Engine Nacelle Halon Replacement
2
PRESENTATION CONTENTS
  • OVERVIEW OF PENDING ANALYSIS FOR THE
    OVER-PRESSURE BEHAVIOR IN THE NACELLE FIRE
    SIMULATOR
  • BRIEF DESCRIPTION OF PROBLEM
  • DESCRIPTIONS OF MODIFICATIONS TO TEST FIXTURE
  • NEW TELEMETRY
  • DUCT INTERFACE BOX
  • TEST PLAN
  • INITIAL OBSERVATIONS
  • GENERIC STATUS
  • TESTING REMAINING
  • TABLE OF CALCULATED EQUIVALENT CONCENTRATIONS

3
OVER-PRESSURE ANALYSIS
  • PENDING OVER-PRESSURE ANALYSIS

4
OVER-PRESSURE ANALYSIS - OVERVIEW
  • DURING TESTING WITH 2-BTP HFC-125 ANOMOLOUS
    BEHAVIOR WAS NOTED IN THE TEST FIXTURE
  • BEHAVIOR CHARACTERIZED AS AN OVER-PRESSURE AT AN
    ATMOSPHERIC GAP IN THE FIXTURE
  • WORST-CASE EXAMPLE RESULTED IN FIREBALL AUDIBLE
    SIGNATURE
  • NO TELEMETRY ORIGINALLY LOCATED IN REGION OF
    INTEREST
  • TEST FIXTURE HAS BEEN MODIFIED TO ALLOW
    COLLECTION OF PERTINENT DATA
  • DATA TO BE COLLECTED AND SCRUTINIZED TO ASSESS
    MAGNITUDE AND ATTEMPT AN UNDERSTANDING

5
OVER-PRESSURE ANALYSIS, PERTINENT TEST FIXTURE
GEOMETRY
AIR FLOW
6
OVER-PRESSURE ANALYSIS, PERTINENT TEST FIXTURE
GEOMETRY
7
OVER-PRESSURE ANALYSIS FIXTURE MODIFICATIONS
  • ADDED 4 THERMOCOUPLES IN RED DUCT
  • ALL ALONG 1200
  • STARTED 2 FEET IN FROM INLET, PLACED EVERY 2 FEET
  • BEADS ARE 8 INCHES OFF WALL
  • ADDED 2 STATIC PRESSURE MEASUREMENT LOCATIONS
  • 0-5 H2O PSID (REFERENCE TO TEST BAY)
  • 1 POINT IN TEST SECTION, 0300, STA 522
  • 1 POINT IN RED DUCT SECTION, 0430, 21 INCHES IN
    FROM INLET
  • USING STATIC PORTS OFF 1/8OD PITOT-STATIC TUBES
    INSERTED INTO FLOW FIELD

8
OVER-PRESSURE ANALYSIS FIXTURE MODIFICATIONS
  • ADDED 4 OPTO-ELECTRONIC DEVICES TO DETECT FLAME
    PROPRAGATION THROUGH TEST FIXTURE
  • PHOTODIODE PHOTOCONDUCTIVE CIRCUITS
  • SENSOR VALUES
  • ? 0 VDC, DARK/NO FIRE
  • ? 6.1 VDC, SATURATES WHEN VIEWING FLAMES OF TEST
    FIRE
  • 1 VIEWS TUBE ARRAY IN FIRE ZONE
  • REMAINING 3 LOOK AT 1200
  • ENTRANCE TO EXHAUST NOZZLE
  • EXIT OF EXHAUST NOZZLE
  • RED DUCT
  • A BOX IS BEING FABRICATED WHICH WILL CLOSE OUT
    THE DUCT INTERFACE COMPLETELY

9
OVER-PRESSURE ANALYSIS, TELEMETRY LOCATIONS
STA 502
STA 527
STA 551
10
OVER-PRESSURE ANALYSIS TEST PLAN
  • PURPOSE
  • TO CAPTURE THE ENVIRONMENT OF THE OVER-PRESSURE
    PRODUCED BY HFC-125
  • TO CAPTURE THE ENVIRONMENT AS PRODUCED BY HALON
    1301
  • CHARACTERIZE THE MAGNITUDE OF THE ENVIRONMENT
  • ATTEMPT TO TO UNDERSTAND THE PHENOMENA
  • PLAN
  • FIRE TEST WITH HFC-125 IN CONFIGURATIONS WHERE
    OVER-PRESSURES WERE PREVIOUSLY OBSERVED
  • FIRE TEST WITH HALON 1301 IN THE SAME CONDITION
  • RUN EACH AGENT WITH WITHOUT THE DUCT INTERFACE
    BLOCKED OUT
  • MULTIPLE OVER-PRESSURES WILL BE CAPTURED
  • MULTIPLE HALON 1301 FIRE TESTS PLANNED TO CAPTURE
    BEHAVIOR
  • EXACT TEST COUNT TBD

11
OVER-PRESSURE ANALYSIS INITIAL OBSERVATIONS
  • THE FOLLOWING GRAPHS ILLUSTRATE SOME OBSERVATIONS
  • BASED ON 1.0 lbm/s 260F VENTILATION, 0.25 GPM
    OIL SPRAY FIRE, HFC-125 AT equivalence
  • THE FOLLOWING BEHAVIORS WERE OBSERVED
  • THIS TEST VISUALLY PRODUCED A MINOR
    OVER-PRESSURE
  • GRAPH OF FIRE IGNITION, INITIAL VS. REIGNITION AT
    COMPLETION OF REIGNITION TIME DELAY (RTD)
  • FLAME FRONT PROPAGATION IS QUICKER DURING INITIAL
    IGNITION
  • FIRE GROWTH IS QUICKER DURING REIGNITION
  • STATIC PRESSURE PULSE IS LARGER FOR REIGNITION
  • STATIC PRESSURE PULSE IS FRACTIONAL INCH
    MAGNITUDE
  • GRAPH OF THE COMPLETE REIGNITION TIME DELAY
  • FLAME EXTINCTION AT RTD ONSET DOES NOT PROGRESS
    LOGICALLY
  • FLAME REIGNITION AFTER RTD PROGRESSES LOGICALLY
  • STATIC PRESSURE HAS GREATER PULSE DURING FIRE
    REIGNITION THAN DURING AGENT DISCHARGE
  • GRAPH OF OVERALL TEMPERATURE BEHAVIOR INDICATES
    NOTHING UNUSUAL

12
OVER-PRESSURE ANALYSIS INITIAL OBSERVATIONS,
FIRE IGNITION
13
OVER-PRESSURE ANALYSIS INITIAL OBSERVATIONS,
COMPLETE RTD
14
OVER-PRESSURE ANALYSIS INITIAL OBSERVATIONS
15
OVER-PRESSURE ANALYSIS INITIAL OBSERVATIONS
  • THERE ARE NO CONCLUSIONS TAKEN FROM THIS ONE
    TEST, JUST OBSERVATIONS
  • MORE TESTING TO BE COMPLETED PRIOR TO ANALYSIS

16
CONCLUSION
  • SUMMARY/STATUS

17
CONCLUSORY STATEMENTS
  • TESTING REGARDING CHARACTERIZING OVER-PRESSURE
    BEHAVIOR REQUIRES COMPLETION
  • REMAINING CF3I EQUIVALENCE ITERATIONS WILL FOLLOW
  • POOL FIRE WORK
  • SPRAY FIRE WORK
  • COLD AGENT TESTING

18
RESULTS TO DATE - TABULAR