Title: Proposal Submission and Other RFP Provisions


1
Proposal Submission and Other RFP Provisions
2
Proposal Submission (SF 33 and L.1)
  • Proposals are due NLT 200 PM (EDT) on 7 April
    2008.
  • Submit Offers to
  • Unclassified
  • US Army TACOM LCMC
  • Acquisition Center E-Mail
  • Attn AMSTA-AQ-DE / Bid Opening
  • Warren MI 48397-5000
  • Classified See L.1.1
  • US Army TACOM LCMC JLTV Project Security
    Manager, G2
  • Mail Stop 105
  • 6501 East 11 Mile Rd
  • Warren MI 48397-5000
  • Handcarried Offers - See L-16 for unclassified.
  • Electronic (CDROM) submission required.

3
Proposal Submission Requirements (L.1)
  • Do NOT submit Classified information by
    unclassified means. Improper submission of
    classified material may be cause for rejection of
    an offer or a negative responsibility
    consideration.
  • DD Form 254 on website. Security Class Guide
    (SCG) provided with material.

4
Proposal Volumes (L.1)
  • Five Volumes Required
  • Technical, Logistics Commonality, Past
    Performance/Small Business Participation, Cost,
    Proposal Terms and Conditions
  • Each Volume may span multiple CDs.
  • 5 Identical sets required (2 for Proposal Terms
    and Conditions)
  • Executive Summary/Transmittal Letter optional
  • Organization, marking, TOC, Sec L/Proposal Cross
    Reference and other requirements at L.1

5
Proposal Terms and Conditions (L.8)
  • Signed copy of SF33
  • Fill-ins for Sections B and K
  • Statement specifying agreement or taking
    exception with all terms, conditions and
    provisions of solicitation
  • Exceptions may be grounds for Grants/Contracting
    Officer to reject the proposal from further
    consideration in the source selection process,
    before initial evaluation
  • JCP and facility clearance information
  • Identification and Assertion of Use, Release, or
    Disclosure Restrictions (252.227-7017)
  • Compliance with EVMS and identification of
    subcontractors selected for application of EVMS
    criteria (252.242-7001)

6
Alternate Proposals (L.3)
  • Alternate approaches to meeting requirements.
  • Multiple submissions.
  • Each submission must be complete and stand alone.
  • Offeror eligible for only one award.

7
Section B
  • Fill-in proposed amounts for CLINs 0001 and 0003.
    (CLIN 0002 Not Separately Priced)
  • Fill-in Funding Schedule B.3.2
  • The Government estimates that each TD contract
    will cost approximately 55-60M.  Funds are not
    presently available for this contract.  See FAR
    52.232-18.  Subject to availability, a total of
    approximately 37M (total) will be funded this
    fiscal year. Of the balance, approximately 73 of
    the balance is expected to be available in FY09
    and the remaining 27 in FY10.  JLTV Website -
    5 Feb

8
Miscellaneous
  • Days As used in the solicitation, the number of
    days refers to calendar days. Methods of
    establishing events other than calendar days may
    be incorporated prior to award of contracts.
  • COR We anticipate that Contracting Officers
    Representatives (COR) will be appointed to
    provide clarification/guidance and technical
    direction within the scope of the contract and
    accept contract deliverables.

9
Solicitation Attachments
  • The following are only for the solicitation and
    will not be included in the contracts
  • Attachment 0024 INTEGRATED SYSTEM MATURITY LEVELS
  • Attachment 0025 PERFORMANCE DATA SHEETS
  • Attachment 0026 COMPLIANCE MATRIX
  • Attachment 0027 COMMONALITY MATRIX
  • Attachment 0028 FAILURE DEFINITION AND SCORING
    CRITERIA
  • Attachment 0029 PAST PERFORMANCE QUESTIONNAIRE

10
CDRL (Exhibit A)
  • 56 Data requirements.
  • Submitted to Advanced Collaborative Environment
    (ACE).
  • Markings IAW DFAR 252.227-7013.
  • Distribution statements provided prior to
    submission.

11
Model Contract
  • Prior to close of discussions and request for
    Final Proposal Revisions
  • Model contracts will be prepared for each offeror
  • Tailored as necessary to incorporate
    offeror-specific items
  • (i.e.objective performance per M.4.1.2.7,
    differences in size, subcontracting plan, data
    rights)
  • Following discussions
  • Offeror will submit a signed model contract to
    the Government as part of their final proposal
    revision.
  • If the offer is selected for award, model
    contract will be signed by the Government and
    becomes the Contract.

12
Proposal Submission and Other RFP Provisions
13
Contract Exhibits/Attachments
  • Exhibit A CONTRACT DATA REQUIREMENTS LIST
  • Attachment 0001 JLTV PURCHASE DESCRIPTION (PD)
  • Attachment 0002 GOVERNMENT INTEGRATED MASTER PLAN
    (IMP)
  • Attachment 0003 ADVANCED COLLABORATIVE
    ENVIRONMENT (ACE)
  • Attachment 0004 RESERVED
  • Attachment 0005 COST AND SOFTWARE DATA REPORTING
    (CSDR) PLAN
  • Attachment 0006 WBS DICTIONARY
  • Attachment 0007 JLTV RISK PROBABILITY AND
    CONSEQUENCE SCREENING CRITERIA
  • Attachment 0008 RISK TRACKING REPORT
  • Attachment 0009 GOVERNMENT SYSTEMS ENGINEERING
    PLAN (SEP) (FOUO)
  • Attachment 0010 SYSTEM/DESIGN TRADE STUDY REPORT
  • Attachment 0011 SIMULATION BASED DESIGN MODEL
    DATA
  • Attachment 0012 CONCEPTUAL/TECHNOLOGY DEVELOPMENT
    DESIGN DRAWINGS/MODELS TECHNICAL DATA
  • Attachment 0013 FUTURE C4ISR/EW GROWTH
    INFORMATION
  • Attachment 0014 CRASH WORTHINESS DATA SHEETS
  • Attachment 0015 VEHICLE PROPULSION DATA SHEETS
    (FOUO)
  • Attachment 0016 MOBILITY/DYNAMICS ANALYSIS INPUT
    DATA
  • Attachment 0017 ARMY MOBILITY EVALUATION PACKAGE
    DATA SHEETS (FOUO)
  • Attachment 0018 OPERATIONAL EFFECTIVENESS
    ANALYSIS DATA SHEETS

14
Contractor Manpower Reporting (C-1)
  • Required by the Army for all service type
    contract actions
  • Submitted through https//cmra.army.mil
  • Reporting period is period of performance not to
    exceed 12 months ending 30 Sep of each government
    fiscal year and must be reported by 31 Oct of
    each calendar year
  • CLIN 0003
  • Can separately or not separately price. Indicate
    in amount column (price or NSP)