Ethics Its My Job - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Ethics Its My Job

Description:

QC Requirements: Blank, LCS, matrix spike, matrix spike duplicate. Spikes. Hot Block ... Post Digest Spike. Analyze post digestion spike. Note 7. Lab limits; ... – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 18
Provided by: roc893
Category:
Tags: com | ethics | job | spike

less

Transcript and Presenter's Notes

Title: Ethics Its My Job


1
Ethics Its My Job
  • Metals
  • 12/13/06

2
(No Transcript)
3
Metals Chemists
  • Instruments
  • William Boyd, MS
  • Vaughn Machristie
  • Alvin Hawkins
  • Preparations
  • Perry Davis
  • Todd Senior
  • Night Weekend Crew
  • Ricky Boyd
  • Tameka Loyd
  • Lindsay Metzger

4
Testing
  • Type of samples
  • Drinking water
  • Waste water
  • Sludge
  • Soil
  • Tests Run
  • 747s (EPA 245.1)
  • 301s (EPA 200.2)
  • TKN (EPA 351.2)
  • SUVAs
  • SAR (EPA 600/2-78-054)
  • DMF (EPA SM 3030 B)
  • CR6 (SM 3500-Cr B)

5
Why We Test
  • Listed as primary pollutants
  • Some metals can be toxic if ingested

6
A Walk Through 301L
  • Prep Procedure
  • 301L 30TS / Acid Digestion to Prepare Aqueous
    Samples for Metals Analysis, Rev.05
  • Performed by trained personnel
  • HNO3 preserved
  • 50 mL of sample in digestion tube
  • Specified amount of Spiking solution
  • 0.5 mL of HNO3
  • 0.5 mL of HCl
  • Cover
  • Place in hot block (95C 2 ) for 245
  • QC Requirements Blank, LCS, matrix spike, matrix
    spike duplicate

7
Spikes
8
Hot Block
9
Sample Digestion
  • Let samples cool
  • Bring sample to volume (50mL) with water
  • Enter data into LDS
  • Label tubes with sample number, bottle number,
    date, technician, digestion method
  • Label caps with elements to run
  • Take to instrument room for metal analysis

10
Benchsheets - traceability
11
Mass Spectrometer
12
Starting Machine
  • Light Argon Torch
  • Perform HP tune
  • Make daily standards for Calibration Curve
  • Change Rinse water
  • Enter Data into daily Maintenance Log
  • Change tubing
  • Clean glassware
  • Clean Cones

13
QC on MS
  • Daily Calibration Curve
  • Blank
  • ICV
  • CCV
  • 100, 200, 300 ppb Standards
  • ICS A B
  • FRB
  • CCB
  • AWRL
  • IS

14
Typical Run on MS
15
At the Computer
  • Anomalies
  • QC
  • Compliance
  • Limits

16
No Room for Error
  • Total Honesty
  • Correct temperature
  • Client limits
  • Reagent reliability
  • Precision and Accuracy
  • Parts per Billion
  • Spiking amounts
  • Pipette calibration
  • Proper volumetric measurements

17
Metals
  • Were a Great Team!
Write a Comment
User Comments (0)
About PowerShow.com