1
Shutdown Activities
  • Cryostat warm-up
  • Dilute contaminates
  • Use purer helium on cooldown
  • Thermal stress test for cassettes
  • Move cassette from slot 102 to slot 101
  • West cryostat at 6.5K (was 6.3K)
  • East cryostat at 6.1K (was 5.5K)
  • LED pulser upgrades
  • FPS waveguide studies and moves
  • CPS mapping studies
  • Readout Firmware Updates
  • SEQC/SEQ for tick
  • AFE for tick, clockgen, and 1553
  • High rate scanning tests
  • Trigger
  • Hardware upgrades
  • Transition boards
  • Power supplies
  • Firmware upgrades

2
Thermal Stress Test
  • Warmup began 13 Jan
  • Most cassette module heaters started turning on
    about 17 Jan after 1800
  • Cold block temperatures rising at about 0.4K per
    hour
  • Turned off on 19 Jan at about 1800
  • Roughly 38 hours at full heater power of 1.6
    watts per cassette
  • Cold blocks averaged about 322K
  • Isotherms estimated to reach 325K
  • Hybrid assemblies oven cured at 339K
  • 8 fiber plug assemblies cleaned at 308K
  • Polystyrene deformation temp 355K
  • Visual inspection of assembled modules reveals no
    surprises
  • Lost contact with 13 heaters and 2 temp sensors
  • VLPCs remain sensitive to light

3
To Be Studied
  • Continue testing seq scanning
  • Between stores occupancy
  • Split peds
  • Pedestal variation versus tick number
  • Check status of pdaqexamine results
  • Tick
  • Data integrity
  • DB4/5
  • FPD calibration
  • Smoke detectors on platform
  • test and optimize smoke detectors

4
To Be Addressed?
  • Complete installation of DB4/DB5
  • 1A2 download problems
  • New VRBC firmware
  • CPS personality
  • CPS stereo installation
  • CPS axial development/installation
  • LED pulser
  • Additional pulser boards
  • Remote control for 5V power
  • Software enhancements
  • Address coupling between boards
  • CPS link issues
  • Optimize AFE installation
  • Alarms updates
  • Invalid data
  • Individual pixels that suffer from breakdown
  • Crate x53 VRBC replacement

5
To be Addressed?
  • Enclose back of rack PC19
  • Power supply issues
  • PS-2-B/33V readback problem (151969)
  • measure backplane voltages?
  • calibrate Vicor voltage readouts?
  • separate CFTPS from CAL BLS supply swaps
  • AFE cooling enhancements?
  • Double wide air dams for special locations
  • tighten ductwork
  • Air filter retainers?
  • Enhance protection of LVDS cable plant
  • LVDS strain relief?
  • Close-up
  • Verify bayonet installations
  • Verify AFE map and SEQ fibers
  • Replace AFE fan filters