2Agenda
- Project status
- achieved goals in the iteration
- project metrics
- Used work practices
- Completed work
- Mobile demo
- Plans for the next iteration
3Status of planned goals
- Review and refactor code
- Clearer structure of code.
- Future implementation was easier.
- Construct community architecture
- All community requirements produced.
- Produce simple community demo
- New functionality will be shown with a working
demo.
4Status of planned deliverables
- Project plan and requirements documents
- Updated to match current situation
- Technical documentation
- Architecture description of new requirements
added - Updated after refactoring
- Test case specifications
- Updated to cover new functionality
- Test report
- Added reports of new executions
5Realization of the tasks
- Design hours went to implementation
- Debugging was hindered
- New cycle was started before I1 ended
6Working hours by person
Realized hours in this iteration
Plan in the beginning of this iteration
Real Plan Diff
Hannu 541 60 -5
Jorma 921 77 16
Kaarle 521 60 -7
Kai 441 47 -2
Petteri 561 52 5
Sami 545 53 6
Ville 881 54 35
Total 451 403 48
PP I1 Subtot I2 I3 DE Total
Hannu 30 67 97 54 42 23 210
Jorma 25 54 79 57 48 25 210
Kaarle 30 70 90 48 40 25 210
Kai 32 89 121 48 16 25 210
Petteri 41 72 113 42 36 23 210
Sami 55 45 100 45 32 36 210
Ville 44 70 114 47 32 23 210
Total 257 465 722 341 266 122 1470
Latest plan (inc. realized hours and other
updates)
- Client debugging problems
- Work load shifted to Ville
- Server studying
PP I1 I2 Subtot I3 DE Total
Hannu 30 67 55 152 36 22 210
Jorma 25 54 93 172 24 14 210
Kaarle 30 70 53 153 40 17 210
Kai 32 89 45 166 17 27 210
Petteri 41 72 57 160 32 18 210
Sami 55 45 59 159 40 21 220
Ville 44 70 89 203 9 8 220
Total 257 465 451 704 194 121 1490
7Hours per work type in I2
8Hours per work type in the whole project
9Quality metrics
Issue metrics
PP I1 I2 Total
Reported 92 4 25 121
Closed 92 3 17 112
Open 0 1 8 9
Implementation 2 Blockers Critical Major Minor Trivial Total
Total open 0 0 4 3 1 8
This iteration reported 0 3 8 12 2 25
- Results of system testing
- Testing discovered new bugs that are being fixed
10Quality assessment
Functional area Coverage Quality Comments
Conversation 3 K Some major bugs, but works overall.
Push messages 2 J Works
User management 3 K Some major bugs, but works overall.
- Overall quality is good enough for a
demonstration - All unit tests passed!
Legend Coverage 0 nothing 1 we looked at
it 2 we checked all functions 3 its
tested Quality J quality is good K not
sure L quality is bad
11Software size
Lines of code I1 I2 I3 DE
Client total 2114 5895
Client comments 946 2404
Server total 2006 4592
Server comments 941 1958
Common total 204 156
Common comments 109 99
Total 4324 10643
Comments 1996 4461
Lines of code per programming hour I1 I2 I3 DE
Functional lines of code 15 10
Any line of code 27 16
12Risks
- MIDP2.0 phone
- Have not received a phone to test on.
- Testing with phone will cause delays.
- Tools produce problems
- Debugging didnt work with Eclipse and NDS.
- Project started slow
- Personell was sick or otherwise unable to work.
13Work practices
- Meeting practices
- Usability tests
- Unit tests
- Process construction and tuning
- Refactoring
14Unit tests
- Unit tests were written when possible
- Enhanced code quality
- Metrics (testclasses / actual classes)
- client 12 / 29 41
- common 0 / 3 0
- server 3 / 58 5,2
- all 15 / 90 16,7
- Each test class contained multiple tests.
- Common package doesnt contain functionality.
15Meeting practices
- Started to use in this I1
- Meetings took roughly half the time
- All necessary subjects were addressed
- Metrics
- Meetings lasted 7 less than planned
- Agenda times differed 60 from planned.
16Refactoring
- Refactoring was done for the whole system before
christmas. - Code was refactore simpler and cleared at the
expense of efficiency. - It was decided to optimize later, if necessary.
17Usability tests
- A GUI walkthrough test was carried out with a HUT
student - Usability issues were discovered in each
usability category. - New improvements to the GUI was derived from the
issues and they were listed.
18Process construction and tuning
- First reflection workshop was held
- Improvement suggestions were discovered.
- Many of them were implemented immediately, some
left to be implemented later on. - One more workshop to be held
- Generally, workshops seem to be very good way to
gather information about process from the project
group
19Configuration management
- Nightly builds
- Succeeded in 49 times
- Failed 14 times, 9 times due to unit tests.
- Other times were due to problems with scripts.
20Design patterns
- The number of added design patterns decreased
- Architecture was stablized
- No new were needed
- Refactoring
- Constitutes many of the newly used design
patterns.
21Results of the iteration
- Software
- Community functionality
- Server and client
- Demonstration
- New documentation
- Users guide
22Spikes
- MIDP1.0
- Connection over HTTP worked
- J2MEUnit
- Tested and works
- GameCanvas and fullscreen
- Tested with MIDP2.0 and works.
23Lessons learned
- Eclipse and NDS wont work together when
debugging MIDlets.
24Service overview
25Architecture overview
26Demonstration
27Plans for the next iteration
- Goals
- Scorched Earth game
- Deliverables
- Peer testing
- Risks
- Actual device
- Time underrun
- Schedule
- Task dependencies