Computing Dependable Yield Mitigation Storage -DYMS- - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Computing Dependable Yield Mitigation Storage -DYMS-

Description:

... Corps Serving The Army and the Nation. Reallocation ... Jonathan.c.long_at_usace.army.mil. US Army Corps. of Engineers One Corps Serving The Army and the Nation ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 15
Provided by: m4bl
Category:

less

Transcript and Presenter's Notes

Title: Computing Dependable Yield Mitigation Storage -DYMS-


1
Computing Dependable Yield Mitigation
Storage-DYMS-
US Army Corps of Engineers
One Corps Serving The Army and the Nation
2
(No Transcript)
3
Why Compute DYMS?
US Army Corps of Engineers
  • DYMS
  • Are determined to keep other water supply users
    yield whole
  • Require requesting entity to purchase the extra
    storage to keep other users yield whole
  • Must be calculated when storage is reallocated
    from the flood pool
  • Do not have to be calculated when reallocations
    are made from the conservation pool

One Corps Serving The Army and the Nation
4
Reallocation from Conservation Pool
Reallocation from Flood Control
Flood Control
Flood Control
Flood Control
Flood Control
Requested Storage DYMS
  • Conservation Pool
  • Hydropower
  • Water Supply
  • Conservation Pool
  • Hydropower
  • Water Supply

Requested Storage
  • Conservation Pool
  • Hydropower
  • Water Supply
  • Conservation Pool
  • Hydropower
  • Water Supply

Existing
Existing
Modified
Modified
5
Reallocation from Flood Control
Flood Control
Flood Control
Requested Storage DYMS
  • Conservation Pool
  • Hydropower
  • Water Supply
  • Conservation Pool
  • Hydropower
  • Water Supply

Existing
Modified
6
US Army Corps of Engineers
Computing DYMS
One Corps Serving The Army and the Nation
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
Summary
US Army Corps of Engineers
  • 1. Iterative Process
  • 2. Obtain Yield/Storage Curve and Curve Data
  • 3. Guess at a new Total Yield (Current
    Reallocation lt GUESS lt Upper limit)
  • 4. Interpolate to obtain New Storage
  • 5. Determine new Yield/Storage Ratio
  • 6. Use new Yield/Storage Ratio to obtain new
    storage values
  • 7. Subtract the sum of the yield values from your
    GUESSED Yield to obtain Hydropower Yield
  • 8. Check calculated hydropower storage against
    current hydropower storage
  • 9. Re-iterate until the difference approaches zero

One Corps Serving The Army and the Nation
13
For further information contact
US Army Corps of Engineers
  • Jonathan C. Long, P.E.
  • (501) 324-7342
  • CESWL-PR-P
  • Jonathan.c.long_at_usace.army.mil

One Corps Serving The Army and the Nation