Title: WHICTS County ICT Programme Board
1Worcestershire Health ICT Services County ICT
Programme Board Presentation (21st Oct
08) John Thornbury Director, Worcestershire
Health ICT Services John.thornbury_at_nhs.net 078
667 213 71 (wictp_n_081021_00_presentation.ppt)
2Ag. 2 Demo (W031 e-consent) (POSTPONED)
- Extra Detail in Attachment 1.
- Aims of project
- Implement DoH model consent policy.
- Ensure compliance with NHSLA risk management
standards (Level 3), which have replaced previous
CNST standards. - Ensure compliance with Standards for Better
Health (C13b C16) - Make the consent process more user friendly,
benefiting patients, healthcare professionals and
the organisation. - Drivers included
- 51 of medical notes lack documented evidence
that the benefits and risks of a procedure have
been discussed with the patient. - 31 of consent forms lacked date that the consent
obtained recorded. - 37 lacked patients NHS number recorded.
- 26 of consent forms were not signed by a health
care professional. - 5 lacked name of procedure to be performed
recorded. - lt 5 of patients received relevant information
leaflet. - Objectives Approach
- Identify procedures performed within Trust
requiring written consent. - Establish procedure requiring written consent
within the Trust. - Produce Trust wide gold standard, clinically
approved patient info. - Distribute information provide appropriate
training.
3Ag. 2 Demonstration (W031 e-consent) (contd.)
- The System
- Via Web front end, designed built in-house.
- Integrated to user account system (Active
Directory) to provide authorised consent list. - Links the relevant documentation together to
provide a consistent view and process. Pulls
together the associated patient information for a
consent form which could detail one of more
procedures and provides this as one pdf document
which is printed at time of consultation. - User Base
- Currently has a user base of 70 clinicians.
- 610 distinct patient consent forms with
associated patient information. - Planned to extend the user base to approx 370
clinicians. - HSJ Award
- Application submitted in Jun 08.
- Notified Aug 08 of short listing.
- Mr Lake and Emma Duggan presented to the judges
on 29th Sep. - Understand approx 80 applicants in our category
short listed to 5. - Award ceremony on 1st Dec - winner announced on
the night.
4Ag. 3 - Actions List (PCT)
5Ag. 3 (contd.) Actions List (Acute)
6Ag. 3 (contd.) Actions List (MHP)
7Ag. 3 (contd.) Actions List (ICT)
8Ag. 3 (contd.) Actions List (SHA)
9Ag. 4 ICT Services Strategy (2009-10)
- Aim is to move ahead of (expected?) SHA guidance
on strategy format so that we can provide further
supporting information to FT work. - Trust service plans would be welcomed asap the
Acute Local Plan has already been received. - Attaining FT status necessitates delivering
services within a new operating regime. The
Trust will require a robust and sustainable ICT
framework to support this. The strategy will
reflect this. - The new perception of ICT as a key enabler to
achieving business change and improvement rather
than an end in itself will allow a closer
relationship between service developments and
supporting ICT to be discussed. - The past two years focus has been on
consolidating the infrastructure and systems to
support each Trust but maximize, where possible,
the benefits gained from countywide developments.
The emerging strategy will build on these whilst
recognizing that each trust may have specific
service developments it wishes to explore. - It is anticipated that countywide working will
also fortify the relationship between the Trust
as well as deliver economies of scale for common
services, for example data and voice networking. - Greater attention to delivering against SLAs will
be discussed so as to make these more meaningful
to both commissioner and supplier, setting out
the responsibilities of each party.
10Ag. 5 - ICT Services Report (Operational)
- Full report available in Attachment 2.
- Service Availability
- Networks Server consistently excellent.
11Ag. 5 - ICT Services Report (Operational Contd.)
- Applications
- NCRS reliability has improved but outages still
occurring. - Bluespier downtime (64 hrs) was scheduled.
- Service / Helpdesk Calls
- Application Call
- Calls closed continue to match calls opened.
- Calls opened closed in same month consistently
gt 90 - Call makeup (Sep 08)
- 43 Account set up
- 31 NCRS
- 21 Oasis
- Service Desk
- Sep 08 calls closed (3439) close to calls opened
(3542) (97) - Averaging gt70 calls logged online.
- New service changes include
- Now open 8-6.
- Automated call reference e-mail.
- e-mail notification on call resolution.
- Link to satisfaction survey incorporated in call
resolution.
12Ag. 5 - ICT Services Report (Operational Contd.)
- Provision of Equipment (Quarterly)
13Ag. 5 - ICT Services Report (Operational Contd.)
- Provision of Equipment (Last 3 Months)
14Ag. 5 - ICT Services Report (Projects Contd.)
- (W040) GPSoC (PRIORITY 1).
- An amalgamation of other projects (EPS, GP2GP,
CaB). - Current supplier compliance (detail in Attachment
3) - Level 1 CaB functionality
- Yes EMIS LV, EMIS PCS, InPS Vision3, iSoft
Premiere, iSoft Synergy - No Ascribe Exeter
- Level 2 EPS functionality
- Yes EMIS LV, EMIS PCS, InPS Vision3, iSoft
Premiere, iSoft Synergy - No Ascribe Exeter
- Level 3 GP2GP functionality
- Yes EMIS LV, InPS Vision3
- No EMIS PCS, Ascribe Exeter, iSoft Premiere,
iSoft Synergy - Level 4 hosted solution
- Yes InPS Vision3
- No EMIS PCS, Ascribe Exeter, iSoft Premiere,
iSoft Synergy, EMIS LV - Current local take-up / enabled
- Level 1 63/67 (94)
- Level 2 49/67 (73)
- Level 3 24/67 (36)
15Ag. 5 - ICT Services Report (Projects)
- (W02b) Choose Book (PRIORITY 1)
- System continues to function well.
- Appointment of Director of Delivery (Simon
Hairsnape) duties include revitalising CB
Programme in County. - Stats
- Utilised for 37 Sep 08 (29 in May 08). Target
was 50 by Sep 08. - Referrals
- 2006/7 (11390)
- 2007/8 (26709) Q1(6346), Q2(6477), Q3(7057),
Q4(6829). - Q1(Apr08Jun08) 6017 (216118581998)
- Q2(Jul08-Sep08) 6445 (187518832687)
- (W02c) Electronic Prescription Service (R1
Technical) (PRIORITY 1). - GP Pharmaceutical suppliers slow to get systems
accredited - 65/67 (97) of General Practices are capable of
being made operational. - 2 remaining practices are non accredited Exeter.
(PCS migration planned) - 49/65 (75) are operational.
- 77/89 (87) of pharmacy systems are approved.
- 72/77 (94) of pharmacies live being encouraged
to more. - PCT prescriptions transmitted rate is 4th highest
in SHA. (10K per month)
16Ag. 5 - ICT Services Report (Projects Contd.)
- (W029) GP2GP (PRIORITY 1)
- Good progress
- 20/21 of initial InPS EMIS practices are live
(1 withdrawn). - Further 4/5 practices (InPS) also enabled.
- Remaining deployments on hold as iSoft not
expected to become accredited until 2009. - (W022) NSTS Closure (PRIORITY 1)
- Phase 1 now complete.
- Phases 2 (Secondary Uses Services Reports) 3
(Batch Trace Replacement) work updates awaited
from National Team. - Acute RA Management (sponsorship - not smartcard
issuing) has not functioned well during period of
project a continuing issue that needs to be
addressed. - Guidance received concerning back office
functions for the issuing of new NHS numbers
being discussed through (W045) NHAIS project.
17Ag. 5 - ICT Services Report (Projects Contd.)
- (W045) NHAIS (Exeter) to National Patient
Demographics Service (PDS) Migration Stage 3
(PRIORITY 1) - A technical project to remove the use of
temporary and old-format patient identifier
numbers, and then ensure that FHS staff involved
in patient registration are connected to the PDS - Stage 1 complete (reduce old format / temporary
NHS numbers). - Stage 2 complete (eliminate old format /
temporary NHS numbers). - Stage 3 (direct updating of PDS) awaiting
national products. - (W049) Palliative Care (PRIORITY 1)
- Covers WRH, Alex Hsp, Evesham Hsp, POWCH 3
hospices. - Awaiting notification of contract reset sign off
from SHA. However - Project Brief completed (Attachment 4) and sent
to PCT ICT Steering Group for formal sign off. - IT infrastructure stakeholder list generation
underway. - Go live PID sign off 8 weeks.
- Expected go live 9th Feb 09.
- Followed by Deployment Verification Period (45
days)
18Ag. 5 - ICT Services Report (Projects Contd.)
- (W056) Equitable Access to Primary Care Medical
Services - ICT providing project assurance resource to PCT
project. - 9 Pre Qualification Questionnaire (PQQ)
evaluated. - Invitation to Tender (ITT) short listing 17th
Nov 08. - Final interviews scheduled 24th Nov 08.
- (W055) Map of Medicine Pilot (PRIORITY 1)
- Involves generating a framework to support other
care pathway deployments interested in using MoM
steps to deploy. - MoM supporting County Diabetes Care Pathway
Group. - Various training (reviewer, editing etc.)
completed. - Localisation of national diabetes care pathway
nearing completion. - Discussions on rollout framework for other
pathways commenced. - (W027) Acute Medical Records (PRIORITY 2)
- Preferred supplier identified (Iron Mountain).
- Contract development and processing commenced
financial detail. - TUPE discussions continuing with Gov Actuaries
Dept (GAD).
19Ag. 5 - ICT Services Report (Projects Contd.)
- (W059) Prison Systems (PRIORITY 1)
- Covers new configuration of HMP Hewell
(previously Hewell Grange, Blakenhurst
Brockhill) HMP Long Lartin - Awaiting notification of contract reset sign off
from SHA. However - Project Brief completed (Attachment 5) and sent
to PCT ICT Steering Group for formal sign off. - IT infrastructure stakeholder list generation
underway. - Go live PID sign off 8 weeks.
- Expected go live 27th Jan 09 (Hewell) 10th
Feb 09 (Long Lartin). - Followed by Deployment Verification Period (45
days). - (W03d) Maternity (PRIORITY 2)
- System reviewed 31st Mar 08 considered not fit
for purpose. - Agreement to prioritise on generation of
maternity management reports (for end Dec 08) and
then clinical functionality. - Datasets being directed by Project Executive
(Elaine Newell) and assisted by clinical
informatics. - Interfacing expected end Oct delivery remains a
risk. - Training planned but resourcing remains a risk.
20Ag. 5 - ICT Services Report (Projects Contd.)
- (W037) GP OOH Tender (PRIORITY 2)
- ICT Services both service and ICT project
management components. - (W036) tender project completed Total Care
Network (TCN) preferred supplier. - TCN took over full responsibility for service on
1st Oct 08. - 1st performance stats expected at end Oct 08.
- (W028) Infection Control Management System
(PRIORITY 2) - Go live completed.
- Full handover will complete close Jul 08.
- Lessons Learnt Report (Attachment 6) report
highlights - Benefit of robust and clear service leadership.
- Need for clear scope and defined sign off
criteria. - Services need to prepare themselves for a
significant amount of extra effort during the
project period including duplication of effort
and need to cover for leave of staff involved in
the project. - Appreciation of difficulty in releasing staff for
training and local system configuration which
requires a more realistic and pragmatic set of
time scales to projects (based on ability rather
than arbitrary completion dates).
21Ag. 5 - ICT Services Report (Projects Contd.)
- (W048) Order Results Pilot (PRIORITY 3)
- Pilot to test Anglia system for ordering of
results. c.6-9 months. - 3 General Practices 5 Acute wards.
- Pathology Radiology basic test base.
- User lists and configuration commenced.
- Interfaces being developed.
- Rollout to pilot sites expected late Nov 08
followed by assessment. - (W024) GP Data Capture incl. Diabetic registers)
(PRIORITY 4) - Mechanism for capturing structured information
from GP registers. - Interfaced with diabetic management system.
- Can be extended to other structured GP data.
- 14/67 (24) sites installed of which..
- 6/14 (43) sites live.
- Significant technical issues have arisen review
planned late Oct 08. - (W031) E-consent (PRIORITY 4)
- BT E-Health Insider Awards winner tba 1st Dec
award ceremony. - Closure processes commenced.
22Ag. 5 - ICT Services Report (Projects Contd.)
- (W058) GP Notes Scanning (PCTi Docman) (PRIORITY
4). - Method of supporting general practices to move
paper documentation into clinical system. - 41 (13 of 34) available sites have Docman
(basic) now installed. - 36 (15 of 42) also have Intellisense installed.
This is designed to automatically recognise a
document and the patient it belongs to based on
its content. - 0 of electronic Data Transfer (EDT)
installations completed. This enables practices
to receive documents sent electronically from
participating Acute Trusts directly into Docman. - (W033) Acute Incident Reporting (PRIORITY 4)
- Initiative to increase capture of incidents
reported and enhance subsequent management
processes incl. uptake of recommendations. - Upgrade to existing system (Datix) but involves
significant remapping of processes service /
ICT training. - Desktop equip for pilot (Maternity Radiology)
sites confirmed. - Training plan being developed (potentially
combined with Oasis training) - Intranet Pages (Interfaces) design commenced.
- Datix Web form is configured and a link is now
available.
23Ag. 5 - ICT Services Report (Projects Contd.)
- (W058) Theatres (Alex. Hsp.) (W051) WRH
(PRIORITY 4) - Go live (Alex.) 1st Apr 08 - Reporting tests now
critical for sign off. - Kidd. Hsp. WRH await Alex interfacing (Oct
08). Without this, double entry required.
Generation of user lists and equipment audits
commenced. Change management have commenced. - (W025) Web Publishing (PRIORITY 5)
- Technical refinements continuing. Increasing
frustration for all at lack of ability of
supplier to complete work agreed / provide time
scales for delivery / communicate on progress. - Internets
- Acute live but not FS
- MHP live
- PCT not live (exp Oct08) (outstanding tech
issues - no date issued) - ICT not live (outstanding technical issues - no
date issued) - Intranets
- Acute - not live (exp late Sep08) (outstanding
tech issues-no date issued) - MHP not live (exp early Sep08) (outstanding
tech issues-no date issued) - PCT not live (exp Oct08) (outstanding technical
issues - no date issued) - ICT not live (outstanding technical issues - no
date provided).
24Ag. 5 - ICT Services Report (Projects Contd.)
- (W026) Programme Project Reporting (PRIORITY 5)
- Awaiting review of proposal by Microsoft for best
technical approach. - (W061) MHP / PCT Phone Replacement (PRIORITY 5)
- Project Brief signed off.
- Technical surveys stakeholder list creation
commenced. PCT / MHP placing pressure on
locations to complete initial surveys. - Telephone directories current directories are
not being updated by departments. A new
technical solution will only marginally improve
this situation Trusts should ensure they are
using the existing systems appropriately. - Longer term intention is to interface with
Electronic Staff Record (ESR) during the next
deployment phase (Self Service). This still
requires service to update details. - (W050) Digital Dictation Framework (PRIORITY 5)
- Head Neck / Ophthalmology Rheumatology to
take system and to be used to test framework for
future and ongoing deployments. - End user training commenced.
- Longer term deployment framework being developed.
25Ag. 5 - ICT Services Report (Vacancies)
- Total of 9 Vacancies Open in Directorate
- 1 post awaiting consideration
- CIF007 (Senior Application Support Administrator)
- 2 being advertised
- 1LS019 (IT Desktop Technician)
- CIF008 (Clinical Administrator Assistant)
- 0 interviews scheduled
- 2 Appointments made (positions serving notice)
- KMT006 (Library Informatics Assistant,
Worc/Evesham) - TRA006 (IT Training Officer)
- 4 posts on hold
- 1LS003 (IT Junior Desktop Technician),
- 1LS005 (IT Junior Desktop Technician),
- TRA003 (E Learning Facilitator),
- TRA004 (I T Training Officer)
26Ag. 6 Information Governance
- Laptop Encryption
- Safeboot McAfee encryption software installed
on laptops throughout the county. If not loaded
and access to the network is attempted Safeboot
will automatically download when a laptop next
connects to WHICTS domain. - If a member of staff has not registered their
laptop or themselves and they log onto the
network they will be locked out and unable to use
their laptop. - In the interim, all owners of laptops and other
mobile devices are being asked to ensure that any
sensitive or person identifiable data is stored
on network drives and not transported until the
encryption is complete. - IG Toolkits - The PCT is providing further IG
support and advice to GPs to assist them to
complete their IG Toolkits and Statements of
Compliance. - Worcestershire Information Sharing Protocol - is
to be developed between Worcestershire County
Council and the Worcestershire Local Health
Community. The current Protocol expired in 2003. - Countywide Safe Haven Policy - is to be
developed. This will take into account the
PCT/MHP Telephone Replacement Project. (W061).
27Ag. 6 Information Governance (Contd.)
- Significant IG Related Risks / Issues
- IG01 - Out of Hours RA Support required for
staff who access to CfH compliant applications.
This is exacerbated in the Acute Trust were
issues over RA management arrangements remain. - IG02 - WHICTS IG Related Policies - Many of the
WHICTS IG related policies are out of date and
need renewing. Ruth King has begun to update the
policies, priority being given to Email and
Internet/Intranet Policy. - IG07 IT Hardware Asset Register This is
lacking (particularly around mobile devices such
as laptops and tablets) and is considered a risk.
Each Trust has added this to its risk register.
28Ag. 7 - Monthly Budget Report
29Ag. 8 - Any Other Business
- NCRS Instance Consolidation
- Paper (Attachment 7) explains new thoughts on the
deployment of NCRS. - The strategic direction of travel is to move all
Trusts across the North, Midlands and Eastern
(NME) cluster onto a single shared instance -
coming into effect with the deployment of Lorenzo
Regional Care Release 2. - CSCA would like to reduce the number of instances
they currently have as a medium term strategy. - We would share a patient master index with
Herefordshire but would retain our own facility
IDs. - Ahead of migration we would need to work on our
and those shared duplicates with Herefordshire.
CSCA have agreed that resources would be made
available. - The recommendation is that both the PCT MHP
Trust support this and commence planning towards
a shared instance with Herefordshire.
30Ag. 8 - Any Other Business (Contd.)
- Anticipated Benefits of Proposal
- Early infrastructure refresh - includes a move to
a new data centre. Outages experienced in Jun
Jul 08 were hardware related - application server
blade issues. CSCA indicate that of the 25
Trusts already live in the new data centre, none
have experienced any issues related to
application / blade servers. - CSCA report improved performance, reliability and
stability for the 25 Trusts already on this
infrastructure. - Once migrated, reporting will be processed on a
mirrored database thus removing conflict /
performance implications in production
environments. - Improved monitoring and alerting capability
through use of HP Openview in the new data centre
will help CSCA proactively monitor the hardware. - When planning upgrades/patches, Worcestershire
could share testing scripts with Herefordshire. - Where issues are found, greater leverage to
resolving issues will exist.
31Ag. 8 - Any Other Business (Contd.)
- Potential Dis-benefits of Proposal
- When taking new releases or patches
Worcestershire would need to plan releases dates
and scheduled outages with Herefordshire. - Herefordshire use additional functionality that
Worcestershire dont use e.g. CaB, AE and
interface messaging. If bugs/regression issues
are found during testing by them in relation to
this functionality, that doesnt affect
Worcestershire it would delay the upgrade to the
new release until both parties have approved the
upgrade. - Worcestershire would be encouraged to move to the
shared instance first, which would incur a
downtime of 10 hours. When Hereford moves onto
the shared instance after us, we would also
experience a period of downtime but have been
reassured that it would be about 6 hours. - Worcestershire would need to agree the process
for merging common duplicates with Herefordshire
ahead of Hereford migrating to the shared
instance.
32Ag. 8 - Any Other Business (Contd.)
- Adoption of NHS Number
- Safer Practice Notice (Sep 08) (Attachment 8)
updates letter (May 08) (Attachment 9) from NHS
Medical Director (Sir Bruce Keogh). - By 18 Sep 09, all NHS organisations should
- Use the NHS Number as the national patient
identifier OR the NHS Number as the national
patient identifier in conjunction with a local
hospital numbering system (NB where local
hospital numbers are used they must be used
alongside , not instead of the NHS Number). - Use the NHS Number (and its bar coded equivalent)
in/on all correspondence, notes, patient
wristbands and patient care systems to support
accuracy in identifying patients and linking
records. - Put processes in place to ensure that patients
can know their own NHS Number and are encouraged
to make a note of it (for example through patient
literature that explains the NHS Number, its uses
and advantages, and how patients can use it to
increase safety). - Primary care organisations that have stopped
issuing medical record cards should reinstate
this practice and use it as a means of informing
patients about their NHS Number and encouraging
them to use it where appropriate.
33Ag. 9 Date Time Next Meeting
Schedule
PLUS NEW DATES