  • ARRA Policy Updates
  • Sacramento CA
  • August 19, 2009

2
Presenters
  • Jayson Wimbley
  • Kathy Ely
  • Dianna Molina
  • Kim Petz
  • Leslie Campanella

3
Agenda
  • ARRA Updates
  • Production Implementation
  • Policy Directives and Changes
  • Service Delivery

4
ARRA Updates
  • Section will cover
  • DOE Assessment Visit
  • DOE Expectations
  • DOE Implementation Challenges
  • Davis-Bacon Update

5
DOE Assessment Visit
  • Representatives from Secretary Chus office
    performed evaluation of CSD in July
  • Focus of visit
  • Collective readiness to administer ARRA
  • Identification of issues/barriers impeding
    collective efforts
  • Gather suggestions on how DOE can serve as a
    better resource
  • California classified as high-risk due to high
    funding levels

6
DOE Assessment Visit
  • Assessment reports to be issued to VP Biden
  • Plans to visit all states
  • Be prepared for similar visits in future
  • Four day visit included
  • Meetings with CSD management
  • Meetings with Governors staff
  • Conference call with the Energy Council
  • On-site visits to 7 agencies

7
DOE Expectations
  • Need for results by Obama administration have
    added more attention and visibility
  • High expectations to create jobs and produce
    units
  • Need to spend wisely and quickly
  • Accountability and transparency spotlight
  • Greater emphasis on quality of work

8
DOE Expectations
  • Separate tracking of DOE ARRA funds
  • To improve tracking, accountability and outcome
    measures
  • No leveraging of ARRA and regular DOE funding
  • Discouraged leveraging with any other funding
  • Develop more robust state oversight and
    monitoring efforts
  • Quarterly visits

9
DOE Implementation Challenges
  • Challenges conveyed to DOE
  • Impacts of Davis-Bacon on local job
    training/development and wx operations
  • Need for timely resolution of Davis Bacon and
    reporting requirements
  • Develop streamlined reporting
  • Contraction between states more deliberate,
    careful planning vs. federals spend and produce

10
Davis-Bacon Update
  • DOL survey conducted to establish new wage
    classification for weatherization workers
  • Anticipate preliminary results from DOL by
    mid-August
  • Classification will cover all general wx
    activities
  • Excludes specialty work to be covered under
    existing federal or state classifications for
    each county

11
Davis-Bacon Update
  • Not applicable to local government who have wx
    crews per DOE program guidance
  • Subcontractors
  • Must include DB language in bid solicitations and
    contracts 29CFR5.5(a)
  • Must include reference to wage determinations
  • Must check subcontractor status on excluded party
    list (debarment) at www.epls.gov

12
Davis-Bacon Update
  • Compensation for workers
  • Must be paid at least once a week
  • Must be compensated at rate specified for each
    classification at time of performance
  • Reporting and recordkeeping
  • Required to submit certified payrolls and
    statement of compliance to CSD weekly
  • Form WH-347 or equivalent will be required
  • Records must be maintained for 3 years

13
Davis-Bacon Update
  • Must post DB poster at worksite in prominent
    place
  • Poster available online at www.dol.gov
  • Wage determination must be included
  • CSD seeking additional guidance and available DOL
    trainings
  • www.dol.gov/esa/whd/regs/compliance/posters/fedpro
    jc.pdf

14
Production Implementation
  • Section to cover
  • ARRA Contract
  • ARRA Local Plan
  • ARRA Reporting
  • Risk Assessments
  • Training Update

15
ARRA Contract
  • Will include provisions for direct wx service
    activity and budget augmentation for next 40
    grant funding
  • Issuance contingent on
  • Submission of local plan amendments
  • Outcome of CSD internal risk assessment
  • May include special scope of work provisions or
    other special conditions as result of risk
    assessment

16
ARRA Contract
  • Delay in release of regular 2009 DOE contract
  • Considering extending regular 2009 DOE contract
    term

17
ARRA Local Plan
  • Purpose to obtain accurate picture of current
    planning efforts
  • Expanded to capture
  • Details on specific plans to achieve goals
  • What progress has been made
  • Will be incorporated into September production
    contract
  • Due date 8/31/09

18
ARRA Local Plan
  • Future revisions allowed for impacts to planning
  • Prevailing wage classification determination
  • Priority list approval
  • Other reporting and program requirement changes
  • 3,154 per unit cost for temporary planning
    purposes only
  • DOE noted great variances of cost per unit
    between agencies

19
ARRA Reporting
  • First quarterly report due October 10th to Office
    of Management and Budget (OMB)
  • All agency data is submitted to CSD by the 5th
  • CSD enters into California ARRA Accountability
    Tool (CAAT) and DOE WinSAGA database
  • Data transferred to OMB FederalReporting.gov
    through CAAT

20
ARRA Reporting
  • Reporting tools at all levels under development
  • CSD awaiting direction and IT architecture from
    State Chief Information Officer (CIO) who is
    awaiting direction and architecture from OMB
  • Look to future blog entries for further reporting
    data requirements and guidance

21
ARRA Reporting
22
ARRA Reporting
23
Risk Assessments
  • Conducting internal and external assessments to
    identify areas of risk
  • Carried out jointly by internal audits and
    program divisions
  • External assessments will target all recipients
    of ARRA funding
  • Additional review for agencies receiving larger
    amount of funds

24
Risk Assessments
  • Includes review of
  • Prior findings and corrective actions
  • Performance under 2009 LIHEAP and 2008 DOE
    contracts
  • Compliance with required wx measure/diagnostic
    performance standards
  • Work quality
  • Key staff vacancies
  • Late reporting
  • Use of subcontractors

25
Risk Assessments
  • Follow-up by field reps to bring issues to
    closure and/or develop corrective work plan
  • Consideration for corrective work plan added to
    contract
  • Added deliverables, performance and compliance

26
Risk Assessments
  • Example
  • Significant expenditure underperformance under
    2009 LIHEAP contract
  • Added special conditions to contract
  • Must foster partnership with strong contractor to
    increase capacity
  • Subject to stricter monitoring and additional
    reporting to gauge performance

27
Training Update
  • Funding to Stockton and San Bernardino Training
    Centers to expand capacity
  • Funding for establishment of CAA Butte Green
    Training Center
  • Hosting CSD wx training curriculum
  • Online in 30 45 days

28
Training Update
  • Assessor and inspector field training
  • Need names of field supervisors, assessors and
    inspectors from agencies to facilitate scheduling
  • Will be provided in small regionalized groups
  • Training provided over 7 weeks to facilitate
    immediate need
  • Ongoing training in future

29
Training Update
  • Subcontractor procurement and monitoring
  • Toolkit being created for guidance
  • Will include but not be limited to
  • Process flowchart
  • Qualification checklist
  • RFQ and contract shell
  • Insurance information

30
Policy Directives and Changes
  • This section will cover
  • Contract Advancements
  • Major Purchase Advancements
  • Vehicle Purchases and Leasing
  • Reimbursement Reporting
  • Income Eligibility

31
Contract Advancements
  • Applicable to all CSD energy programs
  • Limited to 25 advance with 6 month repayment
    period
  • Schedule determined by mutual agreement between
    CSD and service provider
  • Payback no less than 30 by 3rd month
  • Payback in full by 6th month
  • All advances must accompanied by full explanation
    of purpose and need

32
Major Purchase Advancements
  • Special advance may be requested under all CSD
    energy programs
  • Provisions include
  • Limited to purchases over 5,000
  • 558 process and DOE approval must be completed
  • Documentation of open and competitive bid process
    included in 558 process
  • Major administrative and program purchases will
    be liquidated upon 1st expenditure report period
    following date of purchase

33
Major Purchase Advancements
  • Will only be granted if
  • No less than 50 of initial capital advance has
    been paid back and
  • Total amount of all outstanding balances never
    exceeds 25 of remaining contract balance
  • Unless total of original capital advance plus
    major purchase advance request does not exceed
    25 contract advance maximum

34
Major Purchase Advancements
  • More scrutiny being placed on purchases under
    LIHEAP
  • Must indicate if such purchases will benefit
    LIHEAP exclusively
  • If not, must allocate share of cost appropriately
    to all direct benefiting programs
  • Future monitoring to include review of vehicle
    and equipment usage under all CSD programs

35
Vehicle Purchases and Leases
  • Vehicle leasing encouraged over purchasing
  • DOE and State Stimulus Task Force
  • Due to limited term of ARRA
  • Purchasing may be more cost effective under
    certain circumstances
  • Exemptions offered but bar will be high
  • Submit written request with complete
    justification
  • Financial analysis to support benefits

36
Reimbursement Reporting
  • Reporting at actual cost required in DOE and
    LIHEAP contracts
  • Abolishment of fixed fee measures and approved
    labor rates
  • Actual labor hours requirement remains
  • Documentation in client files of time on jobsite

Timesheet
Job Schedule
Client File
37
Income Eligibility
  • Federal Law Title 42 Chapter 94
  • State may apply procedures/policies consistent
    with agency administering program
  • Not to exceed greater of 150 of Federal poverty
    level or 60 of state median income
  • Implementation of statewide methodology for
    calculating partial income
  • 1 weekly paystub X 4.333
  • 1 bi-weekly paystub X 2.167
  • Incomes not to be annualized

38
Income Eligibility
  • New exclusions to income
  • Student assistance including grants and work
    study
  • Income of live-in aid or amounts paid by State to
    family member for cost of services/equipment to
    keep disabled member at home
  • Income from children including foster children
    under 18 years of age
  • Payments for care of foster children or foster
    adults unrelated to occupant family and unable to
    live alone

39
Service Delivery
  • Section to cover
  • Assessments
  • Energy Audit and Priority List
  • Quality Assurance
  • Refrigerator Replacement

40
Assessments
  • New statewide assessment form under DOE and
    LIHEAP to standardize process and assure quality
  • Measure installation deviating from original
    assessment must be documented
  • Form not used for job costing purposes
  • Assessors must be independent of installers
  • Specific training requirements for all assessors
  • Developed around assessment form

41
Energy Audit and Priority List
  • Expanded priority list to be used
  • Energy audit required after priority list
    exhausted
  • Priority given to units with most
    energy-efficiency needs under ARRA
  • Intake/outreach/assessment strategies must be
    modified to effectively target greater need
  • Analysis of LIHEAP measures for re-prioritization

42
Quality Assurance 3rd Party
  • Increase in scope and frequency of 3rd party
    inspections
  • Scope expanded to include
  • Issuance of customer satisfaction surveys
  • Greater emphasis on evaluation of internal
    quality assurance systems
  • Monitoring of subcontractor activities and work
    quality
  • Expanded file reviews for compliance with WIS and
    PPs

43
Quality Assurance - Agency
  • 100 post-wx inspection for all ARRA units
  • 25 rate for LIHEAP and DOE regular
  • Will enhance current LIHEAP post-wx inspection
    model
  • Inspectors must be independent of installers
  • Specific training requirements for all inspectors

44
Refrigerator Replacement
  • Pending DOE approval
  • Pre-1993 units
  • Must be metered if not verified through database
    or other resource
  • Post-1992 units and at least 10 years old
  • Can be replaced only if metering determines
    inefficiency
  • Metering takes at least 2 hours
  • Part of assessment process
  • 10 DOE metering requirement must be met
Write a Comment
User Comments (0)
About PowerShow.com