PCB Manufacture -pcb4u.com. Hardware Design Milestones. Schematic Capture Complete (Feb. 14th) PCB Layout Complete (Feb. 25th) PCB Manufacture (Mar. 6th) ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 15
Provided by: csUi
Category:

less

Transcript and Presenter's Notes

Title: Senior Design Abstract Presentation


1
Senior Design Abstract Presentation
Spring 2003 Luke Hirschy Michael Ihde Chris Weis
2
Schedule
3
Hardware Block Diagram
4
Memory Map
5
Hardware Design Tools Resources
  • Schematic Capture Eagle
  • PCB Drafting Eagle
  • Block Diagrams Dia
  • PCB Manufacture -pcb4u.com

6
Hardware Design Milestones
  • Schematic Capture Complete (Feb. 14th)
  • PCB Layout Complete (Feb. 25th)
  • PCB Manufacture (Mar. 6th)
  • Build and Test (Mar 20th)

7
Hardware Considerations
  • All major parts have been ordered.
  • References designs exist that will help guide
    hardware development.
  • Estimated cost per board - 100

8
VHDL Input Block Diagram
9
VHDL Output Block Diagram
10
VHDL Tools
  • VHDL-GUI (vgui) a free graphical tool for
    capturing, drawing, editing, and navigating
    hierarchical block-diagrams, and for producing
    corresponding structural VHDL code.
  • DIA - gtk based diagram creation program, used
    to create flow-charts and block diagrams.
  • ModelSim VHDL compiler and simulator
  • MAXPLUS II Altera design software

11
VHDL Schedule
  • FIFO VHDL complete ( Feb. 7th )
  • MAS Interface VHDL complete ( Feb. 14th)
  • Micro-controller Interface complete ( Feb. 21th)
  • Test and simulation of VHDL complete ( Feb.
    28th)

12
Software Block Diagram
13
Software Tools
  • Linux Java SDK
  • TINI SDK 1.11
  • Netbeans
  • ISC DHCP Server
  • Tftp server
  • CVS client/server
  • Dia diagram editor
  • Note All of the above are OSS packages

14
Software Milestones
  • Design of software core application finished (
    Feb. 20th )
  • Sample application running on TINI development
    board ( Feb. 26th )
  • Alpha tests of system/application software (
    Mar. 19th)
  • Sys./App. software functional and ready for
    integration ( Apr. 8th)