TransPAC Upgrade - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

TransPAC Upgrade

Description:

... to StarLight/TransLight, and another will be terminated in the west coast of USA. Production level of services as well as Experiments should be provided over the ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 8
Provided by: KON111
Category:

less

Transcript and Presenter's Notes

Title: TransPAC Upgrade


1
TransPAC Upgrade Projects
  • 2003.9.25
  • Kazunori Konishi
  • (APAN-JP)

2
TransPAC Upgrade (2.5 Gbps x 2)in 2003.10-11
Abilene/LaLaLAN
KDDI Ohtemachi
Manchester
Maruyama
Moro Bay
Shima
KDDI LA
StarLight/TransLight
Japan-USCable
Tokyo ---- LaLaLAN Protected (2003.10.1)
2.5G SONET Production Tokyo ---- StarLight
Unprotected, but Non-Preemptive (2003.11.1?)
2 x GbE (TransLight, Layer 2 connections
to EU Experiment

3
TransPAC Links in 2004
  • 2 x 10 Gbps lambdas between USA and JP will be
    installed maybe in August.
  • One lambda will be connected to
    StarLight/TransLight, and another will be
    terminated in the west coast of USA.
  • Production level of services as well as
    Experiments should be provided over the links.

4
TransPAC Projects
  • Cant be executed over the commercial ISP.
  • Can be lead by Asian folks, in case the projects
    have Asian colors scalability, unique products,
    environments and culture/heritage.
  • Will be biased toward Grid projects.
  • Can be easily extended to other users, because IU
    is operating major research networks in USA.
  • Should be highly evaluated by US citizen.

5
NSFs Experimental Networks
NSFs New Program
Technology Penetration
Lambda Grids
6
Types of Networks TransPAC2
TransPAC2 will cover both!
Support e-Science Applications
TransPAC is here
7
References
  • TBA
Write a Comment
User Comments (0)
About PowerShow.com