Title: PPC Architecture Reviews
1PPC Architecture Reviews
2Supply Chain Interfaces Development Phase
4D
- Terminology
- Integration
- Recognition
90 of cost of data transfer
3mean time between failure (1 465 932 000)
- MEAN TIME BETWEEN FAILURE (792 523 400)A period
of time which is the mean period of time interval
between failures. - MEAN TIME BETWEEN FAILURES (MTBF) 1 A (TIME
BETWEEN FAILURES) (1 464 719 000)The time
duration between two consecutive failures of a
repaired item. - MEAN TIME BETWEEN FAILURES (MTBF) 1 B (TIME
BETWEEN FAILURES) (1 464 723 500)The
expectation of the time between failures Note. -
In English, the use of the abbreviation MTBF in
this sense is now deprecated. - MEAN TIME BETWEEN FAILURES (MTBF) 1 C (TIME
BETWEEN FAILURES) (1 464 728 000)The
expectation of the operating time between
failures. - MEAN TIME BETWEEN FAILURES (MTBF) 1 D (TIME
BETWEEN FAILURES) (1 464 732 500)Total time
duration of operating time between two
consecutive failures of a repaired item. - MEAN TIME BETWEEN FAILURES (MTBF) 2 (1 464 741
500)Predicts the average number of hours that
an item, assembly, or piece part will operate
before it fails. - MEAN TIME BETWEEN FAILURES (MTBF) 3 (1 464 714
500) For a particular interval, the total
functional life of a population of an item
divided by the total number of failures within
the population during the measurement interval.
The definition holds for time, rounds, miles,
events, or other measure of life units. - MEAN TIME BETWEEN FAILURES (MTBF) 4 (1 464 696
500)The average length of time a system or
component works without failure.
4Example of OG Engineering Applications
2D CAD
ADMINISTRATIVE
3D CAD
ANALYSIS/ SIMULATION
ENGINEERING DB (TECHNICAL DB)
INTELLIGENT SCHEMATIC
EQUIPMENT
PIPE SPEC MTO
LINE REGISTER
PLANNING
STRUCTURAL
EQUIPMENT (MECH) REGISTER
STRUCTURAL
PROCUREMENT/ MATERIAL ADM.
HVAC
DRAFTING (INTELLIGENT)
PROCESS SIMULATION
ELECTRICAL CONSUMER
ACCOUNTING
ELECTRICAL LOAD CALC.
WEIGHT MANAGEMENT
EL. HOOK-UP
INSTRUMENT
ETC.
CABLE ROUTING ADMINISRTATION
DRAFTING (UNINTELLIGENT) SKETCHES
SAFETY
MCC
ARCHITECT
MS OFFICE
GRAPHICAL REPORT - LOOP DRW.
PIPE SUPPORT
5Integration Across Applications
Project Data Sheet
Product Data Sheet
External Level
3D CAD
PID
Conceptual Model (Integration)
ISO 15926 DMRDL
Physical Level
P1
P2
6Integration Across Project Phases
Conceptual Process Design
Procurement
Construction
Detailed Engineering Design
Operation
External Level
Conceptual Model (Integration)
ISO 15926 DMRDL
Physical Level
P1
P2
7ISO 15926 - Data Model and Reference Data Library
OWL
Physical Object Classes
Manufactured Item Classes