FPD DATA QUALITY CHECKING - PowerPoint PPT Presentation

About This Presentation
Title:

FPD DATA QUALITY CHECKING

Description:

Large samples of SD and DPE jet events with gaps, some of which have FPD tracks ... Search for exclusive production in double pomeron exchange ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 4
Provided by: avi116
Learn more at: http://www-hep.uta.edu
Category:
Tags: checking | data | fpd | quality | exclusive | have | to

less

Transcript and Presenter's Notes

Title: FPD DATA QUALITY CHECKING


1
FPD DATA QUALITY CHECKING
  • Forward Proton Detector (FPD)

- a series of momentum spectrometers that make
use of accelerator magnets in conjunction with
position detectors along the beam line
  • Quadrupole Spectrometers
  • surround the beam up, down, in, out
  • use quadrupole magnets (focus beam)
  • Dipole Spectrometer
  • inside the beam ring in the horizontal plane
  • use dipole magnet (bends beam)
  • also shown here separators (bring beams
    together for collisions)

A total of 9 spectrometers composed of 18 Roman
Pots
2
DØ Diffraction
  • Seven Ph.D. students in diffractive group based
    at Fermilab plus two at remote institutions. New
    UTA post-doc Duncan Brown
  • will help coordinate work
  • Analyses in progress on
  • Large samples of SD and DPE jet events with gaps,
    some of which have FPD tracks
  • W/Z gap and/or track (electron and muon
    channels)
  • J/? gap data
  • Elasstic scattering
  • Analyses measure diffractive structure as f(?,t)
    in many channels
  • Search for exclusive production in double pomeron
    exchange
  • Improving trigger capabilites to allow selection
    of double track events in global trigger list
  • Working on halo background reduction
  • Quadrupole detector commissioning

3
Exclusive Dijets in Double Pomeron Exchange
  • Search for events with tagged proton,
    anti-proton, 2 jets, and nothing else
  • REQUIREMENTS
  • Exclusive Monte Carlo (ready)
  • 18 FPD detectors, which are integrated in DØ
    readout,
  • but still in final commissioning stages
    (calibration, alignment, etc.)
  • Dedicated FPD trigger will improve sample
    (currently trigger using
  • gaps) DFE/TM commissioning in progress, need
    trigger database work
  • to overcome exposure group issues
Write a Comment
User Comments (0)
About PowerShow.com