How much or how little audit evidence is needed on an audit file? According to ISA 330: the sufficiency and appropriateness ... Billboards erected on the sites; ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 18
Provided by: MHAM5
Category:

less

Transcript and Presenter's Notes

Title: Quality procedures for ERDF project file management


1
Quality procedures for ERDF project file
management
  • September 2005

2
The processes defined in this document cover
  • Audit Evidence
  • The Audit Trail
  • The project files
  • Background Information
  • Applications and Offer Letters
  • Claims
  • Procurement Publicity
  • Further Information
  • The Finance File
  • Documentation Retention
  • Contact Details

3
Audit Evidence
  • How much or how little audit evidence is needed
    on an audit file?
  • According to ISA 330 the sufficiency and
    appropriateness of audit evidence to support the
    auditors conclusions throughout the audit are a
    matter of professional judgement.
  • Working papers should provide sufficient
    information for an experienced auditor, with no
    previous connection with the project to
  • Understand the nature of the project
  • Confirm that the project complies with the
    approval letter and funding conditions
  • Determine that expenditure is eligible, correctly
    stated and properly incurred.
  • Audit View - If it is not documented (or on the
    file) it has not been done.
  • Perception - If the project file lacks quality,
    the project lacks quality.
  • Clear sequential referencing within each file
    section, and from one part of a file to another
    or if not on the file, clear sign-posting to
    where the evidence is located.

4
The Audit Trail
  • A step-by-step record by which data can be traced
    to its source.
  • Electronic Files the hard copy file should have
    reference to any electronic spreadsheets or
    supporting documentation and where it can be
    found.
  • There may be audit inspection from the EC,
    European Court of Auditors or the Member State.
    The end date for potential audit scrutiny is
    determined by the date at which the Member State
    receives the final payment for the Programme.

Applications
Background Information
Index
Administration File
Procurement Publicity
Claims
Further Information
Summary Position
Evidence of Review
Index
Financial File
Claims
Invoices
5
The Project File

Action / Recommendations
Project Closure Review
6
Key Controls The Project File (audit process)
  • Project set-up allocate responsibility for the
    project files.
  • File owner maintains the file on a regular basis
    ensuring that all necessary documentation is
    included.
  • File is reviewed on a quarterly basis when
    funding claims are being compiled. The file
    should be signed off as reviewed.
  • Add action / recommendations / review points from
    quarterly reviews, GONW audits, project closure
    reviews to file. Clearly document how review
    points have been addressed. It is important to
    retain evidence of review.
  • Project closure reviews should ensure that all
    relevant documentation is on file so that it is
    ready for external review by the European
    Commission (as if they were coming that day).
  • The project file should be fit for audit at any
    point in time.

7
Background Information
  • Project Summary a synopsis of what the project
    is about, including whether outcomes are (have
    been) achieved.
  • Project review details / checklist.
  • A description of relevant internal controls and a
    note to the extent of any audits including cross
    referencing to any reports.
  • An organisation chart to illustrate who is
    involved in the project in terms of delivery,
    reporting and monitoring.
  • Background to the organisation and its
    activities, locations, relevant personnel etc.
  • Business plans or project update reports.
  • Contact Details organisationally and for key
    individuals.
  • If someone were to pick up the file, would they
    be able to tell easily and quickly what the
    project is about?

8
Applications and Offer Letters
  • Applications are all projects supported by
    original, valid ERDF applications?
  • Matched Funding letter confirming matched
    funding.
  • Offer Letters copies of original approvals.
  • Amendments any letters detailing subsequent
    variations.
  • Any other correspondence with grant-paying
    bodies.
  • Details of advances / receipts on account,
    supported by relevant advice notes from the
    grant-paying body where applicable.
  • Bank statements evidencing receipt of grant and
    other income.
  • Do these sections of the file clearly document
    the history of the project approval process
    detailing any amendments and receipt of funding?

9
Grant Claims
  • For each claim there should be a statement by the
    claim signatory or delegate that they have
    reviewed the claim and working papers. That they
    are satisfied it has been accurately prepared and
    all entries are properly supported.
  • Cross referencing of each cell on the claim or
    return to the relevant working papers on the
    Finance File.
  • Are the claims cross referenced to the relevant
    part of the Project File or section in the
    Finance File?

10
Procurement
  • Evidence that contracts, where applicable, have
    been let in accordance with EU Directives (93/37
    EEC and 92/50 EEC)
  • Contracts should be advertised in the Official
    Journal of the European Union (OJEU) where the
    contract sum demands it
  • Justification of the method of procurement
    adopted
  • Documentation supporting all the stages of the
    procurement process, evidencing that it has been
    let fairly and competitively
  • The final assessment details should be included
    and any reason for not accepting the lowest bid
    should be fully recorded
  • There are thresholds for which the advertising
    for tenders is necessary. The value of the
    thresholds are revised every two years. The next
    revision will be 1 January 2006.
  • Currently the thresholds are as follows
    (excluding VAT)
  • Supplies and Services 153,376
  • Works 3,834,411

11
Procurement (continued)
  • Contracts should not be split up to keep each
    below the threshold for advertising.
  • Examples of evidence that should be retained
  • Documents advertising the call for tenders
  • Minutes of meetings to open bids
  • Selection criteria
  • Justification of the choice of contractor
  • Exchange of correspondence offering and
    accepting
  • Contracts.

12
Publicity
  • The file should include evidence to show that the
    EU Publicity Directive (94/342/EC) has been
    complied with.
  • The intention is to increase public awareness and
    transparency of EC action. Such material should
    be appropriately disseminated and made available
    to interested parties.
  • Information and publicity measures should include
    the following
  • In the case of infrastructure investments
  • Billboards erected on the sites
  • Permanent commemorative plaques for
    infrastructures accessible to the general public.
  • In the case of productive investments and
    measures to develop local potential and
    employment
  • Measures to make potential beneficiaries and the
    general public aware of European Community
    assistance
  • Measures making the general public aware of the
    role played by the EC, for example, informing the
    media and publications such as brochures and
    pamphlets.

13
Further Information
  • Publicity Strategy (ensures consistency).
  • Update reports and correspondence.
  • Project outputs details of the system in place
    for recording project outputs and confirmation of
    declared achievements.
  • Evidence of monitoring and review (reviews should
    be timely, well communicated and clearly
    documented).
  • Audit reports.
  • Details of action taken in response to reviews or
    audit.
  • Emails should be treated like any other document.
    If they are significant to the project, they
    should be retained in the file.

14
The Finance File
  • Notes on the basis of any apportionments e.g.
    overheads or management time. Supported by an
    appropriate rationale and evidence of it being
    consistently applied.
  • A comparison of expenditure with approvals,
    including an explanation for any significant
    variances.
  • Summary position - a reconciliation of income and
    expenditure figures in the claim or return to
    working papers and account codes.
  • Copies of each quarterly claim.
  • Copies of supporting documentation for all items
    of expenditure (if not originals / certified
    copies, then details of where original documents
    are held should be included).
  • Expenditure and activity dates should be within
    the project period.
  • Expenditure should be committed before the end of
    the project period.
  • Include evidence to show where ineligible spend
    has been excluded.
  • Where possible original invoices should be
    retained on file

15
Document Retention

Storage on site (Office for 2 years)
Closure Reviewed
Project Administration Finance Files
Hard Copy files
Electronic copies
Electronic Archive
Network
16
Document Retention
  • After project completion the Project and Finance
    files will be reviewed by the Project Closure
    Review Team.
  • Hard Copy files should be stored as follows
  • On-site in a local office for at least 2 years
    then archived so that they are retained for at
    least 3 years after the final payment on the
    Programme by the Commission
  • Electronic copies (including e-mails) to be
    transferred to a file location on the network.
    The network should be backed up regularly
  • Written instruction should be received for and
    file / document destruction after the required
    file retention period has lapsed.
  • A failure to provide all relevant documentation
    for audit inspection could result in a
    requirement to repay grant

17
  • Contact Details
  • Heather Hancock, Partner
  • Direct 0113 292 1621
  • Mobile 07740 178521
  • Email hhancock_at_deloitte.co.uk
  • Glenn McCauley, Senior Manager
  • Direct 0113 292 1626
  • Mobile 07799 476824
  • Email gmccauley_at_deloitte.co.uk
  • Richard Moore, Senior Consultant
  • Direct 0191 202 5278
  • Mobile 07917 233125
  • Email rimoore_at_deloitte.co.uk
Write a Comment
User Comments (0)
About PowerShow.com