OO Muon reconstruction in CMS - PowerPoint PPT Presentation

About This Presentation
Title:

OO Muon reconstruction in CMS

Description:

present in very few channels (1- 2/ chambers and ... 0 ns between staggered cell i.e emulates normal tracks in the middle of each semi-cell. ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 8
Provided by: ugs
Category:

less

Transcript and Presenter's Notes

Title: OO Muon reconstruction in CMS


1
  • Investigation of the 40 MHz structure
  • with Test Pulse runs
  • Problem 40 MHz structure
  • Before the time boxes
  • present in very few channels (1- 2/ chambers and
  • topologically located in the minicrate in
    specific area)
  • just a front of the clock is picked-up. Sensitive
    on grounding
  • and threshold .
  • on the Time-boxes
  • The structure is present and known
  • since TB2003 (first assembled Mini-crate) -
    Micheal-
  • 1 effect). Was present in legnaro, in TB 2004 ,
    in SX5
  • is almost uniform in all channels , SL,
    chambers.
  • indipendent on scintillator/autotrigger L1A.
  • indipendent on threshold. No quantified
    inefficiency
  • and no quantified extra hits.
  • TDC problems?
  • Check with TP in legnaro

2

TP signals flow of command with TP In the
tests, TP was generated within 0 ns between
staggered cell i.e emulates normal tracks in the
middle of each semi-cell . Only cells in one
semi-column per TRB were pulsed ( cell 9, 25,
41,57) each event. 66 runs were performed
changing the delay between the clock and the
pulse of TP 10000 events per run read-out. The
L1A was sent at a fix bx from the orbit. No check
on the autotrigger was performed.
3
  • TP generated with the orbit signal,
  • 1chan/SL/ROB pulsed
  • Same delay respect clock in all pulsed channels
  • Delay shifted of 4 delay-steps i.e 640 ps
  • per run.The accuracy
  • Of the delay step is of 20 ps ( castellani )
  • 65 runs analysed
  • (10000 events each run but run 9th has only
  • 4180 events and probably the delay was
  • not changed..)
  • NB the event has always the same
  • BX number ,ie, is just the first event
  • read out
  • after the TDC reset.

All channels 1 run
One channel 1 run
MEAN TP value
Tdc count
4
SL 3 for the 4 channels MEAN TP value as a
function of delay
TDC units
TDC units
Dt 25ns
delay ( unit .85 ADC count.65-0.08 ns
5
TDC units
Dt 25ns
delay ( unit .85 ADC count.66 ns
6
SL 3 for the 4 channels occupancy
and
RMS
TDC units
delay ( unit .85 ADC count.66-.08 ns
7
conclusion
  • The TP seems to be digitized almost always with
    the
  • same value by the TDC.
  • checking le mean value of 10000 events per delay
    point
  • there is a 25 ns nonlinearity. Not clear for me
    if that is due
  • to a mismatching of the delay-time step to the
    ADC count
  • or if that is due exactly to a intrinsic TDC
    output non linearity
  • results
Write a Comment
User Comments (0)
About PowerShow.com