Potential Swiss Army Knife Applications - PowerPoint PPT Presentation

About This Presentation
Title:

Potential Swiss Army Knife Applications

Description:

... LeVan. Jacob Thomas. Darren Shultz. Project Manager: Zachary ... Darren Got in a car... Jake Worked on layout (only 13hrs straight this time) Nick ditto ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 17
Provided by: jac73
Category:

less

Transcript and Presenter's Notes

Title: Potential Swiss Army Knife Applications


1
Group M3 Nick Marwaha Craig LeVan Jacob
Thomas Darren Shultz Project Manager Zachary
Menegakis
DSP 'Swiss Army Knife'
MILESTONE 7 Component Layout
February 28, 2005
Overall Project Objective General Purpose
Digital Signal Processing Chip
2
STATUS
  • Design Proposal (Done)
  • Architecture (Done)
  • Size Estimates/Floorplan/Verilog (95)
  • Gate Level Design (99)
  • Component Layout (Done)
  • Functional Block (50)
  • To Be Done
  • Complete layout of functional blocks
  • Wallace Tree Multiplier, etc.
  • Layout of Adder and div remain
  • Schematic
  • Make remaining adjustments for comb/Wallace
  • Top-level
  • Verification
  • Test adjusted blocks

3
DESIGN DECISIONS
  • Layout
  • Re-did XOR and FA (and others) using M2 to reduce
    size
  • Going to need all four layers for the fp_mult
  • Not a big issue because we dont route over them
  • Wallace Tree Multiplier
  • Fully implemented booth encoding
  • All blocks for wallace tree done to conform to
    aspect ratio

4
MENTAL BREAK
5
OLD WALLACE TREE
6
NEW WALLACE TREE
7
Wallace Tree Mult
8
Booth Encoding PP_Gen
9
TRANSISTOR COUNT
10
LAYOUT UPDATE - FA
11
LAYOUT UPDATE
REG
BOOTH DECODER
12
LAYOUT UPDATE
32 COMPRESSOR
COMPARATOR
13
FLOORPLAN BEFORE
14
FLOORPLAN AFTER
15
UPDATE TEXT VERSION
  • Since Wednesday _at_ 3pm
  • Craig Worked on Booth Recoding and floorplan
  • Darren Got in a car
  • Jake Worked on layout (only 13hrs straight this
    time)
  • Nick ditto

16
PROBLEMS QUESTIONS
  • Booth Recoding
  • Still walking through
  • Problem Timing issues with top level design.
    Havent tackled yet (fixing lower blocks to avoid
    complications)
  • Problem Spring break
  • We want one
  • scientific method only test one variable at a
    time
Write a Comment
User Comments (0)