Title: Industrial Wastewater Pretreatment
1Industrial Wastewater Pretreatment
- Joseph Cerrone-Permit Administrator
- Philadelphia Water Department
- Industrial Waste Unit
2Industrial Wastewater Pretreatment
- Definitions
- PWDS Pretreatment Program
- Types of Sewer Systems
- POTW Tour
3Defining Terms
- CWA (1977)
- POTW
- NPDES
- OCPSF
4POTW
- Publicly Owned Treatment Works
5SURCHARGE
- SUSPENDED SOLIDS (SS)
- BIOLOGICAL OXYGEN DEMAND (BOD)
6CATEGORICAL
- Of or relating to a category or categories.
7CATEGORICAL
- Electroplating
- OCPSF Chemical Manufacturing
- Metal finishing
- Laundry
8LOCAL LIMITS
- Pretreatment parameters imposed by the POTW.
- May be more strict than the Federal parameters
but not less strict.
9OUTFALL
- The Point of Discharge for a Sewer.
10(No Transcript)
11Industrial Pretreatment
- Company fills out a BMR.
- Permit is written to reflect wastewater
discharge. - Permit is administered
12TO WHOM DOES PRETREATMENT APPLY ?
- Any contributor with the potential to discharge a
harmful material or a compatible material in
amounts that could overwhelm the treatment
process.
13What does a permit look like?
- Part I -
- Process Description
- Identifying Information
- Details of Process Point(s) of Discharge
- Applicable Local and Federal Categorical Limits
14What does a permit look like?
- Part II
- Listing of Limits
15What does a permit look like?
- Part III
- Monitoring Requirements
16What does a permit look like?
- Part IV - Standard Conditions
- Reporting Formats
- Spill Prevention Requirements
- Certification Requirements
17Why Have Pretreatment?
- Protect Investment in Physical Plant
- System for Pollution Reduction
- Federal Law Requires Plants gt5 MGD to
- Meet Basic Federal Standards
- Obtain Federal Approval
18Guadalajara, Mexico
- April, 1992
- Combustible Solvent
- Sewer System Explosion
- Test L.E.L. Before Opening Manholes
19HOW ARE PERMITS ADMINISTERED ?
- Periodic Inspections
- Independent Sampling
- Review Formal Spill Plans
20HOW ARE PERMITS ADMINISTERED ?
- Evaluation of User Reports
- Sampling
- Analytical Data
- Off Site Disposal
21Representative Samples
- ISCO Automatic Sampler
- Computer controlled
- Time or Flow Proportioned Samples
- Discrete or Composite Samples
22HOW ARE PERMITS ADMINISTERED ?
- Notice of Violation - NOVs
- Late Reports
- Failed Sampling Results
- Exceedance of Numerical Pollution Limits
23HOW ARE PERMITS ADMINISTERED ?
- Fines Imposed - According to Published
Enforcement Response Plan - Corrective Action Plans - To Bring Industries
into Compliance
24Types of Sewer Systems
25Combined Sewer Systems
- One Sewer in the street.
- Contains both sewage rainwater runoff.
- Rain event results in discharge to receiving
stream..
Portable Tank
26Separate Sewer systems
- Two sewers in the street
- Sanitary sewer.
- Storm sewer.
27CONFINED SPACE ENTRY CONSIDERATIONS
- LOWER EXPLOSIVE LIMIT (LEL)
- HYDROGEN SULFIDE (H2S)
- OXYGEN LEVEL (21)
- FALL PROTECTION
28POTW Tour
- N. E. Waste Water Treatment Plant
- 3895 Richmond Street
29Bar Screen
- Prevents Pump Damage
- Removes Coarse Debris
- Rake Cleans Screen Periodically
- Debris Sent to Landfill
30Large Capacity Pumps
- 45 Lift
- 210 MGD
- Constant Variable Speed
- Diurnal Cycle
31Detritus Basins
- Slows Velocity
- 55 Diameter
- Removes Inorganic Particles (Grit)
32Detritus Basin
- Grit Falls to Bottom
- Screw Conveyor Transport
- To Landfill
33Primary Sedimentation Tanks
- Organic Sludge Drops to Bottom
- Sludge to Digesters
- Grease Floats
34Aeration Tank
- Enhances Bacterial Growth Action
35Final Sedimentation
- Final Polishing
- Removes More Organic Solids
36Alternatives to Pretreatment