ESF 3 Response Pamphlet
Acronyms
Planning and Response Teams By Type/Division
ACI Advance Contract Initiative CDRG
Catastrophic Disaster Response Group DCO
Defense Coordinating Officer DFA Direct Federal
Assistance DFO Disaster Field Office DOMS
Director of Military Support DSO Disaster
Safety Officer DTOC Deployable Tactical
Operations Center DTOS Deployable Tactical
Operations System EEI Essential Elements of
Information EFO Emergency Field Office ERRO
Emergency Response Recovery Office ERT
Emergency Response Team ERT-A Emergency
Response Team Advanced ERT-N National
Emergency Response Team ESF Emergency Support
Function EST Emergency Support Team FCO
Federal Coordinating Officer FOS Federal
Operations Support FRP Federal Response
Plan GAR Governors Authorized
Representative JIC Joint Information Center JTF
Joint Task Force LERT Logistics Emergency
Response Team MA Mission Assignment MCC
Mission Coordination Center MERS Mobile
Emergency Response Support PDA Preliminary
Damage Assessment PRT Planning and Response
Team RFA Request for Federal Assistance RISC
Regional Interagency Steering Committee RNA
Rapid Needs Assessment ROC Regional Operations
Center RRV Rapid Response Vehicle SCO State
Coordinating Officer TA Technical
Assistance TLC Territorial Logistics Center
US Army Corps Of Engineers Memphis District
2
FEMA FEDERAL RESPONSE PLAN ESF 3
MISSIONS (PUBLIC LAW 93-288)
PRE-SCRIPTED MISSION ASSIGNMENTS UNDER FRP
  • Damage/needs assessment
  • Debris clearance/removal
  • Construction of temporary access routes
  • Emergency restoration of public utilities
    including water supply and wastewater treatment
  • Provision of emergency electrical power to public
    facilities
  • Humanitarian support including provision of ice,
    water, portable toilets, temporary housing, and
    temporary roof repair
  • Technical assistance including structural/habitabi
    lity inspections
  • Engineering support to other ESFs
  • Preparation of preliminary damage assessments and
    damage survey reports (recovery missions)

PRE-DECLARATION
POST-DECLARATION
  • REGIONAL ACTIVATION
  • ROC/ERT-A 25K
  • Prime Power LERT 50K
  • DTOC 70K
  • RRV Support 20K
  • ERRO Site ID 25K
  • ACI Contractor Support 25K
  • National Activation ESF 3 25K
  • WATER 125K (25K PRT activation, 100K
    procurement transportation of water)
  • ICE 125K (25K PRT activation, 100K
    procurement transportation of ice)
  • EMERGENCY POWER 125K (25K PRT activation,
    100K TLC/Remote Storage Site, transportation of
    generators)
  • DEBRIS 25K (Activate and pre-position
    management element of the PRT)
  • TEMPORARY ROOFING 25K (Activate and
    pre-position management element of the PRT)
  • TEMPORARY HOUSING 25K (Activate and
    pre-position management element of the PRT)
  • Activation ESF 3 Regional 200K FOS
  • Activation ESF 3 National 50K FOS
  • Technical Assistance to the State 100K TA
  • WATER 1M DFA
  • ICE 1M DFA
  • EMERGENCY POWER 1M DFA
  • DEBRIS 5M DFA
  • DEBRIS OVERSIGHT 500K FOS
  • TEMPORARY ROOFING 3M DFA
  • TEMPORARY HOUSING 25K FOS (Activate and
    pre-position management element of the PRT)
  • TEMPORARY HOUSING 3M FOS (100 Federal
    funding for transport setup)
  • TEMPORARY HOUSING 3M DFA (Cost shared with
    state 75/25, includes site development and
    construction at group sites)
  • ERRO Operations 1M FOS (Funding for leasing
    space, furniture, supplies, equipment)

USACE CIVIL WORKS MISSIONS (PUBLIC LAW 84-99)
  • Recovery/reconstitution of Corps offices
  • Flood response operations
  • Inspection of civil works projects
  • Inspection and restoration of navigation projects
  • Rehabilitation of damaged flood control works
    under PL 84-99 or specific projects, such as MRT
  • EOC activation (Code 210)

FOS 100 Federal TA Technical Assistance
100 Federal DFA Direct Federal Assistance
Cost shared with State
ALL OF THE ABOVE ARE FEDERAL OPERATIONS SUPPORT
(FOS) (100 FEDERALLY FUNDED)