise
  • Roadside Vegetation Management is the top
    priority of the DRS position
  • Contracts should optimize Roadside Vegetation
    Management by
  • Specifying adequate complement to complete each
    program in its desired window
  • Keeping the complement fully engaged during the
    entire vegetation management season
  • Providing for training and retention of
    knowledgeable applicators
  • Provide the DRS and the applicators flexibility
    to adjust operations on a day-to-day basis to
    accommodate weather and staffing

4
Equipment Specifications
  • Spray head nozzle configuration
  • Tank sizes
  • Fixed pattern vs. handgun

5
Spray Head Nozzle Configuration
www.truenorthspecialty.com
http//www.rittenhouse.ca
6
Tank Sizes
Fixed Pattern vs. Handgun
www.nrrbs.com.au
7
Objective
  • Discuss approaches to optimize contract
    effectiveness
  • Elements of contract being reviewed include
  • Equipment Specifications
  • Complement
  • Training
  • Quality Assurance
  • Enforcement
  • Productivity
  • Flexibility

8
Complement
  • Dedicated driver/applicator
  • Reconfiguring complement due to absences
  • Maintain in-season staffing
  • Maintain staffing year-to-year

9
Dedicated Driver/Applicator
Reconfiguring complement due to absences
Maintain Staffing (in-season, year-to-year)
10
Objective
  • Discuss approaches to optimize contract
    effectiveness
  • Elements of contract being reviewed include
  • Equipment Specifications
  • Complement
  • Training
  • Quality Assurance
  • Enforcement
  • Productivity
  • Flexibility

11
Training
  • Licensed in Categories 10, 14, 23
  • CDL Requirements
  • Mandatory Regional Meeting Attendance

12
Objective
  • Discuss approaches to optimize contract
    effectiveness
  • Elements of contract being reviewed include
  • Equipment Specifications
  • Complement
  • Training
  • Quality Assurance
  • Enforcement
  • Productivity
  • Flexibility

13
Quality Assurance
  • Oversight requirements
  • Daily contact
  • Cell phones
  • GPS
  • Electronic vs. paper M609
  • Inspectors (see enforcement, next slide)
  • On-site, pre-season inspection
  • Contractor vs. Dept. providing herbicides

14
Objective
  • Discuss approaches to optimize contract
    effectiveness
  • Elements of contract being reviewed include
  • Equipment Specifications
  • Complement
  • Training
  • Quality Assurance
  • Enforcement
  • Productivity
  • Flexibility

15
Enforcement
  • Methods to enforce contractor performance
  • What is 90 control?
  • Termination due to underperformance

16
Objective
  • Discuss approaches to optimize contract
    effectiveness
  • Elements of contract being reviewed include
  • Equipment Specifications
  • Complement
  • Training
  • Quality Assurance
  • Enforcement
  • Productivity
  • Flexibility

17
Productivity
  • How to ensure mechanical reliability?
  • Pre-season inspection and timing
  • Equipment age
  • Equipment condition
  • Liquidated damages for lost time
  • Control of mixing procedures/time

18
Objective
  • Discuss approaches to optimize contract
    effectiveness
  • Elements of contract being reviewed include
  • Equipment Specifications
  • Complement
  • Training
  • Quality Assurance
  • Enforcement
  • Productivity
  • Flexibility

19
Flexibility
  • Department Force vs. Contract
  • Hourly vs. Lump Sum or End Result
  • Number of complements
  • Equipment configuration
Write a Comment
User Comments (0)
About PowerShow.com