Title: Magnetic Measurements: status report and future challenges
1Magnetic Measurementsstatus report and future
challenges
f
- Hank Glass, Fermilab
- Provocateur talk, Working Group T2 (Magnets)
- Snowmass, July 2001
- with J. DiMarco, P. Schlabach, G. Velev
2Outline
- Brief overview of activities at Fermilab
- Probes harmonics coils, stretched wire
- Magnet projects
- LHC, VLHC Stage-1 and Stage-2, NLC
- Future plans and challenges
- Subgroup tasks
3New/Improved measurement tools
- New test stand for superfluid He tests of LHC
quads - New rotating coils with new measurement software
(object-oriented) - Single-stretched wire (ssw) for integral strength
and alignment
4MQXP001 on Stand 4
First full-length prototype of LHC IR triplet
Q2 Two thermal cycles so far, 3rd TC begins mid
July (now) Magnetic measurements and quench
testing done below l point (? 2 K)
53-segment Harmonics Coilfor LHC IR Quad
Q2P1
- 3.688 m
- 5.948 m
- 8.522 m
- 9.591 m
Q2P1
Q2P1
Q2P1
6Harmonics-comparison of MQXP001 with short models
1.500
1.000
q2p1
0.500
Model magnets
0.000
-0.500
-1.000
a10
b3
b4
b5
a6
a8
a9
b7
a4
b6
b8
b9
a7
b10
a3
a5
7Single Stretched Wire System (SSW)
- Single (100mm) wire stretched between precision
x-y stages with 1mm accuracy linear encoders. - Integrator measures flux change caused by wire
motion - flux change same for /- wire motions
when wire centered in quadrupole. - Measurement of true axis (not just average) with
co- and counter-directional stage motions. - Stages have laser tracker target fiducial mounts
referenced to wire. - Adjustable wire tensioning for removal of effects
from sag
- Uses include MIQ, LBQ, spool, LHC HGQ, and
NLC prototype alignment measurements
8SSW schematic for LHC quad
MQXP01
3.6 m
8.6 m
5.5m
17.7 m
9SSW NLC Permanent Magnet Measurements
Stability(also see presentation by Kashikhin)
10Measurements of VLHC Stage-1 magnets
- Arc dipole physical properties (interesting from
measurement point of view) - length 65 m
- aperture vertical gap 20 mm
- Gradient 4.7 (arc dipoles), 9.4 (dispersion
supp.) - C-magnet design allows probe insertion from side
- Warm testing (100), cold testing (10?)
- Other magnets for Stage-1 present no significant
measurement challenges
11VLHC Stage-1 dipole measurement concept
Rotating coil positioned by precision
strong-back See VLHC Design Study, Section 5.1.7
for details
12Vertical Magnet Test Facility (VMTF)
- VMTF operating parameters
- Toper 1.8 - 4.5 K
- Ioper 0 - 18.8 kA, upgrade to 30 kA in progress
- Magnet length up to 4 m
- He volume - 800 liters
- tested LHC models (1999-2000)
- High Field (Nb3Sn) model tests
- cos ? magnet, June 2001
- Racetrack coil, July 2001
- 2nd cos ? magnet in Sept.
- 1st common coil magnet in Oct.
13VMTF On-line Operations Display
14Magnetic measurement activities at other
laboratories
Volunteers welcome to give status talks!
15Organizing magnetic measurements subgroup
- Please join!
- Develop subgroup schedule
- Discuss measurement issues for future machines
- Write subgroup report
16Challenges and Issues
- What are the difficulties facing measurements of
- NLC magnets, especially main linac quads with 1
mm center stability requirement - VLHC Stage-1 and Stage-2 arc magnets
- Muon collider or neutrino factory magnets Other
magnets for other machines/detectors - What are drivers for future improvements in
magnet measurement technology?