Title: polavaram project
1HEARTY WELCOME
2GODAVARI MAATA
3- PRESENTATION
- ON
- POLAVARAM PROJECT
- BY
- SANA NAGESWARA RAO
4INDIRA SAGAR POLAVARAM PROJECT
5DELTA SHILPI
6HISTORY OF THE PROJECT
- In 1941 Polavaram Project was first contemplated
by Sri L.Venkata krishna Iyer ,the then Chief
Engineer of Combined Madras State for FRL _at_150
ft .
7- From 1942 to 1946 detailed investigations were
carried out for the following proposals. - 1) FRL 170 ft Storage 340 TMC
- 2) FRL 192 ft Storage 588 TMC
- 3) FRL 198 ft Storage 693 TMC
- 4) FRL 208 ft Storage 836 TMC
8- 13 Alternative Sites were studied by Eminent
Engineers across the Globe and finally decided - for the project at FRL198 ft and likely to be
raised to 208 ft with 836 TMC storage capacity - ( This is named as Rama pada sagar )
9- Eminent Foreign Engineers visited Project Site
- 1) Dr. J.L.Salvage , C.E/USBR,U.S.A
- 2) Dr. Karl Terzaghi, Father of Soil
Mechanics,Harvard UniversityU.S.A - 3) Dr. S.O.Harper, C.E,USBR,U.S.A
- 4) Sir Murdoch Mac Donald, Consulting Engineer,U.K
10Eminent Engineers from India
- 1.Sri Sonti Rama Murty Pantulu
- 2.Sri Mokshagundam visweswarayya
- 3.Dr. K.L.Rao
- 4. Sri K.Srirama Krishnayya
- 5. Sri J.A.Murrey
11- Cost of the project in 1946 Rs.125 Crores
(Differed because of the financial constraints) - Had it been implemented the lands from Srikakulam
to Nellore might have been Irrigated with
utilisation of 1250 TMC
12- After Independence again,The Polavaram Prroject
has lost its chance at the tie with Nagarjuna
Sagar Project in Dec1955 - Third time Polavaram project was denied in
preference to Sriram Sagar Project in July 1963
13- Govt. of India has constituted GWDT under the
Chairmanship of Sri Bachawat in 1969 and the
Tribunal has given the award in 1978 and its
modified final award in 1980. In accordence with
the award agreements were concluded by all the
involved states.
14- In 1978 the first Agreements were concluded with
Karnataka, Madhya Pradesh and Orissa states
for FRL 150 ft.with the initiation of sri
Jalagam vengala rao. - In 1980 all the concerned C.Ms were concluded
agreements regarding the submersion and Sri
T.Anjaiah,The Honble Chief Minister of AP has
laid the foundation stone on 19-05-1981(Rs. 750
Crores).
15- In 1983 the first proposal of the project was
submitted to C.W.C New Delhi for approval. - In 1997 Inter State meeting was convened by CWC
and Orissa asked for joint survey. - In 2000-01 APERL,Hyderabad has submitted the
project details to all the inter states. -
- The A.P Govt has deposited money with Orissa
Govt for conducting public hearing and with
Chattisgarh Govt for joint survey.Both the Govts
are not responding.
16- The project was grounded in 2004 after 62 years
of its first thought.(Foundation stone was laid
on (05- 09- 2004) - By 2008 the AP Govt has got all the clearences of
20 Directorates of CWC and finally TAC clearence
in 2/2009.
17- Immediately after TAC Clearence proposals were
submitted to Govt. of India for considering
Polavaram Project as National Project and in
principle the same was accepted - Due to political pressure from Telangana leaders
and other states the proposals were again
referred to financial clearence for the revised
cost , Final TAC clearence was also given on
24-1-2011. - On ORISSAS case the SC has appointed experts
comitte (Gopal Krishnan committee 2012)to study
if there are any deviations by AP on Batchavat
tribunal award and the comitte has reported that
there are no deviations.
18- In the last 7 years so many hurdles were created
by so many groups and with their behest other
states also filed so many cases against this
project in High Courts and Supreme Court. - In 2004 an alternative proposal for 3 Barrages
surfaced,but rejected by Expert Engineers
Committee in 2005 and 2009.CWC also rejected the
proposal.
19Reasons For Rejection
- 1 Cost of the Barrages is high.
- 2 Inter linking of rivers is not possible.
- 3 Storage of water is very less
- 4 Power generation is very less
- 5 No gravity flow. Water is to be lifted.
- 6 Construction of Barrages with high gates
- and deeper foundations is difficult.
- 7 Navigation of vessels is not possible as
contemplated
20- RIVER GODAVARI
- Catchment area 3,06,643 Sq. km
- River Godavari is the second largest River in
India - Godavari originates at NASIK Maharatra and
- After travelling 700 kms it enters A.P at BASARA
- Length of the river 1465 km
- Length of river in A.P 765 km
- Maximum Flood Discharge 33 L C/s,(0.87 L
cumecs) (1986) - Probable Maximum Flood 36 L c/s,(1.02 L cumecs)
(designed) - 50 L Cusecs(checked )
21Bachawat Tribunal Allocation
- Dependable yield in River Godavari 3000
TMC - Share of AP as per Bachawat Tribunal 1470 TMC
- Present utilization of Godavari waters 750
TMC - Proposed utilisation(OngoingCompleted) 720 TMC
- Every year Godavari waters letting into
- sea as waste on an average
3000 TMC - ( combined AP state total utilisation) 2500 TMC
-
22TRIBUTARIES
- Tributaries of River Godavari
- and their contribution
- Manjeera --
- Pranahita 35
- Indravati 23
- Sabari 12
- Minor Tributories 8
- Self catchment 22
23- BENEFITS FROM THE PROJECT
- Total utilization of water 301 TMC
- New ayacut 7.2 L acres
- Stabilisation Godavari delta 10.50 L acres
- Krishna Delta Stabilisation 13.50 L acres
- 80 TMC
- Industrial and drinking water to Vizag 23.44 TMC
- Power Generation 960 MW
24OTHER STATES
- 1. Karnataka.. 24 Tmc
- 2. Maharastra..11 Tmc
- 3. Rayalaseema
- Telangana45 Tmc
- ( Krishna waters)
- 4. Orissa(Lift)5 Tmc
- 5. Chattishgarh.1.5 Tmc
25- Drinking water Supply
- Villages covered 540 Nos
- Population covered 25 Lakhs
- To develop Pisiculture and Tourism
- Second phase of the project (Uttrandhra Srujala
Sravanthi,Chintalapudi LI Scheme) etc. 16
Lakh Acres
26UTTARANDHRA SUJALA SRAVANTI
- 1.Ayacut 8.0 Lakhs
acres - 2.Water utilisation 63.20 Tmc
- 3.Drinking water 1037 villages
- 4.Cost of the project 7214 cr
- 5.Food grains production 2000 cr worth
annually. - 6 Govt approval given on 2-1-2009
27PROJECTED REVENUE
- 1. 1600 crores worth of food grains per
- year is the projected production.
- 2. 960 M W power worth 1500 cr per year.
- 3. Industrial and drinking water worth
- Rs 1000 cr per year.
28(No Transcript)
29(No Transcript)
30- Total cost of the project Rs.17,340Crores
- (As submitted to cwc)
- Cost of the project accepted Rs 16,010 crores
- T.B.L 52.72 M (175 Ft )
- F.R.L 45.72 M (150 Ft)
- M.D.D.L 41.15 M (135 Ft)
- Gross Storage 194.60 TMC
- Live Storage 75.20 TMC
- Dead Storage 119.40 TMC
31COMPONENTS OF THE PROJECT
- Earth-cum-Rock fill Dam
- Length of the Dam 2410 M
- Top of bank Level 53.42M
- ( 175 ft )
- Top width of the bank 12 M
32COMPONENTS OF THE PROJECT
- Spillway
- Length 1050 M
- No of vents 48 Nos
- Size of vent 16 M x 20 M
- Type of gates Radial Type
- Crest Level 25.72 M
33- Left Main Canal
- Ayacut - 4.00 Lakh
Acres - Proposed Water Utilisation - 103.70 TMC
- Industries and drinking water23.44TMC
- Length of LMC - 181.50 KM (BW 100.50m)
- Sluice level 35.42 m (116.00 ft )
- FSD 5.12m(17ft) FSL 40.54(133.00 ft)
- Discharge 495.54cum(17500c/s)
34- Right Main Canal
- 1) Ayacut - 3.21 Lakh Acres
- 2) Proposed Water Utilisation - 89.54 TMC
- 3) Diversion to Krishna river - 84.70 TMC
- 4) Length of RMC - 174 KM (BW 85.50m)
- Sluice level 35.23 m ( 115.00 ft)
- FSL 40.23m( 131.00 ft) FSD 5m(16 ft)
- Discharge 495.55 cum (17,500 c/s)
- POWER GENERATION(ON LEFT BANK)
- 1) Power Generation 960 MW
- 2) No of units 12 of 80 MW Each
35SUBMERGENCE DETAILS
- 1)East Godavari villages
- 2) West Godavari villages
- 3) Orissa------------- 8 villages
- 4)Chattisgharh----- 4 villages
-
----------------- Total -------
289 villages
---------------- - (All these are under submersion for 33 L)
36Khammam Tahsil Map
37POLAVARAM ORDINENCE DETAILS
- 1.Out of 8 mandals in Bhadrachalam Rev Dn 4
mandals,Kunavaram,Chintur,VRpuram and
Bhadrachalam(except town) were given. - 2.In Palvancha Rev Dn 3 mandals were
given(Velairpadu,Kukunuru,Bhurgampahad) 3. Up
to 1959 Bhadrachalam Rev Dn(8M) is in EGDt.But in
bifurcation we lost 4 (M) Wazed,Venkatapuram,Cherl
a,Dummagudm andBhadrachalamTown. AP has to fight
for Bhadrachalam and 13 (v) in Burgampahad.
38- ANDHRA PRADESH
- Area under submersion 38,694 Ha
- No of families affected 44,574 Nos
- Total population affected 1,30,837 nos
- Tribal population affected 64,510 nos
- Non Tribal population affected 66,327nos
39- ORISSA
- Area under submersion 648 Ha
- No of families affected 1002 Nos
- Total population affected 6316 Nos
- CHATTISHGARH
- Area under submersion 796 Ha
- No of families affected 2335 Nos
- Total population affected 11 766 Nos
- (With protective embankments no submersion at
all.)
40- Protective Embankments
- Nearly 30 KM length of protective embankments
are to be formed for Rivers Sabari and Sileru at
a cost of Rs.622.0 Crores to protect the villages
of Orissa and Chattisgarh from submersion as per
Bachawat Tribunal.
41- If not protective embankments A.P Govt is willing
to pay compensation to - ORISSA 343.25 crores
- CHATTISGARH 278.31 crores
- Per head compensation in Orissa5.45 L
- Per head compensation in Chattis2.37 L
42SUBMERSION AREAS
43CLEARANCES(got from all the 20 directorates)
44- Final Technical Advisory Committee
Clearance obtained in 02/2009 - ( This Clearance facilitates for the Central
funding) - Again TAC clearence is insisted for revised cost.
AP got it for 16,010 crs.
45Comparision
- Sno component Polavaram PranahitaChevella
- 1 cost 16,010 cr 40,000 cr
- 2 Flow Gravity Lift(550M)
- 3 Power 960 MW 3300Mw
- (Generation)
(required) - 4 Ayacut 7.20 L(new)23L(old) 16 L(no)
- 5. cost per ac power Nil 8000 to 25,000
- 6 Clearences All obtained Yet to
obtain -
46Present Stage of Project
- Tenders were called for Spillway, Earth-cum-Rock
fill dam and Power house (earthwork) (approximate
cost is Rs.4000 Crores) and awarded to Transtroy.
- Work is going on in all packages including
Spillway,Power house and Earth-Cum- Rockfill DaM - CEA is objecting for 960 MW power by insisting 45
years availability of water (once given for on 35
yrs availability)
47- The Project is now declared as National Project
by Govt. of India.on the eve of the state
bifurcation - The probable year of completion of the project is
2018. - 36 of Overall Project Works are completed by
6/2014(5202 cr) - (Spill way--6,Earth Dam-2,Canals-65,Power
house 3 )
48- Forest compensation of Rs.472 Crores were paid.
- Land handed over to forest dept---3731 Ha
- RR Packages are in advanced stage.
49LAND ACQUISITION
- Land to be acquired
- Wet 11,920 Ha (29,454 Ac )
- Dry 33,050 Ha (81,667 Ac )
- Gardens 2,510 Ha ( 6,202 Ac )
- Total 47,480 Ha (1,17,323 Ac )
- Forest land 3223 ha
50- The Lift Irrigation schemes contemplated in
Telangana Region upstream of Polavaram Project
- - Pranahita Chevella 20,765 Cusecs
- Kanthanapalli 10,000 Cusecs
- Yellampalli 6,000 Cusecs
- Devadula 5,000 Cusecs
- Dummugudem 27,000 Cusecs
- Indira Sagar LI Scheme 1,600 Cusecs
- Rajiv Sagar LI Scheme 1,600 Cusecs
- -------------------------
- Total 71,965 Cusecs
- ------------------------
51- The average monthly flows in River Godavari
- September 60,000 Cusecs
- October 30,000 Cusecs
- November/December 10,000 Cusecs
- January to May 3,000 Cusecs
52- The total proposed utilization inTelangana is
71,965 c/s while the available flows in River
Godavari are hardly 60,000 c/s in September,
which dwindle down to 3,000 c/s from January to
May.
53- If the Polavaram Project is not completed on
priority well before the commissioning of the
upstream projects, the entire delta of 10.20 L
Acres under Godavari will be affected even for
Khariff,forget about Rabi.
54CONSEQUENCES If Polavaram project is not
completed as it is
55- 1) The concept of Inter Linking of Rivers will be
defeated. (17 18 Links are in AP) - 2) No gravity flow for 7.2 L ac
- of new ayacut.
- 3) Without supplementation of 80 TMC of water,
13.50 Lakh Acres of Krishna delta may not be
stabilised.
56- 4) Without 24.0 TMC of
- Water,the Industries in
- and around Visakhapatnam
- will be affected.
- 5) There will be a severe set
- back for drinking water
- facility for Visakhapatnam
- and enrouting villages.
57- 6) Ayacut of 8.0 L Acres of arid
- and backward Uttarandhra
- districts will be denied irrigation
- water facility permanently.
- 7) Ayacut of 2.0 L acres of upland
West Godavari(Chintalapudi lift) will be denied
Irrigation - 8) 960 MW of Eco friendly power production
is not possible.
58- 9) Delta ayacut of 10.50 L acres of East and West
Godavari districts may not have Rabi in future
and even Kharif also may experience shortage of
water from October onwards. - 10)Entire sea coast lands of East and West
Godavari will become saline and may not be useful
for Irrigation
59- . 11) Rayalaseema districts may not get benifit
if linkage of rivers is not done. - 12) Set back for the proposed SEZ between
KAKINADA and VIZAG. - 13).For new capital of AP Polavaram is the only
source. - 14)
60TASK AHEAD
- 1.FINALISE ALL FORMALITIES WITHOUT ANY FURTHER
DELAY AND COMPLETE THE WORK BY 2018 - 2.SEE THAT THE ALLOCATION OF FUNDS TO COMPLETE
THE PROJECT . - 3.POLAVARAM WATER ALLOCATION WAS REDUCED FROM
301 TO 249 TMC. RESTORE IT 301 TMC. - 4.GET ALLOCATION OF 60 TMC OF WATER FOR
UTTARANDHRA
615. PROTECT THE LOWER RIPARIAN RIGHTS OF KRISHNA
AND GODAVARI DELTA AYACUT AND SAVE IT FROM
BECOMING SALINE. 6. THE POLAVARAM PROJECT IS TO
BE COMPLETED IN ITS PRESENT FORM AND THE CONCEPT
OF BARRAGES MUST BE SHELVED. 7. GET BACK THE
BALANC 4(M) OF BHADRACHALAM Rev Div TO EAST
GODAVARI INCLUDING BHADRACHALAM TOWN. 8.
ALLOCATE 50 TMC of GODAVARI WATERS TO NEW AP
CAPITAL .
62(No Transcript)
63(No Transcript)
64- Yes it is true that 276 villages and 1 lakh
people are being rehabilitated - When compared to the benefits of the project with
good RR package this can be done
65(No Transcript)
66- The maximum observed flood is 33 lakh cusecs and
the project is designed for 36 lakh cusecs - The stability is checked for 50 lakhs PMF and
there is no possibility even for that. This PMF
is for once in 10000 years
67(No Transcript)
68(No Transcript)
69(No Transcript)
70- 7.20 lakh acres of new anicut and 10.5 lakh acres
stabilization is going to be benefited in both
East and West Godavari districts - The project itself is in both the districts.
Major benefits are for this two districts
71(No Transcript)
72- No, if Polavaram is completed the flood waters
going into the sea as waste will be utilized
effectively by both Telangana and Andhra with the
help of interlinking of rivers
73(No Transcript)
74 REHABILITATION A good RR Package is being
implimented 1)2.5 ha of dry/1.25 ha of wet land
to land compensation for Tribals in notified
areas. 2)A house in 240 sq yds withRs
1,18,000/- 3)750 days wages 4)650 days
wages 5)500 days wages 6)Protection of their
fishing rights
75(No Transcript)
76Tehri dam and Nagarjunasagar
Tehri 860ft Nsagar 420ft Pol 175ft
77(No Transcript)
78(No Transcript)
79Papikondalu submersion line 150 ft
80(No Transcript)
81conclusion
- So, let us all fight unitedly for early
completion of POLAVARAM project in its present
shape to safe guard the present generation and
future generations Interests - JAI
- POLAVARAM
- PROJECT
82THANK YOU