Test Tube Activities at Ohio State (8/5/03) ... OSU designes HV board, Distribution board (both inside AL box) Angelo will bring 6 (8 if possible) input ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 5
Provided by: Kla7
Category:

less

Transcript and Presenter's Notes

Title: Test Tube Activities at Ohio State (8/5/03)


1
Test Tube Activities at Ohio State (8/5/03)
  • Two (very useful) sub-group meetings after last
    weekly meeting
  • Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
    -gt see Marks report
  • Electronics (Angelo, Klaus)
  • OSU designes HV board, Distribution board (both
    inside AL box)
  • Angelo will bring 6 (8 if possible) input
    protection circuits for anode signals
  • Angelo will modify one FE board to receive
    (negative) anode signals
  • Two (fine pitch) signal cables from AL box to
    mini crate
  • 75 ft of Amphenol/Spectra Strip received
  • With green (round) jacket, shielding
  • 20 pairs
  • Sent to SLAC (Charlie)
  • Kerpen HV cable is still not available.
  • SLAC (PCK) will try to obtain enough RPC HV cable
    for 8 HV lines from electronic hut to BaBar. Need
    to design HV transition box (8 short HV cables
    will be attached (soldered) to HV distribution PC
    board in AL box. Connect to long HV cables
    outside of magnet)

2
HV Distribution Board
  • HV capacitors Cable Connector Anode signal
    readout
  • Layout complete, 1 board for both tubes, Flat
    cable connector in hand
  • Will be tested with OSU tubes
  • Send to Princeton (or SLAC if too late)

3
Signal Distribution Board
  • Allow for baseline (single ended),
    pseudo-differental, and fully differential
    configuration
  • Layout (almost) complete
  • Receive cathode signals (16) via short twisted
    pair stub cables
  • 16 ch. Output (fine pitch twisted flat cable)

4
What will we need?
  • 8 HV channels with current monitoring,
    overcurrent trip
  • HV cables, HV connector box
  • Low voltage /-5 V, 300 mA in AL box
  • Low voltage /-5 V near mini crate (FE board,
    diff. Receiver)
  • Install signal cables (on their way to Charlie)
    -gt Need to identify the location of a suitable
    FEC crate!
  • This defines the location of the infrastructure
    connections in the AL box
  • Need this today!
  • Note Anode and Phi signals, HV, low voltage and
    gas (inout) will be all on the same side. The
    tubes will be shifted toward the other end of the
    AL box to make sufficient room for the
    infrastructure stuff.
  • Coax cables from detector (mini crate location)
    to outside the shielding wall so that we can view
    signals with beams on