Title: polavaram project


1
HEARTY WELCOME
2
GODAVARI MAATA
3
  • PRESENTATION
  • ON
  • POLAVARAM PROJECT
  • BY
  • SANA NAGESWARA RAO

4
INDIRA SAGAR POLAVARAM PROJECT
5
DELTA SHILPI
6
HISTORY OF THE PROJECT
  • In 1941 Polavaram Project was first contemplated
    by Sri L.Venkata krishna Iyer ,the then Chief
    Engineer of Combined Madras State for FRL _at_150
    ft .

7
  • From 1942 to 1946 detailed investigations were
    carried out for the following proposals.
  • 1) FRL 170 ft Storage 340 TMC
  • 2) FRL 192 ft Storage 588 TMC
  • 3) FRL 198 ft Storage 693 TMC
  • 4) FRL 208 ft Storage 836 TMC

8
  • 13 Alternative Sites were studied by Eminent
    Engineers across the Globe and finally decided
  • for the project at FRL198 ft and likely to be
    raised to 208 ft with 836 TMC storage capacity
  • ( This is named as Rama pada sagar )

9
  • Eminent Foreign Engineers visited Project Site
  • 1) Dr. J.L.Salvage , C.E/USBR,U.S.A
  • 2) Dr. Karl Terzaghi, Father of Soil
    Mechanics,Harvard UniversityU.S.A
  • 3) Dr. S.O.Harper, C.E,USBR,U.S.A
  • 4) Sir Murdoch Mac Donald, Consulting Engineer,U.K

10
Eminent Engineers from India
  • 1.Sri Sonti Rama Murty Pantulu
  • 2.Sri Mokshagundam visweswarayya
  • 3.Dr. K.L.Rao
  • 4. Sri K.Srirama Krishnayya
  • 5. Sri J.A.Murrey

11
  • Cost of the project in 1946 Rs.125 Crores
    (Differed because of the financial constraints)
  • Had it been implemented the lands from Srikakulam
    to Nellore might have been Irrigated with
    utilisation of 1250 TMC

12
  • After Independence again,The Polavaram Prroject
    has lost its chance at the tie with Nagarjuna
    Sagar Project in Dec1955
  • Third time Polavaram project was denied in
    preference to Sriram Sagar Project in July 1963

13
  • Govt. of India has constituted GWDT under the
    Chairmanship of Sri Bachawat in 1969 and the
    Tribunal has given the award in 1978 and its
    modified final award in 1980. In accordence with
    the award agreements were concluded by all the
    involved states.

14
  • In 1978 the first Agreements were concluded with
    Karnataka, Madhya Pradesh and Orissa states
    for FRL 150 ft.with the initiation of sri
    Jalagam vengala rao.
  • In 1980 all the concerned C.Ms were concluded
    agreements regarding the submersion and Sri
    T.Anjaiah,The Honble Chief Minister of AP has
    laid the foundation stone on 19-05-1981(Rs. 750
    Crores).

15
  • In 1983 the first proposal of the project was
    submitted to C.W.C New Delhi for approval.
  • In 1997 Inter State meeting was convened by CWC
    and Orissa asked for joint survey.
  • In 2000-01 APERL,Hyderabad has submitted the
    project details to all the inter states.
  • The A.P Govt has deposited money with Orissa
    Govt for conducting public hearing and with
    Chattisgarh Govt for joint survey.Both the Govts
    are not responding.

16
  • The project was grounded in 2004 after 62 years
    of its first thought.(Foundation stone was laid
    on (05- 09- 2004)
  • By 2008 the AP Govt has got all the clearences of
    20 Directorates of CWC and finally TAC clearence
    in 2/2009.

17
  • Immediately after TAC Clearence proposals were
    submitted to Govt. of India for considering
    Polavaram Project as National Project and in
    principle the same was accepted
  • Due to political pressure from Telangana leaders
    and other states the proposals were again
    referred to financial clearence for the revised
    cost , Final TAC clearence was also given on
    24-1-2011.
  • On ORISSAS case the SC has appointed experts
    comitte (Gopal Krishnan committee 2012)to study
    if there are any deviations by AP on Batchavat
    tribunal award and the comitte has reported that
    there are no deviations.


18
  • In the last 7 years so many hurdles were created
    by so many groups and with their behest other
    states also filed so many cases against this
    project in High Courts and Supreme Court.
  • In 2004 an alternative proposal for 3 Barrages
    surfaced,but rejected by Expert Engineers
    Committee in 2005 and 2009.CWC also rejected the
    proposal.

19
Reasons For Rejection
  • 1 Cost of the Barrages is high.
  • 2 Inter linking of rivers is not possible.
  • 3 Storage of water is very less
  • 4 Power generation is very less
  • 5 No gravity flow. Water is to be lifted.
  • 6 Construction of Barrages with high gates
  • and deeper foundations is difficult.
  • 7 Navigation of vessels is not possible as
    contemplated

20
  • RIVER GODAVARI
  • Catchment area 3,06,643 Sq. km
  • River Godavari is the second largest River in
    India
  • Godavari originates at NASIK Maharatra and
  • After travelling 700 kms it enters A.P at BASARA
  • Length of the river 1465 km
  • Length of river in A.P 765 km
  • Maximum Flood Discharge 33 L C/s,(0.87 L
    cumecs) (1986)
  • Probable Maximum Flood 36 L c/s,(1.02 L cumecs)
    (designed)
  • 50 L Cusecs(checked )

21
Bachawat Tribunal Allocation
  • Dependable yield in River Godavari 3000
    TMC
  • Share of AP as per Bachawat Tribunal 1470 TMC
  • Present utilization of Godavari waters 750
    TMC
  • Proposed utilisation(OngoingCompleted) 720 TMC
  • Every year Godavari waters letting into
  • sea as waste on an average
    3000 TMC
  • ( combined AP state total utilisation) 2500 TMC

22
TRIBUTARIES
  • Tributaries of River Godavari
  • and their contribution
  • Manjeera --
  • Pranahita 35
  • Indravati 23
  • Sabari 12
  • Minor Tributories 8
  • Self catchment 22

23
  • BENEFITS FROM THE PROJECT
  • Total utilization of water 301 TMC
  • New ayacut 7.2 L acres
  • Stabilisation Godavari delta 10.50 L acres
  • Krishna Delta Stabilisation 13.50 L acres
  • 80 TMC
  • Industrial and drinking water to Vizag 23.44 TMC
  • Power Generation 960 MW

24
OTHER STATES
  • 1. Karnataka.. 24 Tmc
  • 2. Maharastra..11 Tmc
  • 3. Rayalaseema
  • Telangana45 Tmc
  • ( Krishna waters)
  • 4. Orissa(Lift)5 Tmc
  • 5. Chattishgarh.1.5 Tmc

25
  • Drinking water Supply
  • Villages covered 540 Nos
  • Population covered 25 Lakhs
  • To develop Pisiculture and Tourism
  • Second phase of the project (Uttrandhra Srujala
    Sravanthi,Chintalapudi LI Scheme) etc. 16
    Lakh Acres

26
UTTARANDHRA SUJALA SRAVANTI
  • 1.Ayacut 8.0 Lakhs
    acres
  • 2.Water utilisation 63.20 Tmc
  • 3.Drinking water 1037 villages
  • 4.Cost of the project 7214 cr
  • 5.Food grains production 2000 cr worth
    annually.
  • 6 Govt approval given on 2-1-2009

27
PROJECTED REVENUE
  • 1. 1600 crores worth of food grains per
  • year is the projected production.
  • 2. 960 M W power worth 1500 cr per year.
  • 3. Industrial and drinking water worth
  • Rs 1000 cr per year.

28
(No Transcript)
29
(No Transcript)
30
  • Total cost of the project Rs.17,340Crores
  • (As submitted to cwc)
  • Cost of the project accepted Rs 16,010 crores
  • T.B.L 52.72 M (175 Ft )
  • F.R.L 45.72 M (150 Ft)
  • M.D.D.L 41.15 M (135 Ft)
  • Gross Storage 194.60 TMC
  • Live Storage 75.20 TMC
  • Dead Storage 119.40 TMC

31
COMPONENTS OF THE PROJECT
  • Earth-cum-Rock fill Dam
  • Length of the Dam 2410 M
  • Top of bank Level 53.42M
  • ( 175 ft )
  • Top width of the bank 12 M

32
COMPONENTS OF THE PROJECT
  • Spillway
  • Length 1050 M
  • No of vents 48 Nos
  • Size of vent 16 M x 20 M
  • Type of gates Radial Type
  • Crest Level 25.72 M

33
  • Left Main Canal
  • Ayacut - 4.00 Lakh
    Acres
  • Proposed Water Utilisation - 103.70 TMC
  • Industries and drinking water23.44TMC
  • Length of LMC - 181.50 KM (BW 100.50m)
  • Sluice level 35.42 m (116.00 ft )
  • FSD 5.12m(17ft) FSL 40.54(133.00 ft)
  • Discharge 495.54cum(17500c/s)

34
  • Right Main Canal
  • 1) Ayacut - 3.21 Lakh Acres
  • 2) Proposed Water Utilisation - 89.54 TMC
  • 3) Diversion to Krishna river - 84.70 TMC
  • 4) Length of RMC - 174 KM (BW 85.50m)
  • Sluice level 35.23 m ( 115.00 ft)
  • FSL 40.23m( 131.00 ft) FSD 5m(16 ft)
  • Discharge 495.55 cum (17,500 c/s)
  • POWER GENERATION(ON LEFT BANK)
  • 1) Power Generation 960 MW
  • 2) No of units 12 of 80 MW Each

35
SUBMERGENCE DETAILS
  • 1)East Godavari villages
  • 2) West Godavari villages
  • 3) Orissa------------- 8 villages
  • 4)Chattisgharh----- 4 villages

  • ----------------- Total -------
    289 villages
    ----------------
  • (All these are under submersion for 33 L)

36
Khammam Tahsil Map
37
POLAVARAM ORDINENCE DETAILS
  • 1.Out of 8 mandals in Bhadrachalam Rev Dn 4
    mandals,Kunavaram,Chintur,VRpuram and
    Bhadrachalam(except town) were given.
  • 2.In Palvancha Rev Dn 3 mandals were
    given(Velairpadu,Kukunuru,Bhurgampahad) 3. Up
    to 1959 Bhadrachalam Rev Dn(8M) is in EGDt.But in
    bifurcation we lost 4 (M) Wazed,Venkatapuram,Cherl
    a,Dummagudm andBhadrachalamTown. AP has to fight
    for Bhadrachalam and 13 (v) in Burgampahad.

38
  • ANDHRA PRADESH
  • Area under submersion 38,694 Ha
  • No of families affected 44,574 Nos
  • Total population affected 1,30,837 nos
  • Tribal population affected 64,510 nos
  • Non Tribal population affected 66,327nos

39
  • ORISSA
  • Area under submersion 648 Ha
  • No of families affected 1002 Nos
  • Total population affected 6316 Nos
  • CHATTISHGARH
  • Area under submersion 796 Ha
  • No of families affected 2335 Nos
  • Total population affected 11 766 Nos
  • (With protective embankments no submersion at
    all.)

40
  • Protective Embankments
  • Nearly 30 KM length of protective embankments
    are to be formed for Rivers Sabari and Sileru at
    a cost of Rs.622.0 Crores to protect the villages
    of Orissa and Chattisgarh from submersion as per
    Bachawat Tribunal.

41
  • If not protective embankments A.P Govt is willing
    to pay compensation to
  • ORISSA 343.25 crores
  • CHATTISGARH 278.31 crores
  • Per head compensation in Orissa5.45 L
  • Per head compensation in Chattis2.37 L

42
SUBMERSION AREAS
43
CLEARANCES(got from all the 20 directorates)
44
  • Final Technical Advisory Committee
    Clearance obtained in 02/2009
  • ( This Clearance facilitates for the Central
    funding)
  • Again TAC clearence is insisted for revised cost.
    AP got it for 16,010 crs.

45
Comparision
  • Sno component Polavaram PranahitaChevella
  • 1 cost 16,010 cr 40,000 cr
  • 2 Flow Gravity Lift(550M)
  • 3 Power 960 MW 3300Mw
  • (Generation)
    (required)
  • 4 Ayacut 7.20 L(new)23L(old) 16 L(no)
  • 5. cost per ac power Nil 8000 to 25,000
  • 6 Clearences All obtained Yet to
    obtain

46
Present Stage of Project
  • Tenders were called for Spillway, Earth-cum-Rock
    fill dam and Power house (earthwork) (approximate
    cost is Rs.4000 Crores) and awarded to Transtroy.
  • Work is going on in all packages including
    Spillway,Power house and Earth-Cum- Rockfill DaM
  • CEA is objecting for 960 MW power by insisting 45
    years availability of water (once given for on 35
    yrs availability)

47
  • The Project is now declared as National Project
    by Govt. of India.on the eve of the state
    bifurcation
  • The probable year of completion of the project is
    2018.
  • 36 of Overall Project Works are completed by
    6/2014(5202 cr)
  • (Spill way--6,Earth Dam-2,Canals-65,Power
    house 3 )

48
  • Forest compensation of Rs.472 Crores were paid.
  • Land handed over to forest dept---3731 Ha
  • RR Packages are in advanced stage.

49
LAND ACQUISITION
  • Land to be acquired
  • Wet 11,920 Ha (29,454 Ac )
  • Dry 33,050 Ha (81,667 Ac )
  • Gardens 2,510 Ha ( 6,202 Ac )
  • Total 47,480 Ha (1,17,323 Ac )
  • Forest land 3223 ha

50
  • The Lift Irrigation schemes contemplated in
    Telangana Region upstream of Polavaram Project
    -
  • Pranahita Chevella 20,765 Cusecs
  • Kanthanapalli 10,000 Cusecs
  • Yellampalli 6,000 Cusecs
  • Devadula 5,000 Cusecs
  • Dummugudem 27,000 Cusecs
  • Indira Sagar LI Scheme 1,600 Cusecs
  • Rajiv Sagar LI Scheme 1,600 Cusecs
  • -------------------------
  • Total 71,965 Cusecs
  • ------------------------

51
  • The average monthly flows in River Godavari
  • September 60,000 Cusecs
  • October 30,000 Cusecs
  • November/December 10,000 Cusecs
  • January to May 3,000 Cusecs

52
  • The total proposed utilization inTelangana is
    71,965 c/s while the available flows in River
    Godavari are hardly 60,000 c/s in September,
    which dwindle down to 3,000 c/s from January to
    May.

53
  • If the Polavaram Project is not completed on
    priority well before the commissioning of the
    upstream projects, the entire delta of 10.20 L
    Acres under Godavari will be affected even for
    Khariff,forget about Rabi.

54
CONSEQUENCES If Polavaram project is not
completed as it is
55
  • 1) The concept of Inter Linking of Rivers will be
    defeated. (17 18 Links are in AP)
  • 2) No gravity flow for 7.2 L ac
  • of new ayacut.
  • 3) Without supplementation of 80 TMC of water,
    13.50 Lakh Acres of Krishna delta may not be
    stabilised.

56
  • 4) Without 24.0 TMC of
  • Water,the Industries in
  • and around Visakhapatnam
  • will be affected.
  • 5) There will be a severe set
  • back for drinking water
  • facility for Visakhapatnam
  • and enrouting villages.

57
  • 6) Ayacut of 8.0 L Acres of arid
  • and backward Uttarandhra
  • districts will be denied irrigation
  • water facility permanently.
  • 7) Ayacut of 2.0 L acres of upland
    West Godavari(Chintalapudi lift) will be denied
    Irrigation
  • 8) 960 MW of Eco friendly power production
    is not possible.

58
  • 9) Delta ayacut of 10.50 L acres of East and West
    Godavari districts may not have Rabi in future
    and even Kharif also may experience shortage of
    water from October onwards.
  • 10)Entire sea coast lands of East and West
    Godavari will become saline and may not be useful
    for Irrigation

59
  • . 11) Rayalaseema districts may not get benifit
    if linkage of rivers is not done.
  • 12) Set back for the proposed SEZ between
    KAKINADA and VIZAG.
  • 13).For new capital of AP Polavaram is the only
    source.
  • 14)

60
TASK AHEAD
  • 1.FINALISE ALL FORMALITIES WITHOUT ANY FURTHER
    DELAY AND COMPLETE THE WORK BY 2018
  • 2.SEE THAT THE ALLOCATION OF FUNDS TO COMPLETE
    THE PROJECT .
  • 3.POLAVARAM WATER ALLOCATION WAS REDUCED FROM
    301 TO 249 TMC. RESTORE IT 301 TMC.
  • 4.GET ALLOCATION OF 60 TMC OF WATER FOR
    UTTARANDHRA

61

5. PROTECT THE LOWER RIPARIAN RIGHTS OF KRISHNA
AND GODAVARI DELTA AYACUT AND SAVE IT FROM
BECOMING SALINE. 6. THE POLAVARAM PROJECT IS TO
BE COMPLETED IN ITS PRESENT FORM AND THE CONCEPT
OF BARRAGES MUST BE SHELVED. 7. GET BACK THE
BALANC 4(M) OF BHADRACHALAM Rev Div TO EAST
GODAVARI INCLUDING BHADRACHALAM TOWN. 8.
ALLOCATE 50 TMC of GODAVARI WATERS TO NEW AP
CAPITAL .
62
(No Transcript)
63
(No Transcript)
64
  • Yes it is true that 276 villages and 1 lakh
    people are being rehabilitated
  • When compared to the benefits of the project with
    good RR package this can be done

65
(No Transcript)
66
  • The maximum observed flood is 33 lakh cusecs and
    the project is designed for 36 lakh cusecs
  • The stability is checked for 50 lakhs PMF and
    there is no possibility even for that. This PMF
    is for once in 10000 years

67
(No Transcript)
68
(No Transcript)
69
(No Transcript)
70
  • 7.20 lakh acres of new anicut and 10.5 lakh acres
    stabilization is going to be benefited in both
    East and West Godavari districts
  • The project itself is in both the districts.
    Major benefits are for this two districts

71
(No Transcript)
72
  • No, if Polavaram is completed the flood waters
    going into the sea as waste will be utilized
    effectively by both Telangana and Andhra with the
    help of interlinking of rivers

73
(No Transcript)
74
REHABILITATION A good RR Package is being
implimented 1)2.5 ha of dry/1.25 ha of wet land
to land compensation for Tribals in notified
areas. 2)A house in 240 sq yds withRs
1,18,000/- 3)750 days wages 4)650 days
wages 5)500 days wages 6)Protection of their
fishing rights
75
(No Transcript)
76
Tehri dam and Nagarjunasagar
Tehri 860ft Nsagar 420ft Pol 175ft
77
(No Transcript)
78
(No Transcript)
79
Papikondalu submersion line 150 ft
80
(No Transcript)
81
conclusion
  • So, let us all fight unitedly for early
    completion of POLAVARAM project in its present
    shape to safe guard the present generation and
    future generations Interests
  • JAI
  • POLAVARAM
  • PROJECT