Title: West Orange Airport Authority
1West Orange Airport Authority
- An Independent Special District
2WOAA Mission
- Build a new public use airport in West Orange
County region
3Previous Approved Funding
- OCC previously approved 155,000
- None Spent
- Revised Reduced Request 65,000
4Use of Requested Funds
- 15,000 Economic Impact Analysis by Fishkind
and Associates - 50,000 FAA Airport Feasibility Site Location
Study by ZHA
5Economic Engine Florida Aviation System Plan
Report 2025-FDOT
- Airports and Aviation services play a critical
role in Floridas economic and community
development. - Airports are engines of business growth and job
creation.
6NeedFlorida Aviation System Plan (FASP)
Central Florida Demand/Capacity Study - 2004
- Based upon projections on demand at the
congested airports, it appears that there is a
need for a new airport in the region, even if all
the committed and potential capacity enhancing
projects are undertaken.
7Benefits of Airport
- Economic engine to community
- Attracts quality businesses that need access to
airport - Provides base for emergency services and police
aircraft - Increases surrounding property values and real
property tax base - Provides large open space
8Benefit - Provides transportation for local
community SATS NASA/FAAs Small Aircraft
Transportation System Future of air travel is
use of new SATS advanced quiet small 4-seat
aircraft flying from small local airports point
to point, on-demand air taxi, for coach level
fares.
9SATS Aircraft Public Air Taxi for Community
10SATS Airport NASA/FAA Graphic
11Requirements to Proceed
- FAA Requires Airport Feasibility Study to study
need and locate multiple suitable airport sites
that meets technical FAA criteria - Study is required to apply for Federal funding
for airport
12REQUEST for FUNDING
- 65,000
- Economic Impact Study
- FAA Airport Feasibility Study identifying airport
sites