Substation Connection - PowerPoint PPT Presentation

About This Presentation
Title:

Substation Connection

Description:

Emergency and Level 2 Electrical Contractors Sydney 24 hours in a day available. Call Professionals whenever you need and get A-grade Services. – PowerPoint PPT presentation

Number of Views:103
Slides: 6
Provided by: digitalmarketting
Category: Other

less

Transcript and Presenter's Notes

Title: Substation Connection


1
SUBSTATION CONNECTION
Included as part of our services, we offer
underground connections into pad mount sub
stations. We are authorised for these works
within the Endeavour Energy network area
generally as part of larger installations. We can
assist you with the applications through to the
inspections and energisation of your service. We
can also include any excavation requirements you
may have.
We work closely with Level 1 infrastructure and
Level 3 design contractors extending their
services to you.
2
UPGRADES MODIFICATIONS
An extensive scope is offered as part of this
component. Our services included but not limited
to Main Switchboard Upgrades. Capacity
Upgrades. Consumer Mains - Installation
Upgrade. Switchboard Relocations
Alterations. MPDs and Meter Panel
upgrades. Overhead Underground Service
Alterations. Service Relocations. Defect
Rectifications. Temporary Builders
Service Asbestos board works.
3
POWER POLES
Private Poles aka Private Service Poles (PSP) or
Pole A's are items associated with your
electricity connection they are also a very
common fail point. Their age and condition often
contributes to them failing along with affects
from other external influences.
We offer the supply and installation of new poles
both metal and timber, pole replacements
including the changeover of your service wiring
and complete temporary builders services.
We carry out excavation and the relocation of any
underground services along with a rock and
concrete coring service sometimes required for
the installation. All of our installations are
guaranteed.
4
DISCONNECTION REMOVAL
Disconnection of your propertys service cables
is required when an existing structure is ready
for demolishment. The process involves
disconnecting and removing the overhead or
underground service from the network along with
any metering equipment on site belonging to the
supply authority.
In most cases you are able to transfer the
connection to a temporary pole for use over the
period of contruction.
5
Contact Us
  • Address
  • Servicing Sydney Metro
  • Email
  • enquiry_at_SL2.com.au
  • Call
  • 0414875354
Write a Comment
User Comments (0)
About PowerShow.com