Title: Middle School Facility Expansion
1Middle School Facility Expansion
2Boulder Country Day Mission Statement
-
- Our mission at Boulder Country Day School is to
provide a well-rounded, classical education of
academic excellence and social development in a
safe environment, where students are motivated
and inspired to become lifelong learners and
productive, responsible citizens.
3Strategic Plan Goals Objectives
- Elevate the School Experience
- Foster a Flourishing Faculty
- Engage the Entire Community
- Grow Our Family of Families
- Optimize School Operations
- Enhance and Expand Our Campus
4Evaluated Potential of Three Expansion Options
- Purchase the acreage west of the campus
- Purchase the building adjacent to the campus
- Pop the Top on the existing building
5Pop the Top Best Direction
- Supports our current academic program and mission
- Potential to increase revenue
- Manages time constraint of approved site plan
- Addresses all six Strategic Plan areas
6Expected Benefits
- Will allow for higher enrollment
- Will support the total academic program
- Will enhance student life (across entire BCD
community) - Will build on faculty satisfaction, recruitment
and retention - Will improve science, math and technology
curriculum
7Plan Development
- Schematic plans, preliminary budget.
- Input solicited by board, faculty, staff, parent
body (Pop Talks). - Per input, plans modified, scope expanded.
- HOS, MS Director recommend 6th - 8th grade
expanded MS.
8Construction Schedule
- June 1, 2009 Begin construction.
- Aug 31, 2009 Dried-in (walls up, windows in,
ext. doors in, roof on.) - December 1, 2009 C.O., punch list, move-in.
- January 4, 2009 Occupancy.
9Permit Process
- November 2008
- Permit application submitted to City.
- January 2009
- Comments on permit app. received from City.
- City requires Minor Modification of Plat.
- April 16, 2009
- Minor Modification granted.
- New Minor Amendment needed for temp.
classrooms/ofc - April 24, 2009
- Permit re-submittal expected by April 24.
10Temporary Accommodations
- Modular classroom and office units placed in the
field east of the PS playground. - 6 classrooms, 2 offices and 1 flex room
- Classrooms are 720 square feet (100 sf larger
than existing) - Classrooms can accommodate 30 students
- Fully heated and cooled.
- No bathrooms.
- Rental agreement needed to reserve units and to
proceed with Minor Amendment application.
11The Team
- Project architect - Railton McEvoy.
- Phil McEvoy designed existing BCD campus and
remodels. - General contractor - Wyatt Construction.
- Wyatt Construction built BCDs Nautilus campus in
1998. - General counsel - Faegre Benson.
- Project mgr/Owners rep - Doug DaPuzzo.
12Design Philosophy
- Building designed to be versatile and adaptable
for future uses. - Technology infrastructure designed to scalable
and flexible for future technological needs. - Science suite is envisioned to be a cornerstone
of the new facility. - ADA compliant.
- Will endeavor to be green where it is cost
efficient and budget responsible.
13MS Enhancements Form/Function (part 1)
FORM FUNCTION
8,309 additional SF (133 incr.) Existing MS - 6,251 sf (1 story) Proposed MS - 14,450 sf (2 story)
Additional potential enrollment of 36 students Current Max MS 108 18 per class x 2 classes x 3 grades (6-8) Proposed Max MS 144 16 per class x 3 classes x 3 grades (6-8) Broader, more diverse social opportunities. More athletic opportunities Enables expanded/enhanced academic offerings. Increased potential revenue more/better-paid staff/faculty
2 dedicated Science Classrooms. 2 concurrent science classes.
Dedicated MS science lab. Dedicated ES science lab. Enhanced science program.
Flexible, scalable technology infrastructure enhancements. Adaptable to future technology needs.
14MS Enhancements Form/Function (part 2)
FORM FUNCTION
A dedicated activity / lunch room. Eliminates conflict between shared lunch use and classroom use. Enhances student life.
An enhanced faculty lounge w/ shower. Attract/maint. quality faculty/staff.
2 additional staff offices. Attract/maint. quality faculty/staff. Allows for additional staff IB Coordinator New staff member New staff roles (ie guidance).
A roof deck adjacent to the activity room and faculty lounge. Attract/maint. quality faculty/staff. Enhances student life. Enhances academic experience - allows for outdoor projects.
15MS Enhancements Form/Function (part 3)
FORM FUNCTION
A dedicated student lounge Envisioned to be used by students on a merit system. Encourages student achievement. Enhances student life.
Significantly increased storage Attract/maint. quality faculty/staff.
3 other new classrooms, 2 of which are separated by a retractable wall and can be combined into a large group instruction room. Each teacher will have his/her own classroom (no more shared classrooms). Provides large group instruction room. Elevates academic experience. Enhances student life. Attract/maint. quality faculty/staff.
Building is versatile and adaptable. Can implement changes over time and adapt to future uses. Can add students/faculty over time.
16Does this project fulfill Strategic Plan?
- Elevate the School Experience
- Expanded, more diverse social/athletic/academic
offerings, dedicated classrooms, science suite,
enhanced classroom technology, student lounge,
dedicated activity room w/roof deck, - Foster a Flourishing Faculty
- Individual classrooms, faculty lounge w/roof deck
private offices, increased potential revenue, - Engage the Entire Community
- All families and students can look forward to an
elevated MS experience, - Grow Our Family of Families
- 36 addtl potential students,
- Optimize School Operations
- Increased technology, increased storage,
increased potential revenue, - Enhance and Expand Our Campus
- 8,309 addtl SF, 36 addtl potential students,
17Does this project fulfill Expected Benefits?
- Will allow for higher enrollment
- 8,309 addtl SF, 36 addtl potential students,
- Will support the total academic program
- Increased technology, enhanced science suite,
expanded and more diverse academic offerings.
increased revenue potential, - Will enhance student life (across entire BCD
community) - Expanded and more diverse social/athletic/academic
offerings, enhanced classroom technology,
student lounge, dedicated activity room w/roof
deck, dedicated science lab for Elementary
School, - Will build on faculty satisfaction, recruitment
and retention - Individual classrooms, faculty lounge w/roof deck
private offices, - Will improve science, math and technology
curriculum - Dedicated classrooms, new science suite, enhanced
classroom technology,
18Proposed Construction Contract
- Guaranteed Maximum Price.
- Fixed cost to BCD based on current plans/specs.
- Wyatt Construction receives a fixed fee for
construction management /supervision. - WC fees paid at end of the job.
- WC gets a non-refundable GMP fee.
- Cost savings go to BCD.
- AIA standard contract form.
19Financial Picture
- The cost of the project is estimated at 1.8MM
- Construction 1,365,000
- GMP Fee 35,000
- BCD Contingency (2.5) 35,000
- FFE 110,000
- Technology Infrastructure 20,000
- Prof. Fees (arch, eng, legal) 80,000
- Temporary Classrooms/Offices 80,000
- Reserve (held by EC) 75,000
- Total 1,800,000