Presentation to: Name: Date: - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Presentation to: Name: Date:

Description:

Name: Date: ICAO Asia-Pacific AMHS Activities & Status. ATS Message Handling System (AMHS ) ... AIDC, BUFR, AMHS Routing ICD, Network Protocol Compatibility ... – PowerPoint PPT presentation

Number of Views:104
Avg rating:3.0/5.0
Slides: 18
Provided by: vicp
Category:

less

Transcript and Presenter's Notes

Title: Presentation to: Name: Date:


1
ICAO Asia-Pacific AMHS Activities
Status ATS Message Handling System (AMHS
)Implementation Workshop Chennai,
IndiaDecember 15-16, 2008
Presentation toNameDate
Report From APANPIRG Aeronautical
Telecommunication Network Implementation
Co-Ordination Group (ATNICG)
2
Our Vision Service and Safety
Presentation Overview
  • ATNICG Background
  • ATNICG Activities
  • ATNICG Status
  • Conclusions and Decisions
  • Tasks Activities and Status

3
Our Vision Service and Safety
Presentation Overview
  • Aeronautical Telecommunication Network (ATN) Task
    Force (TF) concluded its final meeting in 2005
    adopting all recommendations of the TF and all of
    its AMHS implementation documents developed for
    the Asia/Pacific region to replace its aging AFTN
    infrastructure
  • APANPIRG CNS/MET Sub-Group and APANPIRG adopted
    the TF recommendation
  • APANPIRG also established the ATNICG in 2006 to
    facilitate the AMHS transition
  • ATNICG held its first meeting in Seoul, Republic
    of Korea in 2006 and its second meeting in Hong
    Kong, China in 2007

4
Asia/Pacific ICG Activities
  • Coordinate AMHS implementation and transitional
    issues in the Asia and Pacific Region and address
    relevant system management, operational
    procedures and emerging issues.
  • The Group is composed of experts nominated by
  • Australia, China, Hong Kong, Fiji, India,
    Indonesia, Japan, New Zealand, Republic of Korea,
    Singapore, Thailand and United States.
  • The Group presented its report to APANPIRG
    through the CNS/MET Sub-group.

5
Our Vision Service and Safety
ATNICG Tasks
  1. ATN Implementation Coordination
  2. ATN Operational Procedures
  3. ATN Certification Validation Process
  4. ATN Documentation
  5. ATN Performance
  6. ATN Service Enhancements
  7. Security

6
Our Vision Service and Safety
ATNICG Tasks
  • ATN Implementation Coordination
  • Review of implementation problems and develop
    coordinated solutions
  • Review States ATN/AMHS Implementation/Operational
    activities and issues (member States are
    expected to provide their latest implementation
    status)
  • ATN/AMHS Implementation Planning Status
  • Importance of Specifying Design Capacity and
    Loading/Stress Testing of AMHS
  • Use of Internet for ATN/AMHS Functional and
    Interoperability Testing

7
Our Vision Service and Safety
ATNICG Tasks
  • ATN Operational Procedures
  • Develop Interim Database for Directory Services
  • Develop operational database management
    procedures
  • Pre-Operational Testing Procedures
  • Update of EUR AMHS Manual related to AMHS
    Conformance Testing
  • Draft Conclusion 2/1 - Guidance Document for AMHS
    Conformance Testing

8
Our Vision Service and Safety
ATNICG Tasks
  • ATN Certification Validation Process
  • Develop conformance procedures and checklist for
    AMHS and ATN routers
  • Develop validation process document

8
9
Our Vision Service and Safety
ATNICG Tasks
  • ATN CONFORMANCE DOCUMENT AND CHECKLIST
  • Describes the standard checklist required to
    ensure interconnectivity and interoperability.
    The document was adapted with a baseline from the
    Eurocontrol Conformance Document. The adaptation
    of the Eurocontrol Manual focuses on the use of
    AMHS with an additional ATN router testing
    procedure which was developed based on the router
    testing and trials conducted between Hong Kong
    China and Japan.
  • The ATN Conformance Document will cover the
    system level testing for AMHS and ATN router
    necessary for interoperability and
    interconnectivity as an initial step based on
    existing technical provisions. Technologies such
    as the adoption of Internet Protocol (IP) are
    proposed to be addressed in later revisions. The
    structure of the documenst would be as follows
  • AMHS Conformance Document
  • Annex A - Guidelines on Quality of Service (QOS)
  • Annex B - AMHS Conformance Test and Checklist
  • Annex C ATN Router Test and Checklist

9
10
Our Vision Service and Safety
ATNICG Tasks
  • ATN Documentation
  • Study DIR objects/attributes proposed in ACP and
    follow development within other groups
  • Develop AIDC documentation (including ICD) and
    follow development within other groups
  • Update AMHS ICD to comply with SARPs

10
11
Our Vision Service and Safety
ATNICG Tasks
  • ATN Performance
  • Develop/establish/adapt/monitor/identify/analyze
    performance indicators

11
12
Our Vision Service and Safety
ATNICG Tasks
  • ATN Service Enhancements
  • Review the impact of the implementation of
    Directory Services in the Region
  • Development of profiles for the directory access
    and exchange protocols (Ref. Decision 7/9)
  • Study the use of IP
  • Consider related ICAO standards (e.g. 9880) to
    compliment ICAO Doc. 9705 to adopt IP. Meanwhile,
    effort within major hubs in Asia/Pac region (e.g.
    Singapore, Thailand, Pakistan, India, etc) to
    interface with European and other regions using
    IP will be utilized.
  • Study and analyze for transition to BUFR code
  • Study and analyze for transition of AFTN-based
    AIDC to ATN environment

13
Our Vision Service and Safety
ATNICG Tasks
  • Discuss issues related to Directory Service -
    AMHS Address Management
  • AMC Coordination meeting
  • ASIA/PAC Interim AMHS Address Management Database
  • Using European AMC Database in the short term
  • Decision 2/2 - Using European AMC service through
    focal point
  • ATSMHS Coordination and Management Center

14
Our Vision Service and Safety
ATNICG Tasks
  • Security
  • Task (1) Update System Integrity Policy as
    needed
  • Asia/Pacific ATN AMHS System Integrity Policy
    Document
  • Task (2) Develop Information Security Checklist
  • Asia/Pacific ATN AMHS Develop Security Checklist
  • Task (3) Develop Information Security Guidance
  • Asia/Pacific ATN AMHS System Integrity Guidance
  • Task (4) Develop Information Security Solution
    for Initial and Enhanced Services
  • Asia/Pacific ATN AMHS Security Implementation Plan

15
Our Vision Service and Safety
Conclusions and Decisions
  • Draft Conclusion 2/1 - Guidance Document for AMHS
    Conformance Testing
  • Decision 2/2 - Use of European AMC service
    through focal point
  • Decision 2/3 - Analyze common address prefix
  • Draft Conclusion 2/4 - ATN/AMHS Implementation
    Workshop
  • Draft Conclusion 2/5 - Amendment to AMHS ICD
  • Draft Decision 2/6 - Revision to the
    Subject/Tasks List of ATNICG

16
Our Vision Service and Safety
Establishment of ATNICG Working Group
  • The ATNICG WG has been established to address
    specific technical and operational issues with
    Subject Matter Expert (SME)
  • The ATNICG WG has held two meetings since 2006
  • Most of its work is coordinated though email and
    the Web server hosted by Asia/Pac Regional Office

17
ATNICG Working Group Activities
  • Seven tasks and tracking each tasks as follows
  • PERFORMANCE OBJECTIVE
  • AIDC, BUFR, AMHS Routing ICD, Network Protocol
    Compatibility
  • Test Procedure, Operational Procedure
  • Tasks/Strategy
  • Benefits
  • Deliverables
  • Target Date
  • Lead and supporting Members for each assigned
    task
  • ATNICG WG Update
Write a Comment
User Comments (0)
About PowerShow.com