National Readjustment
  • Kathy Milbert

2
The National ReadjustmentGeneral Comments
  • The CORS will provide the control
  • Only GPS projects will participate
  • The FBN/CBN Surveys are a key element since these
    are high accuracy (2 cm) surveys that tie the
    HARN to the CORS throughout the contiguous United
    States
  • An adjustment analysis of each GPS project that
    contributes to the National Spatial Reference
    System is required prior to the National
    Readjustment

3
The National ReadjustmentMore Comments
  • Statewide GPS Readjustments provide extra
    information about the network on a state by state
    basis
  • A readjustment plan that properly classifies all
    GPS projects comprising the network is required

4
FBN/CBN Surveys
  • Status
  • Observations complete for 48 contiguous states
    and the District of Columbia
  • Reductions Adjustment complete for 43 States
    and the District of Columbia
  • IN, OH, KY, TN, MO to go
  • VA needs to be re-processed (Leica SR399
    Antennas)

5
Project Adjustment Analysis
  • 3065 Projects complete
  • Free Adjustment
  • Residual Plot
  • Outliers Rejected
  • Connectivity to A/B Order Network Verified
  • Summary sheet with Project Information Created
  • 59,395 stations

6
A lot of projects
7
Statewide GPS Readjustments
  • Complete for 36 of 43 States and DC
  • Readjustment of EHs and/or Positions (5cm
    tolerance)
  • Layered Adjustment Approach Used
  • States not Completed
  • MN GA-Met 5 cm tolerance set by ESC
  • CA-Requires special analysis
  • SD, IL, KS IA-Recently loaded

8
Centralization of Project Information
  • Master File Created
  • Information from Individual Projects
  • Information from State GPS Readjustment

9
Example
  • OBS_SOURCE A B 1
  • ------------- --- --- --- ND HARN-B
    Order-1996- Excellent residuals-3 cm or
    less
  • GPS1048/B 2 6 0 MN No GPS readjustment
    performed in this state
  • GPS1048/B 2 6 0 SD
  • GPS1048/B 5 39 0 ND Level 2 of 3 in ND
    GPS readjustment
  • GPS1048/B 6 2 0 MT All either in FBN
    or in ID/MT HARN-Not included in ID/MT
    GPS Readjustment

10
Concept of Operation
  • Adjust software will be used
  • Layered Approach (except possibly CA)
  • National Layers (Higher Order Projects)
  • Regional Layers (UDN/First Order or Lower)
  • Coordinates Produced and Published for both NAD83
    (NSRS) and ITRF
  • Adjustment in NAD83-Transformed to ITRF
  • Canadian Data Integrated at FBN/CBN Layer
  • Network and Local Accuracies also Produced

11
Local and Network Accuracies
  • Local Accuracy of a control point
  • A value that represents the uncertainty of its
    coordinates relative to other directly connected,
    adjacent control points at the 95-percent
    confidence level
  • An approximate average of the individual local
    accuracy values between this control point and
    other observed control points used to establish
    its coordinates

12
Local and Network Accuracies
  • Network accuracy of a control point
  • A value that represents the uncertainty of its
    coordinates with respect to the geodetic datum at
    the 95-percent confidence level
  • Datum is considered to be best expressed by the
    Continuous Operating Reference Stations (CORS)
  • Local and Network accuracy values at CORS sites
    are considered to be infinitesimal (approach
    zero)
  • These accuracies will be implemented with the
    National Readjustment

13
National Layers
  • N0-The National CORS coordinate set
  • N1-The FBN/CBN projects (3209 stations)
  • N2-A B Order projects with CORS ties (2203
    stations)
  • FAACORS-FAA projects with CORS ties (2288
    stations)
  • N3-A Order projects without CORS ties (292
    stations)
  • N4-B Order projects without CORS ties (6169
    stations)
  • N5-Combination B 1st Order projects without
    CORS ties
  • and 1st Order Projects with CORS ties (3721
    stations)
  • AIR-Lower Order FAA Projects without CORS ties
    (7593 stations)

14
Regional Layers
  • UDN Projects (First and Lower)
  • 7 Geographic Regions
  • 3 Categories
  • R1-Recent (Post 1992)-Residuals Under 7 cm
  • R2-Residuals Under 15 cm
  • R3-Either Large Residuals or Weak Geometry but
  • with some redeeming value to the
    community

15
Region 1
  • Florida Alabama and Georgia
  • Proj R1 Sta R1 Proj R2 Sta R2 Proj R3
    Sta R3
  • FL 63 2693 13 1280 14
    1002
  • AL 0 0 34 3584 0
    0
  • GA 9 644 3 201 2
    227
  • 72 3337 50 5065 16
    1229

16
Region 2
  • North Carolina and South Carolina
  • Proj R1 Sta R1 Proj R2 Sta R2 Proj R3 Sta R3
  • SC 44 1826 13 1142 8 575
  • NC 75 3315 11 568 6 154
  • 119 5141 24 1710 14 729

17
Region 3
  • VA, MD, DC, DE, WV, NJ, PA, NY, CT, MA, RI, NH,
    VT ME
  • Proj R1 Sta R1 Proj R2 Sta R2 Proj
    R3 Sta R3
  • VA 14 966 3 65 10
    547
  • MD 27 1406 5 304
    5 32
  • DC 1 11 1 11 0
    0
  • DE 1 8 0 0 0
    0
  • WV 1 20 0 0 1 7
  • NJ 33 1199 2 21 0
    0
  • PA 12 267 0 0 2
    87
  • NY 4 637 2 31 0
    0
  • CT 0 0 0 0 0 0
  • MA 2 31 0 0 0 0
  • RI 3 87 0 0 0
    0
  • NH 0 0 0 0 0 0
  • VT 10 613 0 0 0 0
  • ME 3 40 0 0
    0 0
  • 111 5285 13 432 18
    673

18
Region 4
  • MS, LA, AR, TN, KY, MO, IL, IN, OH, MI, WI IA
  • Proj R1 Sta R1 Proj R2 Sta R2
    Proj R3 Sta R3
  • MS 2 34 1 16
    0 0
  • LA 6 170 2 453
    9 304
  • AR 1 88 0 0
    1 260
  • TN 0 0 3 227
    0 0
  • KY 3 406 4 129
    0 0
  • MO 4 504 5 106
    1 143
  • IL 22 998 3 291
    1 344
  • IN 0 0 2 14
    0 0
  • OH 25 1653 10 760
    5 248
  • MI 13 421 12 276
    1 88
  • WI 6 540 2 118
    0 0
  • IA 1 16 0 0
    0 0
  • 83 4830 44 2390
    18 1387

19
Region 5
  • TX, OK, KS, NE, SD, ND MN
  • Proj R1 Sta R1 Proj R2 Sta R2 Proj
    R3 Sta R3
  • TX 3 166 2 175
    2 35
  • OK 0 0 0 0
    1 23
  • KS 0 0 1 73
    0 0
  • NE 0 0 0 0
    0 0
  • SD 1 28 0 0
    1 11
  • ND 2 26 0 0
    1 45
  • MN 81 3636 1 16
    3 143
  • 86 3856 4 264
    8 257

20
Region 6
  • NM, AZ, CO, UT, NV, WY, MT, ID, OR WA
  • Proj R1 Sta R1 Proj R2 Sta R2
    Proj R3 Sta R3
  • NM 3 185 0 0
    0 0
  • AZ 1 25 5 227
    1 30
  • CO 60 1155 7 198
    6 139
  • UT 0 0 0 0
    3 36
  • NV 0 0 0 0
    0 0
  • WY 0 0 0 0
    1 6
  • MT 8 46 5 29
    1 5
  • ID 4 25 3 42
    1 22
  • OR 3 19 0 0
    3 74
  • WA 8 530 1 46
    5 150
  • 87 1985 21 542
    21 462

21
Region 7
  • California
  • Requires separate analysis
  • Projects not yet included in Master Plan Yet
  • Breakdown
  • Number of Projects Number of Stations
  • N2 24 355
  • FAACORS 25 84
  • N3 1 9
  • N4 14 258
  • N5 23 335
  • AIR 49 273
  • UDN 70 1529

22
TRASH
  • Projects Not Recommended for Inclusion
  • 149 Projects with 9903 stations
  • Many Third Order FAA Projects from 1980s
  • Some Projects that have no ties to the Network
  • Includes Original TN HARN (Macrometer Data)
  • Included Original Eastern Strain Network Project

23
Ongoing Tasks
  • Project Level Analysis (Free Adjustments)
  • State GPS Readjustments (as required)
  • Master Plan Updates-Layer Assignments
  • Airport Layer Verification

24
New Tasks
  • California Data Analysis
  • Identify and Resolve Project Weighting Scheme
    Deficiencies
  • Facilitate the Implementation of Local and
    Network Accuracies in the National Readjustment

25
Time-line for National Readjustment
  • Proposed starting date June 2005-Some unexpected
    but reasonable delays have been factored in
  • Time-lines for new tasks are flexible but
  • MUST BE COMPLETED BY JUNE 2005
  • OR
  • NATIONAL READJUSTMENT ALSO DELAYED

26
Contingency Option
  • In case of large delays in New Tasks/Software
  • Perform Statewide GPS Readjustments of both
    horizontal positions and ellipsoid heights
  • Approved by Executive Steering Committee on
    September 24, 2003

27
Time-line for National Readjustment Positions
and Ellipsoid Heights
  • All new tasks completed by 06/2005
  • National Layers
  • N1-06/2005-12/2005
  • N2 FAACORS-01/2006-02/2006
  • N3-03/2006
  • N4-04/2006-05/2006
  • N5-06/2006-07/2006
  • AIR-08/2006-10/2006

28
Time-line for National Readjustment
Positions/Ellipsoid Heights (continued)
  • Regional Layers
  • Layers 1-7 (6 weeks for each region)
  • November 2006 through September 2007
  • Project Report
  • 3 Months-October 2007 through December 2007
  • Could be sped up by using more personnel-Up to 3
    regions could be worked on simultaneously

29
Time-line for Project Submissions
  • Higher Order Projects
  • Stop 2 months prior to the completion of N1
  • Proposed November 1, 2005
  • Resume after all national layers are complete
  • Proposed November 1, 2006
  • Lower Order Projects (UDN)
  • Stop 6 weeks prior to the start of a region
  • Resume after a region is complete

30
Post National Readjustment
  • A transformation model for classical non-GPS
    stations and GPS stations that were excluded from
    the National Readjustment will be needed
  • New adjustment procedures need to be developed
    that incorporate local and network accuracies
  • Areas outside the contiguous US may need to be
    readjusted (ie Alaska Hawaii)
  • A reference frame maintenance strategy (NAD83,
    ITRF, either or both) needs to be developed

31
THATS ALL FOLKS !!!