Title: Chongqing 2005 Key Data
1Chongqing 2005 Key Data
25 Years Plan By 2010
3Strategies to achieve the plan
- Enhance competitiveness of city
- Expand demand and consuming
- Optimize industry structure
- Ease the bottleneck of infrastructure and energy
supply - Strengthen HR development
- Speed up technical research (1.7 of GDP)
4Strategies to achieve the plan
- To move in service and move second industries out
from city center - To improve city infrastructure system
- Expressway to reach 1914Km, traveling from far
most town to downtown to be only 8 hours
(finally 4 hours only) - Railway to reach 1394 km
- Throughput of river port to reach 125M ton
(container cargo to reach 1.6M ton) - Power supply volume to reach 11000MGW
5Key Projects Expressway Network
- Construction of
- CQ-CD
- CQ-SH
- CQ-CS
- CQ-WH
- CQ-XA
- CQ-ZJ available already
6Key Projects Railway Network
- Construction of
- Wanzhou-Yichang
- Lanzhou-CQ
- Xiangfan-CQ
- Fuling-Lichuan
- CQ-Lanzhou
- CQ-Huaihua
- Xuling-CQ
- Ankang-Fengjie-Zhangjiajie-Changde
7Key projects River-route network
- To build up CQ as the shipping center of upstream
of Yangtze river - To improve 3 river routes along Yangtze, Wu and
Jialing rivers, with total river route to reach
4400km(??????1908??,????270??), finally 10000 ton
ship to reach CQ - To improve 35 ports(?????????????????????????????
???????) - Cuntan container port
- The first phase finalized on Jan. 6th 2006,
280000TEU achieved, to start the construction of
second phase, finally to achieve to 700000TEU.
8Key projects River-route network
9Key projects Airport
- To initiate the construction of No. 3 control
station and No.2 runway, passengers to reach 12M - To improve Wuqiao airport
- To build up Zhoubei airport
10Key projects Energy
- Power Generation and transmission
- 7 under construction(?????????????????????????????
?????????) - 4 under planning (???????????????????????)
- Others under planning (????,?????????,????????????
) - 500KV transmission and distribution
network(???????500????,?????????????????????????
?500???????,???500??????????????)
11Key projects Coal, natural gas, oil and water
- To increase coal mining about 10M
ton(?????????????????,????????????????????1000??)?
- To develop coal gas????????????
- To increase natural gas production, and speed up
the construction of transmission pipes network
and storage facility. - To support Petrochina to build pipe gas
transmission, increase supply volume.
(???-?????????) - To speed up the construction of oil transmission
pipe (??-??) - To increase water supply up to 5.5M ton per day
12Policy preferential-Industries
- 5 more development zones available
(?????????????????????????????????????????????) - 46 important industries with total 230B RMB
investment - Automotor, large equipment, resource processing
and high-tech.(??????) - Shoppingtrade, logistic, financing, real
estateconstruction, information, tourism and
culture - Agriculture industry(???????????)
13Policy preferential Auto motorcycle
- 60B RMB to inject in Auto and motorcycle
- Auto to reach 1.2M by 2010
- mini-car van,
- energy-saving and environment-friendly car
- middle-class car
- light truck
- heavy-truck
- more qualified parts suppliers
- Motorcycle to reach 9M by 2010
- RD of engine and key parts
- quality and effectiveness
14Policy preferential Advanced manufacture
industries
- 20B RMB to be injected
- 4 national RD centers
- Engine, environment-protection equipment,
instrument and apparatus - 4 Large equipment manufacturing industries
- Power transmission and distribution, Digital
machine, Electron telecommunication equipment,
Vessel - 6 products
- Light rail equipment, engineering machine and
large structure parts, hydro and wind power
generation equipment, medical equipment and
quality materials
15Policy preferential Resource-processing industry
- 120B RMB to be invested
- Chemical industry with natural gas as raw
materials - Large Aluminum project
- Manganese, strontium, barium and silicon
production - Develop energy-saving and environment-friendly
construction materials
16Policy preferential Hi-tech industry
- To inject 100B RMB and achieve to 150B RMB
turnover by 2010 - To focus on 6 fields, includes integrate circuit,
software and information service,
telecommunication and electron products, digital
instrument and apparatus, digital appliances - Biologic industry, includes Chinese medicine,
bio-medical engineering, bio-medicine, chemical
medicine materials, bio-agriculture. - New material industry, includes high-quality
structural materials, key materials and parts,
chemical materials and brand-new construction
materials - New energy, includes wind power, hydrogen and
bio-energy, solar and marsh gas energy
17Policy preferential Recycling industry
- To build up recycling production process
- To focus in metallurgy, power, coal, chemical,
construction materials and medical - To encourage recycling use of tyre, engine,
transmission gear-box, motor
18Policy preferential Logistics
- 5-year development plan of 3rd party logistic
- Infrastructure facility available
- To improve 3 logistic center further, which
includes Cuntan Port, Railway container station
and Jiangbei International Airport - To improve other regional logistic centers
19Policy preferential finance sector
- To encourage investment to banking sector
- More flexible when applying to open new branch or
to do RMB business - To encourage setting up non-banking finance
institutions, such as finance lease, fund and
financial companies - To encourage assets management and operation,
insurance agent and broker, pledge and evaluation
and other services