Title: From Challenge To Opportunity
1(No Transcript)
2From Challenge To Opportunity To
Success 2008 The Year In Review
3Long-Term Planning
4Challenges
5(No Transcript)
6(No Transcript)
7(No Transcript)
8(No Transcript)
9(No Transcript)
10(No Transcript)
11(No Transcript)
12DSM Task Force
13(No Transcript)
14(No Transcript)
15(No Transcript)
16gt 1.5 MW savings
17(No Transcript)
18(No Transcript)
19(No Transcript)
20(No Transcript)
21(No Transcript)
22Demand-Side Management Least-Cost Resource
85 Megawatts
23(No Transcript)
24(No Transcript)
25Marshall 18.7 Megawatts
26Odin 20 Megawatts
27Geronimo Wind Energy
John Deere Energy Edison Mission Energy
28(No Transcript)
29Rugby
40 MW
30(No Transcript)
31(No Transcript)
3212 Wind Energyin 2010
33MinnesotaRenewable Energy Standard25 by 2025
34(No Transcript)
35(No Transcript)
36(No Transcript)
37(No Transcript)
38(No Transcript)
39(No Transcript)
40(No Transcript)
41(No Transcript)
42(No Transcript)
43Big Stone II participants
44(No Transcript)
45South Dakota Permits Site Construction Air
Quality Ground Water Surface WaterSolid
WasteTransmission Route
46(No Transcript)
47Two-Tier S-1 RateStructure
48New Rate Structure
Encourage DSM Stable Revenues Minimize Rate Shift
Impact
49MRES S-1 Rates
18.5 Increase Purchased Power Operation
Maintenance Lower Investment Income Depleted
Reserves
50(No Transcript)
51(No Transcript)
52(No Transcript)
53(No Transcript)
54(No Transcript)
55BLACKOUT
56Reliability Standards for the Bulk Electric
Systems of North America
27 Standards - 58 Requirements Operating
Procedures Maintenance Records Vegetation
Management
57Reliability Standards for the Bulk Electric
Systems of North America
Members Assisted By MRES Alexandria,
MN Atlantic, IA Detroit Lakes, MN Hutchinson,
MN Marshall, MN Moorhead, MN Pierre,
SD Watertown, SD
58(No Transcript)
59Big Stone Transmission
60(No Transcript)
61(No Transcript)
62CapX 2020 Approvals
Minnesota North DakotaSouth DakotaWisconsin Fede
ral
63(No Transcript)
64Single Rate Concept
T-1
Member Response by September 1, 2009
65Leon Schochenmaier Pierre, SD
66Todd Chambers
67Steve Lehner Watertown, SD
68Geoff Heig
69Brad Roos Marshall, MN
70Congratulations!
71Dennis Eisnach Maurice A. Te PaskePublic
Official Award
72David Edwards Community LeaderAward
73(No Transcript)
74(No Transcript)
75(No Transcript)
76(No Transcript)
77(No Transcript)
78Norris Severtson Lakota, ND
79Norris Severtson, right, receives Larry Hobart
Seven Hats Award from APPA Past Chairman Terry
Huval.
802008 POWER Awards
81A Look Ahead
82Minnesota PUC Approves CON
Formal Order Issued March 2009 Participants
Evaluating Conditions Construction Could Start In
2010
83Case More Than 4 Years Old
Ruling Issued February 18, 2009 Substantial cost
savings 6 MBPP Participants Would Benefit
84Current Coal-Delivery Rate Cut 60
Largest Award Ever For Captive Shipper BNSF
appealing decision
85(No Transcript)
86(No Transcript)
87Success
88Produced By
89(No Transcript)