1
Level 3 Muon Software
  • Paul Balm
  • Muon Vertical Review
  • May 22, 2000

2
Outline
  • Level 3 Muon Software overview
  • Software status
  • available tools filters
  • future tools filters
  • getting ready for roll-in
  • Conclusions

3
L3 Muon Software
  • Trigger decisions are made by filters _at_ 1kHz
  • Filters obtain the info they need from tools
  • Examples of tools
  • unpacking tool, tracking tool, tool for matching
    muon with central tracks
  • Filters run by ScriptRunner
  • So A tool finds a track, a filter decides
    whether the quality is high enough to pass the
    event.

4
Improvements over L2
5
Available Tools
  • Unpacking tool L3TMuoUnpack
  • accesses raw data transforms it into Hits,
    skipping intermediate stages (UnpDataChunk)
  • Local tracking tool L3TMuoLocal
  • calls unpacking tool
  • local tracking muon system only
  • tracking done by offline algorithms
    (muo_segmentreco muo_trackreco)

6
Foreseen tools
  • Unpacking
  • now done for all of the detector - probably
    timing inefficient
  • a seed provided by L2 would allow regional
    unpacking
  • need a tool as interface
  • Calorimeter track matching
  • Exploitation of scintillator times

7
Filters
  • Filters are not the responsibility of the muon ID
    group and should not be covered by the Review
  • We need them to test our tools
  • hit filter (are there any hits?), track
    filter
  • We are thinking about them anyway
  • (a little bit)

8
Roadmap to roll-in
  • The stages all tools need to pass
  • basic implementation
  • timing and efficiency measurement
  • final implementation
  • study of behavior as function of alg. parameters
  • (behavior rates and efficiencies)
  • Will go through all stages with basic set of
    tools first
  • unpacking local tracking tool - stage 2

9
Milestones
  • No milestones exist as specific as needed for
    this work
  • Official milestones set
  • L2 inputs to L3 defined (April 2000)
  • designed but not fixed (to my knowledge)
  • Availability of raw data generated by MC (April
    2000). Currently being tested
  • Level 3 hardware one full chain operational
  • Has already been met...

10
Conclusions
  • Current status of software
  • Basic tools implemented
  • Efficiency/timing measurements on their way
  • Were able to see raw data, no filtering on
    quality (yet!)
  • Roadmap to roll-in
  • Milestones set by management not specific enough
    (- and theyve all passed)
  • Schedule does not look too tight